This document is an AIA A305 Exhibit A detailing the Civil Division Work-in-Progress for Haydon, a construction company operating primarily in Arizona. The projects span multiple municipalities including Queen Creek, Mesa, Chandler, Scottsdale, Goodyear, and Phoenix, with owners and clients such as the Town of Queen Creek, City of Mesa, City of Chandler, Valley Metro Rail, Taylor Morrison, Google LLC, and various private developers like Mesa Skybridge LLC and NWGH, LLC.

The document lists twelve ongoing construction projects with diverse scopes including water transmission lines, roadway improvements, infrastructure development, shared use pathways, electrical substation work, light rail extension, and civil infrastructure projects. Project values range from $10,769 to $33,151,044, with most projects in active construction status and schedules spanning from late 2021 to early 2025. Key projects include a 24-inch water transmission line in Queen Creek, a Google data center site development in Mesa, road widening in Chandler, and infrastructure work for new residential and commercial developments. The projects involve extensive civil engineering work such as utility installation, roadway construction, landscaping, drainage improvements, and structural concrete work.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised 11/22/2023 Page 1 of 7

AIA A305 - EXHIBIT A

CIVIL DIVISION WORK-IN-PROGRESS

Kenworthy Rd 24” Transmission Water Main, Queen Creek AZ, PRE-

CON

Construct 5 miles of 24” water transmission waterline

Schedule:

Status: Construction

Value: $

Owner:

Town of Queen Creek 22358 S Ellsworth Rd Queen Creek AZ 85142 480-358-30010

Engineer:

WSP Environment & Infrastructure Inc 1105 Lakewood Pkwy, Ste 300 Alpharetta, GA 30009 623-418-9051 Aaron.henderson@wsp.com

Lehi Loop Shared Use Path, Mesa AZ

2.2 Mile phase of a shared use pathway, with decomposed granite horse path and lighting, along S Canal from Lehi Rd/McDowell Rd to Val Vista Dr/ Loop 202 Red Mountain

Schedule:12/2023-12/2024

Status: Construction

Value: $3,632,990.96

Owner:

City of Mesa PO Box 1466 Mesa AZ 85211 Andre Rioux 480-644-3805 Andre.rioux@mesaaz.gov

Engineer:

WSP USA Environment & Infrastructure Inc 4600 E Washington Ste 600, Phoenix AZ 85034 Dick Yano 602-733-6000 Dick.yano@wsp.com

Diamondback Substation MSA1S, Mesa AZ

Earthwork, drainage, & structural concrete for onsite Electrical substation

Schedule:11/2023-3/2024

Status: Construction

Value: $3,288,965.51

Owner:

ESI Inc 3178 Encrete Lane Dayton OH 45439 513-454-3741

Revised 11/22/2023 Page 2 of 7

Anthem Veteran’s Memorial Cir of Honor Expansion & Improvements, Anthem AZ

Expand the circle of honor by improving drainage by grading a swale and installation of curb, artificial turf, add sidewalk extension, modify flower beds

Schedule:

Status: Construction

Value: $171,094.91

Owner:

Anthem Community Council 3701 W Anthem Way, Ste 201 Anthem AZ 85086 623-742-6050 Aaron Baker abaker@anthemcouncil.com

James Martin

MSA 1A Centurian, Mesa AZ

Joint Venture between JE Dunn and Haydon to build a Data Center for Google.

Haydon’s Scope of work includes, Clear & Grub, Demolition, Mass Grading & Excavation, Site Logistics, Underground utilities including Storm Drain & structures, Sanitary Sewer, Waterline, & Fireline. Site Concrete including Slab on Grade, Sidewalk, Curb & Gutter, Heavy Duty Concrete Paving, Heavy Duty Asphalt Paving, Light Duty Asphalt Paving. Structural Concrete including Drilled Piers, Generator Pads, Pumphouse Pads, Equipment Pads, Fire Pumphouse Pad, & Grade Beams.

Schedule: 8/2023 - FR1 - Feb-2025

(Zone 1 - North half of building)

FR2 - Oct-2025

(Zone 2 - South half of building)

Schedule:

Value: $33,151,044

Owner:

Google LLC 1600 Amphitheatre Parkway Mountain View CA 94042-2050

Engineer:

HDR Engineering Inc 1917 S 67th St Omaha NE 68106

Revised 11/22/2023 Page 3 of 7

El Sol Offsite Improvements, Glendale

AZ

Installing 12” water main

Schedule: 6/2023-12/2023

Value: $2,086,324.29

Owner:

El Sol Energy Storage LLC One Suth Wacker Dr, Ste 1800 Chicago IL 60606

Desert Mountain Club MSA, Phoenix

AZ

Slurry Wash Sewer Line

Schedule:

Status: Construction

Value: $10,769.00

Owner:

Desert Mountain Club Inc 10550 E Desert Hills Rd Scottsdale AZ 85262 480-595-4260

Lucid Tool Installation Support, Casa Grande AZ

Concrete Flat Work

Schedule: 5/2023

Status: Construction

Value: $81,000

Owner:

Lucid USA Inc 317 S Thornton Rd Casa Grande AZ 85193

North 96th St Extension, Scottsdale AZ

Schedule: 1/3/2023 – 4/1/2024

Status: Construction

Value: $1,529,975.57

Owner:

Brandon Pobiak 10040 E Happy Valley Rd, Unit 297 Scottsdale AZ 85255 602-315-5600

Jarrett Engineering, LLC 7650 S McClintock Dr, Ste 103 Tempe AZ 85284

Revised 11/22/2023 Page 4 of 7

Vestar Queen Creek Crossing Shops A&B

Schedule: 11/2022-

Status: Construction

Value: $4,060,856

Owner:

Vestar Queen Crek Crossing LLC 2415 E Camelback, Ste 100 Phoenix AZ 85016

Engineer:

Upward Architects 1155 W Rio Salado Pkwy, Ste B- Tempe AZ

Designer:

Optimus Civil Design Group 4650 E Cotton Center Blvd, Ste Phoenix AZ 85040

Ocotillo Rd Improvements-Gilbert Rd to 148th St, Chandler AZ

Widening roadway to include two through lanes in each direction, turn lanes bike lanes, raised medians, streetlights traffic signals, fiber network, drainage, and utility improvements

Schedule: 12/2022- 12/2024

Status: Construction

Value: $10,317,486

Owner:

City of Chandler 215 E Buffalo Chandler AZ 85225

Designer:

Atek Engineering Consultants 111 S Weber Dr, Ste 1 Chandler AZ 85226 480-659-8065

Revised 11/22/2023 Page 5 of 7

SkyBridge Arizona Phase One- Site/Hotel, Mesa Az

Construct approximately one half mile of major collector streets on Sossaman Rd.

one half mile North of Pecos on the Mesa Gateway Airport property.

Flatwork consists of sidewalk, curb & gutter, ramps and driveways.

Installation of wet utilities such as 12” DIP waterline & services, 12” PVC sewerline, 18”/24”/36” storm drain RCP.

Dry utilities including SRP, SW Gas, landscape irrigation and electrical street lighting. Landscape includes but not limited to 2,000EA- 5 gallon shrubs, 125EA-24IN Box Tree’s, 125EA-36IN Box Tree’s and a half a million square feet of DG. Structural scope incorporates storm drain headwalls, Gabion Retention Walls, Strom and Sewer Manholes and Shotcrete Gabion Berm Landforms

Schedule: 8/2022-2/2024

Status: Construction

Value: $2,269,148.13

Owner:

Mesa Skybridge LLC 2415 E Camelback, Ste 700 Phoenix AZ 85016

Designer:

RPA/Ardura 63 E Main St, Ste 502 Mesa AZ 85201

Revised 11/22/2023 Page 6 of 7

SkyBridge Arizona Phase 1A Horizontal Infrastructure, Mesa Az

Construct approximately one half mile of major collector streets on Sossaman Rd.

one half mile North of Pecos on the Mesa Gateway Airport property.

Flatwork consists of sidewalk, curb & gutter, ramps and driveways.

Installation of wet utilities such as 12” DIP waterline & services, 12” PVC sewerline, 18”/24”/36” storm drain RCP.

Dry utilities including SRP, SW Gas, landscape irrigation and electrical street lighting. Landscape includes but not limited to 2,000EA- 5 gallon shrubs, 125EA-24IN Box Tree’s, 125EA-36IN Box Tree’s and a half a million square feet of DG. Structural scope incorporates storm drain headwalls, Gabion Retention Walls, Strom and Sewer Manholes and Shotcrete Gabion Berm Landforms

Schedule: 8/2022-2/2024

Status: Construction

Value: $10,317,486

Owner:

Mesa Skybridge LLC 2415 E Camelback, Ste 700 Phoenix AZ 85016

Designer:

RPA/Ardura 63 E Main St, Ste 502 Mesa AZ 85201

Cavasson Phase 3A Infrastructure, Scottsdale AZ

New road construction (Claret Dr. & Reveille Rd.) from Legacy Blvd to Cavasson Blvd. including new waterline, sewer line, storm drain, streetlights, dry utilities, flatwork, and landscaping. The project also includes 6ea added turn bays, both eastbound and westbound, along Legacy Blvd. between Miller Rd.

and Hayden Rd.

Schedule: 7/2022-4/2023

Status: Construction

Value: $5,319,073

Owner:

NWGH, LLC c/o Nationwide Realty Investors, Ltd 375 N front St, Ste 200 Columbus OH 43215 Adam Spradin 614-857-2350 Adam.spradin@nationwide.com

Designer:

Hubbard Engineering 1201 S Alma School Rd Mesa AZ 85210

Revised 11/22/2023 Page 7 of 7

Allen Ranches, Goodyear AZ

Install sewer and waterline, roadway improvements, box culverts and OHE Underground Conversion on Camelback Road between the Loop 303 and Citrus Rd.

Schedule: 12/2021 - 04/2023

Status: Construction

Value: $5,941,954

Owner:

Taylor Morrison 9000 E Pima Center Pkwy Scottsdale AZ 85258

Hilgart Wilson

South Central Light Rail Extension, Phoenix AZ

Concrete Flat Work and Storm Drain

Schedule:6/2022-

Value: $22,000,000

Sub to:

Kiewit Infrastructure West Co 3888 E Broadway R Phoenix AZ 85040 602-426-7319 Denise.osier@kiewit.com

Owner:

Valley Metro Rail, Inc 101 N 1st Av, Se 1300 Phoenix AZ 85003