36C25219B0038-0003007.pdf
PDF 111 KB Posted
- Attached to
- 556-305, Construct New Parking Garage Federal contract opportunity
- Solicitation number
- 36C25219B0038
About this file
36C25219B0038 0003 230923 - Direct Digital Control System for HVAC.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25219B0038-0007001.pdf | ||
| 36C25219B0038-0007000.docx | DOCX document | |
| 36C25219B0038-0006000.docx | DOCX document | |
| 36C25219B0038-0005000.docx | DOCX document | |
| 36C25219B0038-0005001.pdf | ||
| 36C25219B0038-0005002.pdf | ||
| 36C25219B0038-0004000.docx | DOCX document | |
| 36C25219B0038-0003005.pdf | ||
| 36C25219B0038-0003008.pdf | ||
| 36C25219B0038-0003002.pdf | ||
| 36C25219B0038-0003001.pdf | ||
| 36C25219B0038-0003004.pdf | ||
| 36C25219B0038-0003006.pdf | ||
| 36C25219B0038-0003009.pdf | ||
| 36C25219B0038-0003010.pdf | ||
| 36C25219B0038-0003000.docx | DOCX document | |
| 36C25219B0038-0003003.pdf | ||
| 36C25219B0038-0002000.docx | DOCX document | |
| 36C25219B0038-0001001.pdf | ||
| 36C25219B0038-0001000.docx | DOCX document | |
| 36C25219B0038-003.pdf | ||
| 36C25219B0038-005.pdf | ||
| 36C25219B0038-004.pdf | ||
| 36C25219B0038-001.docx | DOCX document | |
| 36C25219B0038-006.pdf | ||
| 36C25219B0038-002.pdf | ||
| 36C25219B0038-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct New Parking Garage Bid Document Captain James A. Lovell (Amendment A00002) Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 1
SECTION 23 09 23
DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
PART 1 - GENERAL
1.1 DESCRIPTION
A. Provide integration with the existing direct-digital control system as indicated on the project documents, point list, interoperability tables, drawings and as described in these specifications. Include all engineering, programming, controls and installation materials, installation labor, commissioning and start-up, training, final project documentation and warranty.
1. The indicated temperature sensors shall be integrated with the existing direct-digital control system. Coordinate tie-in location with the COR.
2. The work administered by this Section of the technical specifications shall include all labor, materials, special tools, equipment, enclosures, and power supplies. Project specific software configurations and database entries, interfaces, wiring, tubing, installation, labeling, engineering, calibration, documentation, submittals, testing, verification, training services, permits and licenses, transportation, shipping, handling, administration, supervision, management, insurance, Warranty, specified services and items required for complete and fully functional Controls Systems.
B. Some products are furnished but not installed by the contractor administered by this Section of the technical specifications. The contractor administered by this Section of the technical specifications shall formally coordinate in writing and receive from other contractors’ formal acknowledgements in writing prior to submission the installation of the products. These products include the following:
1. Sensors.
C. Some products are installed but not furnished by the contractor administered by this Section of the technical specifications. The contractor administered by this Section of the technical specifications shall formally coordinate in writing and receive from other contractors’ formal acknowledgements in writing prior to submission the procurement of the products. These products include the following:
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 2
1. Factory-furnished accessory thermostats and sensors furnished with unitary equipment.
D. Some products are not provided by, but are nevertheless integrated with the work executed by, the contractor administered by this Section of the technical specifications. The contractor administered by this
Section of the technical specifications shall formally coordinate in writing and receive from other contractors’ formal acknowledgements in writing prior to submission the particulars of the products. These products include the following:
1. The following systems have limited control (as individually noted below) from the ECC:
a. Constant temperature rooms: temperature out of acceptable range and status alarms.
b. Elevators: status alarms.
c. Sanitary sewage pumps: status alarm.
E. Responsibility Table:
Work/Item/System Furnish Install Low Voltage Wiring
Line Power
Control system low voltage and communication wiring
23 09 23 23 09 23 23 09 23 N/A
All control system nodes, equipment, housings, enclosures and panels.
23 09 23 23 09 23 23 09 23 26
A/C Unit field-mounted controls
23 23 26 26
Control system interface with A/C controls
23 09 23 23 09 23 23 09 23 26
A/C unit controls interface with control system
23 23 09 23 23 09 23 26
F. This facility’s existing direct-digital control system is manufactured by Automated Logic. The contractor administered by this Section of the technical specifications shall observe the capabilities, communication network, services, spare capacity of the existing control system and its ECC prior to beginning work.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 3
G. This campus has standardized on an existing Automated Logic (verify with the COR)system supported by a preselected controls service company. This entity is referred to as the “Control System Integrator” in this Section of the technical specifications. The Control system integrator is responsible for ECC system graphics and expansion. It also prescribes control system-specific commissioning/ verification procedures to the contractor administered by this Section of the technical specification. It lastly provides limited assistance to the contractor administered by this Section of the technical specification in its commissioning/verification work.
1. The General Contractor of this project shall directly hire the
Control System Integrator in a contract separate from the contract procuring the controls contractor administered by this Section of the technical specifications.
2. The contractor administered by this Section of the technical specifications shall coordinate all work with the Control System
Integrator. The contractor administered by this Section of the technical specifications shall integrate the Metasys network(s) with the Control System Integrator’s area control through an Ethernet connection provided by the Control System Integrator.
3. Responsibility Table:
Item/Task Section 23 09 23 contactor
Control system integrator
VA
ECC expansion X ECC programming X Devices, controllers, control panels and equipment
X
Point addressing: all hardware and software points including setpoint, calculated point, data point(analog/ binary), and reset schedule point
X
Point mapping X Network Programming X ECC Graphics X Controller programming and sequences X Integrity of LAN communications X Electrical wiring X Operator system training X LAN connections to devices X LAN connections to ECC X IP addresses X Overall system verification X
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 4
Controller and LAN system verification X
H. Unitary standalone systems including Unit Heaters, Fan Coil Units, Base
Board Heaters, thermal comfort ventilation fans, and similar units for control of room environment conditions shall be equipped with integral controls furnished and installed by the equipment manufacturer or field mounted. Refer to equipment specifications and as indicated in project documents. Application of standalone unitary controls is limited to at least those systems wherein remote monitoring, alarm and start-up are not necessary. Examples of such systems include:
1. Vestibule heater
2. Exterior stair heater
3. Mechanical or electrical room heating and ventilation.
1.2 RELATED WORK
A. Section 23 81 00, Decentralized Unitary HVAC Equipment.
B. Section 26 05 33, Raceway and Boxes for Electrical Systems.
1.3 DEFINITION
A. Algorithm: A logical procedure for solving a recurrent mathematical problem; A prescribed set of well-defined rules or processes for the solution of a problem in a finite number of steps.
B. ARCNET: ANSI/ATA 878.1 - Attached Resource Computer Network. ARCNET is a deterministic LAN technology; meaning it's possible to determine the maximum delay before a device is able to transmit a message.
C. Analog: A continuously varying signal value (e.g., temperature, current, velocity etc.
D. BACnet: A Data Communication Protocol for Building Automation and
Control Networks, ANSI/ASHRAE Standard 135. This communications protocol allows diverse building automation devices to communicate data over and services over a network.
E. BACnet/IP: Annex J of Standard 135. It defines and allows for using a reserved UDP socket to transmit BACnet messages over IP networks. A
BACnet/IP network is a collection of one or more IP sub-networks that share the same BACnet network number.
F. BACnet Internetwork: Two or more BACnet networks connected with routers. The two networks shall sue different LAN technologies.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 5
G. BACnet Network: One or more BACnet segments that have the same network address and are interconnected by bridges at the physical and data link layers.
H. BACnet Segment: One or more physical segments of BACnet devices on a
BACnet network, connected at the physical layer by repeaters.
I. BACnet Broadcast Management Device (BBMD): A communications device which broadcasts BACnet messages to all BACnet/IP devices and other
BBMDs connected to the same BACnet/IP network.
J. BACnet Interoperability Building Blocks (BIBBs): BACnet
Interoperability Building Blocks (BIBBs) are collections of one or more
BACnet services. These are prescribed in terms of an "A" and a "B" device. Both of these devices are nodes on a BACnet internetwork.
K. BACnet Testing Laboratories (BTL). The organization responsible for testing products for compliance with the BACnet standard, operated under the direction of BACnet International.
L. Baud: It is a signal change in a communication link. One signal change can represent one or more bits of information depending on type of transmission scheme. Simple peripheral communication is normally one bit per Baud. (e.g., Baud rate = 78,000 Baud/sec is 78,000 bits/sec, if one signal change = 1 bit).
M. Binary: A two-state system where a high signal level represents an "ON" condition and an "OFF" condition is represented by a low signal level.
N. BMP or bmp: Suffix, computerized image file, used after the period in a
DOS-based computer file to show that the file is an image stored as a series of pixels.
O. Bus Topology: A network topology that physically interconnects workstations and network devices in parallel on a network segment.
P. Control Unit (CU): Generic term for any controlling unit, stand-alone, microprocessor based, digital controller residing on secondary LAN or
Primary LAN, used for local controls or global controls
Q. Deadband: A temperature range over which no heating or cooling is supplied, i.e., 22-25 degrees C (72-78 degrees F), as opposed to a single point change over or overlap).
R. Device: a control system component that contains a BACnet Device Object and uses BACnet to communicate with other devices.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 6
S. Device Object: Every BACnet device requires one Device Object, whose properties represent the network visible properties of that device.
Every Device Object requires a unique Object Identifier number on the
BACnet internetwork. This number is often referred to as the device instance.
T. Device Profile: A specific group of services describing BACnet capabilities of a device, as defined in ASHRAE Standard 135-2008, Annex L. Standard device profiles include BACnet Operator Workstations
(B-OWS), BACnet Building Controllers (B-BC), BACnet Advanced
Application Controllers (B-AAC), BACnet Application Specific
Controllers (B-ASC), BACnet Smart Actuator (B-SA), and BACnet Smart
Sensor (B-SS). Each device used in new construction is required to have a PICS statement listing which service and BIBBs are supported by the device.
U. Diagnostic Program: A software test program, which is used to detect and report system or peripheral malfunctions and failures. Generally, this system is performed at the initial startup of the system.
V. Direct Digital Control (DDC): Microprocessor based control including
Analog/Digital conversion and program logic. A control loop or subsystem in which digital and analog information is received and processed by a microprocessor, and digital control signals are generated based on control algorithms and transmitted to field devices in order to achieve a set of predefined conditions.
W. Distributed Control System: A system in which the processing of system data is decentralized and control decisions can and are made at the subsystem level. System operational programs and information are provided to the remote subsystems and status is reported back to the
Engineering Control Center. Upon the loss of communication with the
Engineering Control center, the subsystems shall be capable of operating in a stand-alone mode using the last best available data.
X. Download: The electronic transfer of programs and data files from a central computer or operation workstation with secondary memory devices to remote computers in a network (distributed) system.
Y. DXF: An AutoCAD 2-D graphics file format. Many CAD systems import and export the DXF format for graphics interchange.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 7
Z. Electrical Control: A control circuit that operates on line or low voltage and uses a mechanical means, such as a temperature sensitive bimetal or bellows, to perform control functions, such as actuating a switch or positioning a potentiometer.
AA. Electronic Control: A control circuit that operates on low voltage and uses solid-state components to amplify input signals and perform control functions, such as operating a relay or providing an output signal to position an actuator.
BB. Engineering Control Center (ECC): The centralized control point for the intelligent control network. The ECC comprises of personal computer and connected devices to form a single workstation.
CC. Ethernet: A trademark for a system for exchanging messages between computers on a local area network using coaxial, fiber optic, or twisted-pair cables.
DD. Firmware: Firmware is software programmed into read only memory (ROM) chips. Software shall not be changed without physically altering the chip.
EE. Gateway: Communication hardware connecting two or more different protocols. It translates one protocol into equivalent concepts for the other protocol. In BACnet applications, a gateway has BACnet on one side and non-BACnet (usually proprietary) protocols on the other side.
FF. GIF: Abbreviation of Graphic interchange format.
GG. Graphic Program (GP): Program used to produce images of air handler systems, fans, chillers, pumps, and building spaces. These images can be animated and/or color-coded to indicate operation of the equipment.
HH. Graphic Sequence of Operation: It is a graphical representation of the sequence of operation, showing all inputs and output logical blocks.
II. I/O Unit: The section of a digital control system through which information is received and transmitted. I/O refers to analog input
(AI, digital input (DI), analog output (AO) and digital output (DO).
Analog signals are continuous and represent temperature, pressure, flow rate etc, whereas digital signals convert electronic signals to digital pulses (values), represent motor status, filter status, on-off equipment etc.
JJ. I/P: a method for conveying and routing packets of information over LAN paths. User Datagram Protocol (UDP) conveys information to “sockets”
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 8 without confirmation of receipt. Transmission Control Protocol (TCP) establishes "sessions", which have end-to-end confirmation and guaranteed sequence of delivery.
KK. JPEG: A standardized image compression mechanism stands for Joint
Photographic Experts Group, the original name of the committee that wrote the standard.
LL. Local Area Network (LAN): A communication bus that interconnects operator workstation and digital controllers for peer-to-peer communications, sharing resources and exchanging information.
MM. Network Repeater: A device that receives data packet from one network and rebroadcasts to another network. No routing information is added to the protocol.
NN. MS/TP: Master-slave/token-passing (ISO/IEC 8802, Part 3). It is not an acceptable LAN option for VA health-care facilities. It uses twisted-pair wiring for relatively low speed and low-cost communication.
OO. Native BACnet Device: A device that uses BACnet as its primary method of communication with other BACnet devices without intermediary gateways. A system that uses native BACnet devices at all levels is a native BACnet system.
PP. Network Number: A site-specific number assigned to each network segment to identify for routing. This network number shall be unique throughout the BACnet internetwork.
QQ. Object: The concept of organizing BACnet information into standard components with various associated properties. Examples include analog input objects and binary output objects.
RR. Object Identifier: An object property used to identify the object, including object type and instance. Object Identifiers shall be unique within a device.
SS. Object Properties: Attributes of an object. Examples include present value and high limit properties of an analog input object. Properties are defined in ASHRAE 135; some are optional, and some are required.
Objects are controlled by reading from and writing to object properties.
TT. Operating system (OS): Software, which controls the execution of computer application programs.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 9
UU. PCX: File type for an image file. When photographs are scanned onto a personal computer they can be saved as PCX files and viewed or changed by a special application program as Photo Shop.
VV. Peripheral: Different components that make the control system function as one unit. Peripherals include monitor, printer, and I/O unit.
WW. Peer-to-Peer: A networking architecture that treats all network stations as equal partners- any device can initiate and respond to communication with other devices.
XX. PICS: Protocol Implementation Conformance Statement, describing the
BACnet capabilities of a device. All BACnet devices have published
PICS.
YY. PID: Proportional, integral, and derivative control, used to control modulating equipment to maintain a setpoint.
ZZ. Repeater: A network component that connects two or more physical segments at the physical layer.
AAA. Router: a component that joins together two or more networks using different LAN technologies. Examples include joining a BACnet Ethernet
LAN to a BACnet MS/TP LAN.
BBB. Sensors: devices measuring state points or flows, which are then transmitted back to the DDC system.
CCC. Thermostats: devices measuring temperatures, which are used in control of standalone or unitary systems and equipment not attached to the DDC system.
1.4 QUALITY ASSURANCE
A. Criteria:
1. Single Source Responsibility of subcontractor: The Contractor shall obtain hardware and software supplied under this Section and delegate the responsibility to a single source controls installation subcontractor. The controls subcontractor shall be responsible for the complete design, installation, and commissioning of the system.
The controls subcontractor shall be in the business of design, installation and service of such building automation control systems similar in size and complexity.
2. Equipment and Materials: Equipment and materials shall be cataloged products of manufacturers regularly engaged in production and installation of HVAC control systems. Products shall be
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 10 manufacturer’s latest standard design and have been tested and proven in actual use.
3. The controls subcontractor shall provide a list of no less than five similar projects which have building control systems as specified in this Section. These projects shall be on-line and functional such that the Department of Veterans Affairs COR would observe the control systems in full operation.
4. The controls subcontractor shall have in-place facility within 50 miles with technical staff, spare parts inventory for the next five
(5) years, and necessary test and diagnostic equipment to support the control systems.
5. The controls subcontractor shall have minimum of three years experience in design and installation of building automation systems similar in performance to those specified in this Section. Provide evidence of experience by submitting resumes of the project manager, the local branch manager, project engineer, the application engineering staff, and the electronic technicians who would be involved with the supervision, the engineering, and the installation of the control systems. Training and experience of these personnel shall not be less than three years. Failure to disclose this information shall be a ground for disqualification of the supplier.
6. Provide a competent and experienced Project Manager employed by the
Controls Contractor. The Project Manager shall be supported as necessary by other Contractor employees in order to provide professional engineering, technical and management service for the work. The Project Manager shall attend scheduled Project Meetings as required and shall be empowered to make technical, scheduling and related decisions on behalf of the Controls Contractor.
B. Codes and Standards:
1. All work shall conform to the applicable Codes and Standards.
2. Electronic equipment shall conform to the requirements of FCC
Regulation, Part 15, Governing Radio Frequency Electromagnetic
Interference, and be so labeled.
1.5 PERFORMANCE
A. The system shall conform to the following:
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 11
1. Graphic Display: The system shall display up to four (4) graphics on a single screen with a minimum of twenty (20) dynamic points per graphic. All current data shall be displayed within ten (10) seconds of the request.
2. Graphic Refresh: The system shall update all dynamic points with current data within eight (8) seconds. Data refresh shall be automatic, without operator intervention.
3. Object Command: The maximum time between the command of a binary object by the operator and the reaction by the device shall be two (2) seconds. Analog objects shall start to adjust within two (2) seconds.
4. Object Scan: All changes of state and change of analog values shall be transmitted over the high-speed network such that any data used or displayed at a controller or work-station shall be current, within the prior six (6) seconds.
5. Alarm Response Time: The maximum time from when an object goes into alarm to when it is annunciated at the workstation shall not exceed
(10) seconds.
6. Program Execution Frequency: Custom and standard applications shall be capable of running as often as once every (5) seconds. The
Contractor shall be responsible for selecting execution times consistent with the mechanical process under control.
7. Multiple Alarm Annunciations: All workstations on the network shall receive alarms within five (5) seconds of each other.
8. Performance: Programmable Controllers shall be able to execute DDC
PID control loops at a selectable frequency from at least once every one (1) second. The controller shall scan and update the process value and output generated by this calculation at this same frequency.
9. Reporting Accuracy: Listed below are minimum acceptable reporting end-to-end accuracies for all values reported by the specified system:
Measured Variable Reported Accuracy
Space temperature ±0.5C (±1F)
Note 1: for both absolute and differential pressure
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 12
10. Control stability and accuracy: Control sequences shall maintain measured variable at setpoint within the following tolerances:
Controlled Variable Control Accuracy Range of Medium
Space Temperature ±1.0ºC (±2.0ºF)
11. Extent of direct digital control: control design shall allow for at least the points indicated on the points lists on the drawings.
1.6 WARRANTY
A. Labor and materials for control systems shall be warranted for a period as specified under Warranty in FAR clause 52.246-21.
B. Control system failures during the warranty period shall be adjusted, repaired, or replaced at no cost or reduction in service to the owner.
The system includes all computer equipment, transmission equipment, and all sensors and control devices.
1.7 SUBMITTALS
A. Submit shop drawings in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer’s literature and data for all components including the following:
1. A wiring diagram for each type of input device and output device including DDC controllers, modems, repeaters, etc. Diagram shall show how the device is wired and powered, showing typical connections at the digital controllers and each power supply, as well as the device itself. Show for all field connected devices, including control relays, motor starters, electric or electronic actuators, and temperature pressure, flow and humidity sensors and transmitters.
2. Catalog cut sheets of all equipment used. This includes, but is not limited to software (by manufacturer and by third parties), DDC controllers, panels, peripherals, airflow measuring stations and associated components, and auxiliary control devices such as sensors, actuators, and control dampers. When manufacturer’s cut sheets apply to a product series rather than a specific product, the data specifically applicable to the project shall be highlighted.
Each submitted piece of literature and drawings shall clearly
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 13 reference the specification and/or drawings that it supposed to represent.
C. Product Certificates: Compliance with Article, QUALITY ASSURANCE.
D. Licenses: Provide licenses for all software residing on and used by the
Controls Systems and transfer these licenses to the Owner prior to completion.
E. Operation and Maintenance (O/M) Manuals):
1. Submit in accordance with Article, INSTRUCTIONS, in Specification
Section 01 00 00, GENERAL REQUIREMENTS.
2. Include the following documentation:
a. General description and specifications for all components, including logging on/off, alarm handling, producing trend reports, overriding computer control, and changing set points and other variables.
b. Detailed illustrations of all the control systems specified for ease of maintenance and repair/replacement procedures, and complete calibration procedures.
c. Complete troubleshooting procedures and guidelines for all systems.
d. Complete operating instructions for all systems.
e. Recommended preventive maintenance procedures for all system components including a schedule of tasks for inspection, cleaning and calibration. Provide a list of recommended spare parts needed to minimize downtime.
F. Submit Performance Report to Contracting Officer Representative prior to final inspection.
1.8 PROJECT CONDITIONS (ENVIRONMENTAL CONDITIONS OF OPERATION)
A. Sensors and controlling devices shall be designed to operate in the environment, which they are sensing or controlling.
1.9 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Heating, Refrigerating, and Air-Conditioning
Engineers (ASHRAE):
Standard 135-10 ........BACNET Building Automation and Control Networks
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 14
C. American Society of Mechanical Engineers (ASME):
B16.18-01 ..............Cast Copper Alloy Solder Joint Pressure
Fittings.
B16.22-01 ..............Wrought Copper and Copper Alloy Solder Joint
Pressure Fittings.
D. American Society of Testing Materials (ASTM):
B32-08 .................Standard Specification for Solder Metal
B88-09 .................Standard Specifications for Seamless Copper
Water Tube
B88M-09 ................Standard Specification for Seamless Copper
Water Tube (Metric)
B280-08 ................Standard Specification for Seamless Copper Tube for Air-Conditioning and Refrigeration Field
Service
D2737-03 ...............Standard Specification for Polyethylene (PE)
Plastic Tubing
E. Federal Communication Commission (FCC):
Rules and Regulations Title 47 Chapter 1-2001 Part 15: Radio Frequency
Devices.
F. Institute of Electrical and Electronic Engineers (IEEE):
802.3-11 ...............Information Technology-Telecommunications and
Information Exchange between Systems-Local and
Metropolitan Area Networks- Specific
Requirements-Part 3: Carrier Sense Multiple
Access with Collision Detection (CSMA/CD)
Access method and Physical Layer Specifications
G. National Fire Protection Association (NFPA):
70-11 ..................National Electric Code
90A-09 .................Standard for Installation of Air-Conditioning and Ventilation Systems
H. Underwriter Laboratories Inc (UL):
94-10 ..................Tests for Flammability of Plastic Materials for
Parts and Devices and Appliances
294-10 .................Access Control System Units
486A/486B-10 ...........Wire Connectors
555S-11 ................Standard for Smoke Dampers
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 15
916-10 .................Energy Management Equipment
1076-10 ................Proprietary Burglar Alarm Units and Systems
PART 2 - PRODUCTS
2.1 MATERIALS
A. Use new products that the manufacturer is currently manufacturing and that have been installed in a minimum of 25 installations. Spare parts shall be available for at least five years after completion of this contract.
2.2 COMMUNICATION
A. Indicated temperature sensors shall be compatible with the existing
Automated Logic system (verify with the COR).
PART 3 - EXECUTION
3.1 INSTALLATION
A. General:
1. Examine project plans for control devices and equipment locations;
and report any discrepancies, conflicts, or omissions to Contracting
Officer Representative for resolution before proceeding for installation.
2. Install equipment, piping, wiring /conduit parallel to or at right angles to building lines.
3. Install all equipment and piping in readily accessible locations. Do not run tubing and conduit concealed under insulation or inside ducts.
4. Mount control devices, tubing and conduit located on ducts and apparatus with external insulation on standoff support to avoid interference with insulation.
5. Provide sufficient slack and flexible connections to allow for vibration of piping and equipment.
6. Run tubing and wire connecting devices on or in control cabinets parallel with the sides of the cabinet neatly racked to permit tracing.
7. Install equipment level and plum.
B. Electrical Wiring Installation:
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 16
1. All wiring cabling shall be installed in conduits. Install conduits and wiring in accordance with Specification Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS. Conduits carrying control wiring and cabling shall be dedicated to the control wiring and cabling: these conduits shall not carry power wiring. Provide plastic end sleeves at all conduit terminations to protect wiring from burrs.
2. Install analog signal and communication cables in conduit. Install digital communication cables in conduit and in accordance with
Specification Section 27 15 00, Communications Horizontal Cabling.
3. Install conduit and wiring between operator workstation(s), digital controllers, electrical panels, indicating devices, instrumentation, miscellaneous alarm points, thermostats, and relays as shown on the drawings or as required under this section.
4. Install all electrical work required for a fully functional system and not shown on electrical plans or required by electrical specifications. Where low voltage (less than 50 volt) power is required, provide suitable Class B transformers.
5. Install all system components in accordance with local Building Code and National Electric Code.
a. Splices: Splices in shielded and coaxial cables shall consist of terminations and the use of shielded cable couplers. Terminations shall be in accessible locations. Cables shall be harnessed with cable ties.
b. Equipment: Fit all equipment contained in cabinets or panels with service loops, each loop being at least 300 mm (12 inches) long.
Equipment for fiber optics system shall be rack mounted, as applicable, in ventilated, self-supporting, code gauge steel enclosure. Cables shall be supported for minimum sag.
c. Cable Runs: Keep cable runs as short as possible. Allow extra length for connecting to the terminal board. Do not bend flexible coaxial cables in a radius less than ten times the cable outside diameter.
d. Use vinyl tape, sleeves, or grommets to protect cables from vibration at points where they pass around sharp corners, through walls, panel cabinets, etc.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 17
6. Conceal cables, except in mechanical rooms and areas where other conduits and piping are exposed.
7. Permanently label or code each point of all field terminal strips to show the instrument or item served. Color-coded cable with cable diagrams shall be used to accomplish cable identification.
8. Grounding: ground electrical systems per manufacturer’s written requirements for proper and safe operation.
C. Install Sensors and Controls:
1. Temperature Sensors:
a. Install all sensors and instrumentation according to manufacturer’s written instructions. Temperature sensor locations shall be readily accessible, permitting quick replacement and servicing of them without special skills and tools.
b. Calibrate sensors to accuracy specified, if not factory calibrated.
c. Use of sensors shall be limited to its duty, e.g., duct sensor shall not be used in lieu of room sensor.
d. Install room sensors permanently supported on wall frame. They shall be mounted at 1.5 meter (5.0 feet) above the finished floor.
e. Mount sensors rigidly and adequately for the environment within which the sensor operates. Separate extended-bulb sensors form contact with metal casings and coils using insulated standoffs.
f. Sensors used in mixing plenum, and hot and cold decks shall be of the averaging of type. Averaging sensors shall be installed in a serpentine manner horizontally across duct. Each bend shall be supported with a capillary clip.
g. All pipe mounted temperature sensors shall be installed in wells.
h. All wires attached to sensors shall be air sealed in their conduits or in the wall to stop air transmitted from other areas affecting sensor reading.
i. Permanently mark terminal blocks for identification. Protect all circuits to avoid interruption of service due to short-circuiting or other conditions. Line-protect all wiring that comes from external sources to the site from lightning and static electricity.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 18
3.2 SYSTEM VALIDATION AND DEMONSTRATION
A. As part of final system acceptance, a system demonstration is required
(see below). Prior to start of this demonstration, the contractor is to perform a complete validation of all aspects of the controls and instrumentation system.
B. Validation
1. Prepare and submit for approval a validation test plan including test procedures for the performance verification tests. Test Plan shall address all specified functions of the ECC and all specified sequences of operation. Explain in detail actions and expected results used to demonstrate compliance with the requirements of this specification. Explain the method for simulating the necessary conditions of operation used to demonstrate performance of the system. Test plan shall include a test check list to be used by the
Installer’s agent to check and initial that each test has been successfully completed. Deliver test plan documentation for the performance verification tests to the owner’s representative 30 days prior to start of performance verification tests. Provide draft copy of operation and maintenance manual with performance verification test.
2. After approval of the validation test plan, installer shall carry out all tests and procedures therein. Installer shall completely check out, calibrate, and test all connected hardware and software to ensure that system performs in accordance with approved specifications and sequences of operation submitted. Installer shall complete and submit Test Check List.
C. Demonstration
1. System operation and calibration to be demonstrated by the installer in the presence of the Architect or Contracting Officer’s
Representative on random samples of equipment as dictated by the
Architect or Contracting Officer’s Representative. If random sampling indicates improper commissioning, the owner reserves the right to subsequently witness complete calibration of the system at no addition cost to the VA.
2. Demonstrate to authorities that all required safeties and life safety functions are fully functional and complete.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 19
3. Make accessible, personnel to provide necessary adjustments and corrections to systems as directed by balancing agency.
4. The following witnessed demonstrations of field control equipment shall be included:
a. Test application software for its ability to communicate with digital controllers, operator workstation, and uploading and downloading of control programs.
b. Demonstrate reporting of alarm conditions for each alarm and ensure that these alarms are received at the assigned location, including operator workstations.
Federal Health Care Center Project No. 556-305
Revised April 17, 2019
23 09 23 - 20
3.3 CONTROL POINTS LISTS
Sump pump alarm status
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Tren d
Alar m
Show On Graphic
Pump alarm status x x x
Totals 0 0 1 0 0 0 0 0 0 1 1
Total Hardware (1) Total Software (1)
Elevator status
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Tren d
Alar m
Show On Graphic
Elevator alarm status x x x
Totals 0 0 1 0 0 0 0 0 0 1 1
Total Hardware (1) Total Software (1)
Constant temperature room status
- - - E N D - - -
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Tren d
Alar m
Show On Graphic
Cooling set-point x x x
Room temperature x x x
High Temperature Alarm x x
Totals 1 0 1 0 0 0 0 0 2 1 3
Total Hardware (2) Total Software (3)
| Note 1: for both absolute and differential pressure |
| 3.1 INSTALLATION |