3-BPM005725 - Qualifications of Personnel - RTS.pdf
PDF 5 MB Posted
- Attached to
- Master Agreement AZ|CTR070669
- Contract number
- CTR070669
- Issued by
- Arizona
About this file
This document appears to be a compilation of professional resumes for key personnel from Omni Electric, a construction and electrical services company with extensive experience in transportation infrastructure projects. The personnel profiles highlight work primarily conducted in Arizona for the Arizona Department of Transportation (ADOT), with additional projects in Texas. The team includes Cameron Peck (Project Manager), Reid Osten (General Superintendent), Rich Martin (Foreman), Scott Martinmaas (Operations Manager), Alexander Diaz (Director of Operations), and Todd Gladden (Vice President).
The resumes showcase a robust portfolio of transportation infrastructure projects, including highway improvements, traffic interchanges, lighting installations, signalization, and maintenance work. Notable projects include the South Mountain Freeway Loop 202 (22-mile highway construction), US-60 and SR-303L Interim Traffic Interchange, I-17 Flex Lane Improvement Project, and multiple statewide lighting maintenance and foundation replacement projects. The team demonstrates expertise in complex transportation infrastructure work involving highway widening, traffic signal modifications, lighting systems, fiber optics, CCTV installations, and associated civil engineering tasks. Their projects range from $2.1 million to $46 million, indicating capability to manage large-scale, technically complex transportation infrastructure developments.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMERON PECK
Project Manager
YEARS OF EXPERIENCE
10 Years at Haydon / 10 Years Total Experience
EDUCATION &
CERTIFICATIONS
BS, Construction
Arizona State University
WORK EXPERIENCE
2020 - Present
HAYDON BUILDING CORP
Project Manager
2013 - 2020
HAYDON BUILDING CORP
Project Engineer
SELECT PROJECT EXPERIENCE:
ADOT, US-60 & SR-303L Interim Traffic Interchange CMAR - Phoenix, AZ
This project is two miles in length along SR-303L, extending from Mountain View Road to one mile north of the US-60. Haydon’s scope of work includes adding three general purpose lanes to SR-303L, widening US-60 to three lanes in each direction, installing new ramps to provide connectivity between SR-303L and US-60, and widening a bridge on SR-303L that crosses the BNSF railroad.
Soundwalls were installed throughout the project limits as well as architectural treatments to enhance the aesthetics of the corridor. $46M
ADOT El Mirage Road Traffic Interchange - Phoenix, AZ Construction of an elevated intersection at the SR303 and El Mirage Road.
$19.8M
City of Peoria 75th Ave Intersection Safety Improvements CMAR
- Peoria, AZ – Project was Administered by A.D.O.T.
Work at the intersection of 75th Ave and Cactus and the intersection of 75th Ave and Peoria consisted of constructing intersection widening and ADA upgrades associated with safety improvements as part of HSIP funding. Work includes removal and replacement of asphaltic concrete pavement; installing new drainage and waterline facilities; updating to current ADA standards;
replacing pavement markings; removing and installing lighting; landscaping, and other miscellaneous work. $11.0M
TxDOT, IH-30 Frontage Roads & Park & Ride - Grand Prairie, TX
This project included improvements to and along Interstate 30 (Tom Landry Highway). Features include eastbound and westbound frontage roads, access ramps at Belt Line Road and MacArthur Boulevard, and a full-scale park and ride facility. The scope of work included the installation of potable water, storm drain systems, structural retaining walls, paving, electrical, landscaping, hardscaping, signage and pavement markings, a new pedestrian shelter canopy, and construction of a new U-turn under the MacArthur overpass bridge.
$17.2M
REID OSTEN
General Superintendent
SELECT PROJECT EXPERIENCE:
ADOT Lighting Maintenance Project – Statewide, AZ Remove and replace lighting fixtures and parts. Trouble shooting electrical issues and repairing any necessary damaged wiring and pull boxes.
ADOT Statewide Foundation Maintenance Project – Statewide, AZ Remove and replace damaged lighting foundations as requested.
ADOT I-10 Signalization Rewire Project – Phoenix, AZ Remove and replace all wiring in signalized intersections and TI intersections.
South Mountain Loop 202 Freeway new build – Phoenix, AZ Installation of Lighting, Signals, CCTV, Fiber Optics and DMS.
ADOT Statewide Pole Replacement – Statewide, AZ Removal and replacement of all types and sizes of lighting poles and fixtures.
ADOT I-10 Deck Park LED Project – Phoenix, AZ Remove and replace lighting components to LED conversion in the deck park tunnel.
ADOT I-10 US89 Cameron Project – Cameron, AZ 4-Mile improved roadway widening including Lighting, loop counters, tunnel improvement lighting.
YEARS OF EXPERIENCE
20 Years working with
ADOT Lighting, Transportation and Maintenance projects.
IMSA Level II
OSHA30
ATSSA Certified
WORK EXPERIENCE
Current
Omni Electric General Superintendent
2001 - 2023 CS Construction
Foreman
Reid B. Osten is hereby certified as a
Renewal IMSA Traffic Signal Constr.Tech II by completing all requirements and examination for certification on 12/16/2021
Valid thru 12/16/2024 Certification #BC_84507
RICH MARTIN
SELECT PROJECT EXPERIENCE:
ADOT Lighting Maintenance Project – Statewide, AZ Remove and replace lighting fixtures and parts. Trouble shooting electrical issues and repairing any necessary damaged wiring and pull boxes.
ADOT Statewide Foundation Maintenance Project – Statewide, AZ Remove and replace damaged lighting foundations as requested.
ADOT I-10 Signalization Rewire Project – Phoenix, AZ Remove and replace all wiring in signalized intersections and TI intersections.
ADOT SR51 Piestewa Fwy Project – Phoenix, AZ 11-Mile of improvements with additional lanes in both directions.
Improvements included traffic interchange signal modifications, CCTV, Fiber and improved highway lighting.
ADOT I-10 Dust Detection and Warning system Project – Picacho Peak, AZ 10 – Miles of detection for dust storm along I-10. Utilizing visibility detectors, a weather radar system and speed sensors.
YEARS OF EXPERIENCE
26 Years working with and Maintenance projects
IMSA Level II
OSHA 30
CDL License
WORK EXPERIENCE
Current
Omni Electric Foreman
2020 - 2023 William Charles
Foreman
2010 - 2020
Richard P. Martin
Renewal IMSA Traffic Signal Technician I by completing all requirements and examination for certification on 4/24/2022
Valid thru 4/24/2025 Certification #AA_112829
Richard P. Martin
Renewal IMSA Traffic Signal Field Tech II by completing all requirements and examination for certification on 4/24/2022
Valid thru 4/24/2025 Certification #BE_112829
SCOTT MARTINMAAS
Operations Manager
SELECT PROJECT EXPERIENCE:
ADOT Lighting Maintenance Project – Statewide, AZ Remove and replace lighting fixtures and parts. Trouble shooting electrical issues and repairing any necessary damaged wiring and pull boxes.
ADOT Statewide Foundation Maintenance Project – Statewide, AZ Remove and replace damaged lighting foundations as requested.
ADOT I-10 Signalization Rewire Project – Phoenix, AZ Remove and replace all wiring in signalized intersections and TI intersections.
South Mountain Loop 202 Freeway new build – Phoenix, AZ 22-Mile new Highway construction from Westbound I-10 to Eastbound I-10.
DBM project included Highway lighting, Traffic Signal Interchanges, CCTV, Fiber Optics, Sign Structures and DMS.
ADOT Statewide Pole Replacement – Statewide, AZ Removal and replacement of all types and sizes of lighting poles and fixtures.
Loop 101 (Pima Freeway) Improvement Project - Phoenix, AZ 11-Mile of improvements with additional lanes in both directions.
Improvements included traffic interchange signal modifications, CCTV, Fiber and improved highway lighting.
YEARS OF EXPERIENCE
20 Years working with and Maintenance projects.
40 Years Total Experience in all facets of transportation lighting and fiber optics.
CERTIFICATIONS
IMSA Level II
Journeyman Electrician
Qualifying Individual for AZ C-11 electrical license
WORK EXPERIENCE
Current
Omni Electric Operations Manager/Business
Development
2020 - 2022 Sturgeon Electric
Business Development
2003 - 2020
Operations Manager
ALEXANDER DIAZ
Director of Operations
SELECT PROJECT EXPERIENCE:
Gavilan Peak Parkway (Carefree Hwy to Joy Road)- Phoenix, AZ 2.5-Mile Highway to link the Carefree Highway and community of Anthem. 2 lanes each direction with bike lanes. New Guardrail, paving, striping & traffic signal.
South Mountain Freeway (Loop202) - Phoenix, AZ 22-Mile new Highway construction from Westbound I-10 to Eastbound I-10.
DBM project included Highway lighting, Traffic Signal Interchanges, CCTV, Fiber Optics, Sign Structures and DMS.
ADOT Lighting maintenance Project - Statewide, AZ Statewide contract included removing and replacing lighting fixtures and components. Purchasing Wire, Conduit
I-17 Flex Lane Improvement Project - Phoenix, AZ 23-Mile section of I-17 between Anthem Way and Sunset Point. Improvements for 15 miles of widening and 8 miles of flex lanes to include CCTV, Fiber Optics, Sign Structures, DMS, Flex Gates & Vehicle arresting barrier.
Loop 101 (Pima Freeway) Improvement Project - Phoenix, AZ 11-Mile of improvements with additional lanes in both directions.
Improvements included traffic interchange signal modifications, CCTV, Fiber and improved highway lighting.
YEARS OF EXPERIENCE
20 Years Total Experience
CERTIFICATIONS
OSHA 30
IMSA Level II
WORK EXPERIENCE
Current
Omni Electric Director of Operations
2020 - 2023 Sturgeon Electric
Operations Manager
2011 - 2020 CS Construction
Purchasing Manager
2004-2010 Stanley Consultants
Construction Inspector
TODD GLADDEN
Vice President
YEARS OF EXPERIENCE
17 Years at Haydon
20 Years Total
Experience
EDUCATION &
CERTIFICATIONS
BS, Construction Management
Northern Arizona University
OSHA 30
ATSSA Certified
WORK EXPERIENCE
Current
Omni Electric Vice President
2007 – 2023 Haydon Building Corp
Project Director /Project Manager/Project Engineer
2004 - 2007 Rummel Construction, Inc.
Project Engineer
SELECT PROJECT EXPERIENCE:
Deck Park Tunnel Fire Suppression System – Phoenix, AZ Removed and replaced the existing stainless steel water line and fire hydrants and replaced with stainless steel water line and fire hydrants in the tunnel and vent shafts for east bound and west bound lanes. $2.1M
Sunset Rest Area – Cordes Junction, AZ Renovated the south restrooms with all new interior and expanded the restroom, removed, and replaced the water line and sewer line to south restroom. New septic system and re-paved the parking lot. Re-furbished the existing water tank and upgraded the fall protection for the water tank. Installed a temporary rest area at Badger Springs during the renovations of the Sunset Rest Area. $9.56M
Lindsay Road Traffic Interchange – Gilbert, AZ The Lindsay Traffic Interchange project was contracted with the Arizona Department of Transportation, in Gilbert, Arizona. The final contract value was $22, 779, 432.76. The purpose of the project was to add On and Off Ramps for East Bound and West Bound SR 202 at Lindsay Road, and to widen Lindsay Road from Lexington Road to the south.
In addition, a frontage road was installed along SR 202, west bound to provide access for the Rivulon Development North of SR 202. The scope of work consisted of storm drain improvements, earth work, retaining walls, concrete flat work, lighting, signage, freeway management systems (FMS), and landscaping. Included on the retaining walls was a form liner patterned to represent the history of Gilberts water district and farming. $22.73M
ADOT El Mirage Road Traffic Interchange - Phoenix, AZ Construction of an elevated intersection at the SR303 and El Mirage Road.
$19.8M
City of Peoria 75th Ave Intersection Safety Improvements CMAR
- Peoria, AZ – Project was Administered by A.D.O.T.
Work at the intersection of 75th Ave and Cactus and the intersection of 75th Ave and Peoria consisted of constructing intersection widening and ADA upgrades associated with safety improvements as part of HSIP funding. Work includes removal and replacement of asphaltic concrete pavement; installing new drainage and waterline facilities; updating to current ADA standards; replacing pavement markings; removing and installing lighting; landscaping, and other miscellaneous work. $11.0M
ADOT Zuni Wash Bridge - St. John’s, AZ Construction of a single span structure to span the Zuni Wash on SR191.
Including hot in place asphalt paving of 18 miles of roadway, 9 miles on each end of the bridge. $8.0M
File details come from the government source that posted it. Updated .