3-2025-10-01 - Climbers Run Pond Maintenance For Site Bid - Sealed.pdf

PDF 10 MB Posted

Attached to
Shenks Ferry Wildflower Preserve Pedestrian Boardwalk
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

Climbers Run Nature Center Pond Maintenance Project - Site Plans and Specifications

This document set comprises the detailed site plans and engineering specifications for pond maintenance work at the Climbers Run Nature Center, a project administered by the Lancaster Conservancy in Pequea, Pennsylvania, located in Lancaster County. The project scope includes dredging the existing pond, repairing the pond berm and outlet structures, installing toe rock protection, constructing an emergency spillway, and stabilizing streambanks. The work also encompasses the installation of a timber boardwalk and timber dock (750 square feet maximum), though these components are designated for separate bidding. The project area encompasses approximately 8 acres within Martic Township, with the pond maintenance disturbance area specifically delineated on the grading and erosion and sediment control plans. Field surveys were completed on January 31, 2024, and the site encompasses multiple soil types including Manor, Newark, and Pequea silt loams. The project is subject to NPDES permit requirements and wetland protection measures, with a seasonal restriction on clearing activities from May 15 through August 15 due to Northern Long-Eared Bat habitat considerations. Sealed bids for the overall site improvements project were due May 19, 2026, at 10 a.m. through the PennBid portal, with bids remaining open for 60 days following opening.

The project is funded in part through a state grant administered by the Pennsylvania Department of Conservation and Natural Resources and is subject to Pennsylvania Prevailing Wage Act requirements. Bidders must submit a lump sum and unit price basis proposal along with bid security equal to 10 percent of the bid amount, workmen's compensation affidavit, Public Work Employment Verification Form, and non-collusion affidavit. The successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract price. The plans specifically identify that certain components—the wetland boardwalk and pond dock with associated erosion and sediment measures—are marked for site improvements bidding separately, while remaining work constitutes the pond maintenance contract. The Lancaster Conservancy reserves the right to reject any or all bids and waive any defects, errors, omissions, irregularities, or informalities in submitted bids.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0' 2000' 4000' 6000'

SCALE: 1" = 2000'

CLIMBERS RUN NATURE CENTER POND MAINTENANCE

MARTIC TOWNSHIP, LANCASTER COUNTY, PA

SITE MAP

1" = 100'

LOCATION MAP

1" = 2,000'

PROJECT

LOCATION

CLIENT ADDRESS:

LANCASTER CONSERVANCY -

FRITZ SCHROEDER, PRESIDENT & CEO

117 S. WEST END AVENUE

LANCASTER

PHONE: 717-392-7891

CLIMBERS RUN NATURE CENTER

226 FROGTOWN ROAD

PEQUEA, PA 17565

C O

U N

TY

PL

AN

D

AT

E:

P

R O

JE

C

T

PR

O

JE

C

T:

LA

N

C

AS

TE

R

D -3

.1

0-

C

LI

M

BE

R S

R U

N N

AT

U

R E

C

EN

TE

R

P O

N D

M

AI

N

TE

N

AN

C E

R

EV

IS

IO

N : 2

5-

-0

-0

6-

0' 200' 400' 600'

SCALE: 1" = 200'

717-627-4440 fax: 717-627-4660 landstudies.com land@landstudies.com

315 North Street | Lititz, PA 17543

P A

PENNSYLVANIA ONE CALL SYSTEM, INC.

CALL 3 BUSINESS DAYS BEFORE YOU DIG!

1-800-242-1776 OR 8-1-1

USGS 7.5 MINUTE SERIES -

CONESTOGA QUADRANGLE

Sheet Index Sheet

Number Sheet Title

1 COVER SHEET

2 EXISTING CONDITIONS AND DEMO PLAN

3 GRADING PLAN

4 E&S PLAN

5 SITE DETAILS

6 E&S DETAILS

7 E&S NOTES

POND MAINTENANCE

PROJECT AREA

PROJECT ADDRESS:

*REFER TO LANCASTER CIVIL PLANS

FOR ADDITIONAL SITE INFORMATION

BLUE TEXT WITH GREEN HIGHLIGHTS - MARKUPS BY LCEC

FOR SITE IMPROVEMENTS BIDDING (WETLAND BOARDWALK

AND POND DOCK ONLY, WITH ASSOCIATED E&S MEASURES)

BLUE TEXT - MARKUPS BY LCEC FOR POND MAINTENANCE

BIDDING (ALL WORK IN THESE PLANS EXCEPT THE

WETLAND BOARDWALK AND POND DOCK)

Date: 4/10/2026

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

EXISTING EDGE OF CHANNEL/POND

EXISTING OVERHEAD ELECTRIC

EXISTING PROPERTY BOUNDARY

SOILS

EXISTING TREE LINE

EXISTING WETLAND

EXISTING TREE

EXISTING TREE TO BE REMOVED (TBR)

LIMIT OF NPDES PERMIT (BY OTHERS)

LIMIT OF POND MAINTENANCE DISTURBANCE

100-YR FEMA FLOODPLAIN

FLOODWAY (50-FT OFFSET)

OE OE OE

LOD LOD

HaB

X

FP100 FP100

FW FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

N c

M bF

PeD

Nc

PeE

PeD

Pe D M bF

FP1

FP10

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP100

FP100

F

FP100

FP

FP

FP100

FP1

FP

FP10

FP100

FP10

0 FP100

FP100 FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP

FP

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP

LIMIT OF POND

MAINTENANCE

DISTURBANCE

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

LO

D

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LOD

LOD

LOD LOD LOD

LOD

LOD

LOD

LOD

EXISTING GRAVEL DRIVE

(CONTRACTOR SITE ACCESS)

FINAL CONDITION SHALL MATCH EXISTING

GRADES AND CONDITION OR BETTER. #57

STONE TOP DRESS ONLY, MUST STAY

WITHIN THE EXISTING STONE FOOTPRINT.

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

0' 30' 60' 90'

SCALE: 1" = 30'

E X

IS

TI

N G

C O

N D

IT

IO

N S

A N

D D

E M

O P

LA

N

D-384.10-24

EL

BE

2024-06-10

OF 7

1" = 30' x x x x x xx x x x x x x x x

(TBR)

(TBR)

(TBR)

(TBR)

(TBR

ABANDONED IN PLACE

REMOVE EX. PIPES WITHIN CLAY CORE TRENCH

SURVEY AND PLAN NOTES

1. THE PURPOSE OF THIS PLAN IS TO DREDGE THE EXISTING POND, REPAIR THE POND BERM AND OUTLET STRUCTURES AND INSTALL A TIMBER BOARDWALK AND TIMBER DOCK AT THE CLIMBERS RUN NATURE CENTER IN PEQUEA, PA.

2. LANDSTUDIES INC. ASSUMES NO LIABILITY FOR USE OR REUSE OF THESE PLANS BY ANY INDIVIDUAL OR ENTITY OTHER THAN

LANDSTUDIES' CLIENT.

3. REVISIONS MADE TO THIS PLAN SHALL NOT BE THE RESPONSIBILITY OF LANDSTUDIES INC. REVISIONS, SUBSTITUTION OF MATERIALS, OR OTHER CHANGES REQUIRES WRITTEN PERMISSION FROM LANDSTUDIES AND MAY BE SUBJECT TO GOVERNING BODY APPROVAL. SUCH APPROVAL OF REVISIONS OR FIELD CHANGES SHALL BE THE RESPONSIBILITY OF THE

CONTRACTOR.

4. EXISTING CONDITION SITE FEATURES, FIELD VERIFICATION, AND PROPERTY LINE SURVEY WAS COMPLETED ON JANUARY 31, 2024 BY:

a. C.S. DAVIDSON, INC

315 WEST JAMES STREET #102

LANCASTER, PA 17603

5. EXISTING BOUNDARY SURVEY WAS COMPLETED ON FEBRUARY 02, 2012 AND APRIL 5, 2024 BY:

a. LAKE ROEDER HILLARD & ASSOCIATES (2012 SURVEY)

3904 ABEL DRIVE

COLUMBIA, PA 17512

b. C.S. DAVIDSON, INC(2024 SURVEY)

315 WEST JAMES STREET #102

LANCASTER, PA 17603

6. USGS LiDAR WAS USED TO SUPPLEMENT AREAS OUTSIDE OF THE DETAILED SURVEY AREA.

7. HORIZONTAL DATUM BASED ON PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM (1983) NAD83, SOUTH ZONE, US SURVEY FEET.

8. VERTICAL DATUM BASED ON THE NORTH AMERICAN VERTICAL DATUM (1988) NAVD 88, SOUTH ZONE, ESTABLISHED BY GPS

LEICA MODEL NO. GS14.

9. PA SMARTNET USED FOR CORRECTIONS

10. BENCHMARK: PK NAIL SET IN THE SOUTH EDGE OF THE DRIVEWAY APPROXIMATELY 140 FEET EAST OF THE NORTHEAST

CORNER OF THE BARN. ELEVATION = 329.26

11. PREDOMINANT SOILS WITHIN THE PROJECT AREA ARE LISTED BELOW. SOILS INFORMATION WAS OBTAINED FROM THE USDA

NRCS'S WEB SOIL SURVEY. SOIL USE TYPE, LIMITATIONS, AND RESOLUTIONS CAN BE FOUND ON THE SOIL USE LIMITATIONS &

RESOLUTIONS TABLE ON SHEET 7.

a. MANOR VERY STONY SILT LOAM, 25 TO 60 PERCENT SLOPES (MbF)

b. NEWARK SILT LOAM (Nc)

c. PEQUEA SILT LOAM, 15 TO 25 PERCENT SLOPES(PeD)

d. PEQUEA SILT LOAM, 25 TO 50 PERCENT SLOPES (PeE)

12. PROJECT IS LOCATED IN THE OCTORARA FORMATION WHICH IS COMPOSED OF CARBONATE GEOLOGY AND CAN BE PRONE TO SINKHOLES AND OTHER CARBONATE GEOLOGY RISKS. THE LIMITED EARTHWORK NEEDED FOR POND MAINTENANCE AND TO STABILIZE THE STREAMBANK AND IMPROVE POND ACCESS IS NOT EXPECTED TO AFFECT OR INCREASE RISKS ASSOCIATED WITH KARST GEOLOGY. SHOULD A SINKHOLE DEVELOP IT WILL BE HANDLED PER GEOLOGIST

RECOMMENDATION.

13. THERMAL IMPACTS ARE AVOIDED BY MAINTAINING NATURAL SITE DRAINAGE. THE POND IS SPRING FED AND CURRENTLY DISCHARGES TO THE STREAM. DURING THE PROPOSED POND IMPROVEMENTS, POND WATER WILL CONTINUE TO DISCHARGE TO STREAM THROUGH PUMPING AND FILTERING AS SHOWN ON PAGE 47 OF THE REVISED PLAN SET. THE STREAM WILL ALSO USE A PUMP AROUND FOR THE INSTALLATION OF THE ROCK TOE PROTECTION, RIP RAP APRON, AND LOWER PORTION OF THE EMERGENCY SPILLWAY. THERE SHOULD NOT BE LONG OR SHORT TERM THERMAL IMPACTS FROM THE PROPOSED WORK.

14. NO UTILITIES ARE KNOWN TO EXIST WITHIN OR CLOSE PROXIMITY TO THE LIMITS OF EXCAVATION FOR THE WORK SHOWN ON

THE PLANS.

15. APPROXIMATE UTILITY AND EASEMENT INFORMATION HAS BEEN PROVIDED BY THE UTILITY OWNER THROUGH THE PA 1-CALL DESIGN PROTOCOLS. THIS SURVEY/BASEMAPPING HAS BEEN PROVIDED WITHOUT THE BENEFIT OF A PROPERTY TITLE SEARCH, AND THEREFORE DOES NOT GUARANTEE OR IMPLY THE PROPERTY IS NOT AFFECTED BY EASEMENTS, RIGHTS-OF-WAY OR OTHER RESTRICTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD LOCATE ALL UTILITIES AND COORDINATE APPROPRIATE RELOCATION EFFORTS WITH THE RESPECTIVE UTILITY COMPANIES.

16. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD LOCATE ALL UTILTIIES AND COORDINATE APPROPRIATE

RELOCATION EFFORTS WITH THE RESPECTIVE UTILITY COMPANIES.

17. FLUVIAL SYSTEMS ARE DYNAMIC AND CHANGE OVER TIME. THE EXISTING CONDITIONS TYPOGRAPHY REPRESENTS THE CONDITIONS AT THE TIME OF THE FIELD SURVEY. DESIGN MODIFICATIONS MAY BE NECESSARY TO ACCOMMODATE CHANGES IN THE SITE CONDITIONS AT THE TIME OF CONSTRUCTION. LANDSTUDIES SHALL BE CONSULTED TO VERIFY THE EXISTING SITE CONDITIONS AND IDENTIFY CONSTRUCTION MODIFICATIONS THAT MAY BE NECESSARY BASED ON THOSE CONDITIONS.

18. A WETLAND DELINEATION ON THE SITE, INCLUDING A FIELD INVESTIGATION ON NOVEMBER 4, 2020, FEBRUARY 21, 2023. THE RESULTS OF THE INVESTIGATION INDICATE THE PRESENCE OF ONE WETLAND. EXISTING WETLAND BOUNDARIES ARE SHOWN

ON THE PLANS AND BASED ON A FIELD SURVEY PERFORMED BY CS DAVIDSON.

PER THE REQUIREMENTS OF CHAPTER 102 OF THE ADMINISTRATIVE CODES OF TITLE 25 (PA DEP RULES AND REGULATIONS), A COPY OF THE PROJECT SITE'S EROSION AND SEDIMENT POLLUTION CONTROL PLAN AND ITS ACCOMPANYING NARRATIVE MUST BE AVAILABLE ON-SITE DURING CONSTRUCTION UNTIL THE SITE HAS BEEN PERMANENTLY STABILIZED AND FOLLOWING

VERIFICATION FROM THE APPLICABLE REGULATORY AUTHORITY.

19. THE PENNSYLVANIA NATURAL DIVERSITY INVENTORY (PNDI) SEARCH RECEIPT SHOWS THE LIMITS OF DISTURBANCE WITHIN THE VICINITY OF THE NORTHERN LONG-EARED BAT. NO CLEARING ACTIVITIES MAY TAKE PLACE WITHIN THE SEASON

RESTRICTION FROM MAY 15 - AUGUST 15.

C

LI

M B

E R

S R

U N

N A

TU

R

E C

E N

TE

R

P O

N D

M A

IN

TE

N A

N C

E

LA

N

C A

S

TE

R C

O N

S E

R V

A N

C Y

S . W

E S

T E

N D

A

VE

N U

E

LA

N C

A S

TE

R

ALL TREES ADJACENT TO THE WORK AREA

SHALL BE PROPERLY TRIMMED AS

NECESSARY BY A QUALIFIED PROFESSIONAL

TO ENSURE CONSTRUCTION VEHICLES DO

NOT DAMAGE, BREAK, OR SNAP LIMBS DURING

CONSTRUCTION. TREES REQUIRED TO BE

TRIMMED FOR ACCESS SHALL BE REVIEWED

WITH THE ENGINEER AND OWNER PRIOR TO

MOBILIZATION. ANY TREES OR TREE LIMBS

DAMAGED DURING CONSTRUCTION SHALL BE

PROPERLY PRUNED PER ANSI STANDARDS

WITHIN 24 HOURS OF DAMAGE. CRITICAL

ROOT ZONES SHALL BE REVIEWED WITH THE

OWNER PRIOR TO CONSTRUCTION.

PROTECTION OF EXPOSED ROOTS OF TREES

TO REMAIN SHALL BE REVIEWED WITH THE

OWNER TO PROVIDE PROTECTIONS.

REMOVE PLANK BRIDGE

FW

FW

FW

FW

FW

FW

FW

FW

FW FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

N c

M bF

PeD

Nc

PeE

PeD

Pe D M bF

FP1

FP10

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP

FP

FP100

FP1

FP

FP10

FP100

FP10

0 FP100

FP100 FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP

FP

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP1

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

TEMPORARY

STOCKPILE/DEWATERING

AREA

LIMIT OF POND

MAINTENANCE

DISTURBANCE

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

STAGING AREA

LO

D

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

FS

FS

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LOD

LOD

LOD LOD LOD

LOD

LOD

LOD

LOD

EXISTING PLANK WALKWAY, TO BE

REPLACED WITH NEW BOADWALK

(DESIGN BY OTHERS)

30 LF - 12" SLCPP @ 1.00%

FINISHED TOP OF

BERM WIDTH 8'

20 LF - 6" PVC @ 0.00%

POND EMBANKMENTD-1

INV. 287.00

TYPE D-W ENDWALLD-5

RIP-RAP APROND-7

39 LF

(GP-3) TOE ROCK PROTECTION

D-6

TG: 293.00

INV IN: 287.30 (DEWATERING DRAIN SLICE VALVE)

INV OUT: 287.30 (12" SLCPP)

2'X2' CATCH BASIND-3

109 LF

(GP-3) TOE ROCK PROTECTION

D-6

PROPOSED POND WSE 293.00

BOT. 285.00 (ASSUMED)

TOE ROCK TO TIE IN TO

EXISTING CROSS VANE

293292291290289

4:1 MAX SLOPE

ROCK UNDERLAYMENTD-8

EMERGENCY SPILLWAYD-2

750 SF MAX. - DESIGN BY OTHERS

(GP-2) TIMBER DOCK

D-9

(GP-7) TIMBER BOARDWALKD-10

MAINTAIN EX. EMBANKMENT

GRADES AND SLOPE

EXISTING GRAVEL DRIVE

(CONTRACTOR SITE ACCESS)

FINAL CONDITION SHALL MATCH EXISTING

GRADES AND CONDITION OR BETTER. #57

STONE TOP DRESS ONLY, MUST STAY

WITHIN THE EXISTING STONE FOOTPRINT.

10'

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

EXISTING EDGE OF CHANNEL/POND

EXISTING OVERHEAD ELECTRIC

EXISTING PROPERTY BOUNDARY

SOILS

EXISTING TREE LINE

EXISTING WETLAND

EXISTING TREE

EXISTING TREE TO BE REMOVED (TBR)

LIMIT OF NPDES PERMIT (BY OTHERS)

LIMIT OF POND MAINTENANCE DISTURBANCE

100-YR FEMA FLOODPLAIN

FLOODWAY (50-FT OFFSET)

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

PROPOSED FILTER SOCK

PROPOSED STORMWATER PIPE AND STRUCTURE

PROPOSED TOE ROCK PROTECTION

PROPOSED ROCK UNDERLAYMENT

PROPOSED CLAY CORE

TEMPORARY STOCKPILE/DEWATERING AREA

TEMPORARY PUMP-AROUND BYPASS/ DEWATERING

PUMP SYSTEM

OE OE OE

LOD LOD

FS FS FS

HaB

X

FP100 FP100

FW FW

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

0' 30' 60' 90'

SCALE: 1" = 30'

G R

A D

IN

G

P

LA

N

D-384.10-24

EL

BE

2024-06-10

OF 7

1" = 30'

ABANDONED IN PLACE

REMOVE EX. PIPES WITHIN CLAY CORE TRENCH

POND DREDGING NOT TO EXCEED ORIGINAL POND DEPTH OR

WIDTH. PROPOSED CONTOURS SHOWING AN ANTICIPATED

POND DEPTH OF 8' ARE FOR GUIDANCE ONLY.

C

LI

M B

E R

S R

U N

N A

TU

R

E C

E N

TE

R

P O

N D

M A

IN

TE

N A

N C

E

LA

N

C A

S

TE

R C

O N

S E

R V

A N

C Y

S . W

E S

T E

N D

A

VE

N U

E

LA

N C

A S

TE

R

SEE NOTE ON SHEET 2 REGARDING EXISTING

TREES TO REMAIN PROTECTIONS

100'

11'

Alternate Rock Construction Entrance

12" Compost Filter Sock

FW

FW

FW

FW

FW

FW

FW

FW FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

U E

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

N c

M bF

PeD

Nc

PeE

PeD

Pe D M bF

FP1

FP10

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP

FP

FP100

FP1

FP

FP10

FP100

FP10

0 FP100

FP100 FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP

FP

FP100

FP100

FP100

FP100

FP100

FP100

FP100

FP

FP100

FP100

FP100

FP1

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

FS

TEMPORARY

STOCKPILE/DEWATERING

AREA

LIMIT OF POND

MAINTENANCE

DISTURBANCE

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

STAGING AREA

LO

D

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

NPDES PERMIT LIMITS

(REFER TO LANCASTER

CIVIL PLANS)

FS

FS

LOD

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

LOD

LOD

LOD

LOD

LODLOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD LOD

LOD

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD LOD

LOD

LOD LOD LOD

LOD

LOD

LOD

LOD

PROPOSED POND WSE 293.00

BOT. 285.00 (ASSUMED)

293292291290289

EXISTING GRAVEL DRIVE

(CONTRACTOR SITE ACCESS)

FINAL CONDITION SHALL MATCH EXISTING

GRADES AND CONDITION OR BETTER. #57

STONE TOP DRESS ONLY, MUST STAY

WITHIN THE EXISTING STONE FOOTPRINT.

12"

FILTER SOCKE-4

32"

FILTER SOCKE-4

LEGEND

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

EXISTING EDGE OF CHANNEL/POND

EXISTING OVERHEAD ELECTRIC

EXISTING PROPERTY BOUNDARY

SOILS

EXISTING TREE LINE

EXISTING WETLAND

EXISTING TREE

EXISTING TREE TO BE REMOVED (TBR)

LIMIT OF NPDES PERMIT (BY OTHERS)

LIMIT OF POND MAINTENANCE DISTURBANCE

100-YR FEMA FLOODPLAIN

FLOODWAY (50-FT OFFSET)

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

PROPOSED FILTER SOCK

PROPOSED STORMWATER PIPE AND STRUCTURE

PROPOSED TOE ROCK PROTECTION

PROPOSED ROCK UNDERLAYMENT

PROPOSED CLAY CORE

TEMPORARY STOCKPILE/DEWATERING AREA

TEMPORARY PUMP-AROUND BYPASS/ DEWATERING

PUMP SYSTEM

SANDBAG DIVERSION DAM

OE OE OE

LOD LOD

FS FS FS

HaB

X

FP100 FP100

FW FW

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

0' 30' 60' 90'

SCALE: 1" = 30'

E

S P

LA

N

D-384.10-24

EL

BE

2024-06-10

OF 7

1" = 30'

C

LI

M B

E R

S R

U N

N A

TU

R

E C

E N

TE

R

P O

N D

M A

IN

TE

N A

N C

E

LA

N

C A

S

TE

R C

O N

S E

R V

A N

C Y

S . W

E S

T E

N D

A

VE

N U

E

LA

N C

A S

TE

R

ALL DISTUBED AREAS SHALL BE SEEDED AND STABILIZED IN

ACCORDANCE WITH THE PLANS. SEE NOTES ON SHEET 7

CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING

GRAVEL DRIVE THROUGHOUT CONSTRUCTION. FINAL

CONDITION SHALL MATCH EXISTING GRADES AND CONDITION

OR BETTER. #57 STONE TOP DRESS ONLY, MUST STAY WITHIN

THE EXISTING STONE FOOTPRINT.

PUMPED WATER FILTER BAGE-5

SUMP PITE-6

TEMPORARY PUMP AROUND BYPASS SYSTEME-3

SANDBAG DIVERSION DAME-2

DETWATERING PUMP SYSTEM #1

TIMBER MAT WETLAND CROSSINGE-7

SANDBAG DIVERSION DAME-2

SEE NOTE ON SHEET 2 REGARDING EXISTING

TREES TO REMAIN PROTECTIONS

100'

11'

Alternate Rock Construction Entrance

12" Compost Filter Sock

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

S

IT

E D

E

TA

IL

S

D-384.10-24

EL

BE

2024-06-10

OF 7

N/A

3 MAX

EXISTING STREAM BED

BOTTOM OF POND

TOP OF EMBANKMENT

ELEVATION 294.50 (MIN.)

NOTES

1. EMBANKMENT FILL MATERIAL TO BE COMPACTED IN 6" LAYERS TO FINAL DENSITY OF NOT LESS THAN 95% OF MATERIAL DRY WEIGHT AT OPTIMUM

MOISTURE CONTENT

RECONSTRUCTED BERM AS NECESSARY

TOP OF EMBANKMENT

8' MIN.

2' MIN.

2' MIN.

NOT TO SCALE

POND EMBANKMENTD-1

MIN. 6" TOPSOIL

IMPERVIOUS CLAY CORE - CORE

MATERIAL SHALL BE UNIFIED

CLASS CL, COMPACTED TO NOT

LESS THAN 95% STD PROCTOR

DENSITY

MIN. 4'x4' HDPE ANTI-SEEP COLLAR

OR APPROVED EQUAL.

INSTALL PER MANUFACTURER

SPECIFICATIONS

2'X2' CATCH BASIN

WITH TRASH RACK

GRATE (SEE DETAIL)

INV. IN/OUT:

287.30

30 LF 12" SLCPP @ 1.00%

BOTTOM OF CLAY

CORE MIN. 1' BELOW

POND BOTTOM

L

SECTION A-A FRONT ELEVATION

2:1 MAX

PLAN VIEW

A

A

A

12" MIN. 9"

W

30° 30°

6" A

6"

6" A

6"

D

PIPE

DIA. (D)

L

W L A

<18 4.0 4.0 12

24 4.3 4.25

36 5.8 4.6

42 6.3 5.8

48 6.9 6.9

54 7.5 8.0

60 8.1 9.2 15

72 9.2 11.5 15

(IN) (FT) (FT) (IN)

NOTES

1. USE CLASS A CONCRETE OR BETTER

2. CHAMFER EXPOSED EDGES AT ONE INCH (1")

3. ALL STORM DRAIN CONNECTIONS TO

STRUCTURE SHALL BE WATERTIGHT.

TYPE D-W ENDWALLD-5

NOT TO SCALE

2'X2' CATCH BASIND-3

5:1 M

AX

5:1 MAX

UNDISTURBED SUBGRADE

4"

6"

MIN

.6" MIN.

+293.50 293.50+

+294.50294.50+ 15'

NAG C125BN

OR APPROVED EQUAL

12" MIN.

6" M

IN

12" MIN.

6" M

IN

6" MIN. NATIVE TOPSOIL

SEED MIX

SEE NOTES SHEET 7

NOT TO SCALE

POND SPILLWAYD-2

WALL THICKNESS

5" (TYP.)

SECTION

12" SLCPP

OUTLET PIPE

2'-0"

INLET BOX NOTES:

1. OVERALL BOX DIMENSIONS ARE 34" X 34" X 8.5'

2. BOX SHALL BE SET LEVEL AND PLUMB IN ALL DIRECTIONS.

3. BASE THICKNESS INCREASED FROM STANDARD TO ACCOUNT FOR STRUCTURE BUOYANCY.

4. INLET SHALL BE TOPPED WITH TRASH RACK GRATE PER DETAIL.

5. 6" DIA. OPENING WITH INTERNAL SLIDE GATE VALVE SHALL BE INCLUDED ON THE FACE OPPOSITE

THE OUTLET PIPE TO ACCOMMODATE DEWATERING. INVERT SHALL MATCH THE OUTLET PIPE.

6. FINAL INLET ELEVATION SHALL BE SET TO MEET DESIGN ELEVATIONS.

7. CATCH BASIN SHALL BE SET ON 1' DEPTH OF COMPACTED 2A MODIFIED STONE EXTNDING MIN. 6"

ON ALL SIDES OF THE BOX.

2'-0" G

R O

U

T TO

PIPE IN

V.

6" 6'-0"

NOT TO SCALE

TRASH RACK GRATED-4

INSTALL TRASH RACK GRATE PER

DETAIL.

20 LF 6" SCH-40 PVC @ 0.00%

PROPOSED POND

WATER SURFACE

ELEVATION 293.00

TOP OF CLAY CORE SHALL BE 9" ABOVE WSE

EXCEPT THROUGH SPILLWAY. CLAY CORE SHALL

BE 2" ABOVE WSE THROUGH SPILLWAY ONLY.

INV. 287.00

INLET BOX NOTES:

1. MATERIAL: STAINLESS STEEL OR APPROVED EQUAL.

2. INSTALLED INTO TOP OF CATCH BASIN USING 4 - STAINLESS STEEL

MOUNTING BOLTS

3. GRATE SHALL BE LEVEL AND PLUMB AND SET AT ELEVATION SUCH

THAT THE PROPOSED WATER SURFACE ELEVATION MEETS THE

PLANS.

4. ALTERNATIVE SELF CLEANING TRASH RACK GRATES MAY BE

APPROVED BY THE PLAN PREPARER.

6" GATE VALVE OR APPROVED EQUAL

INSTALLED WITHIN INLET BOX FOR

FUTURE DEWATERING OF POND FOR

MAINTENANCE.

SUBGRADE

LIMIT OF

SPILLWAY

GRADING

RIPRAP CHOKED IN

WITH AVAILABLE SOIL

PROPOSED

SPILLWAY SURFACE

LIMIT OF SPILLWAY GRADING

(VARIES)

SPILLWAY SLOPE

4:1 MAX

PLAN VIEW

FLOW

AA AA'

PROFILE VIEWFLOW

RIPRAP CHOKED IN WITH

GRAVEL, SAND, AND SILT

RIPRAP CHOKED IN WITH AVAILABLE SOIL

SEE SCHEDULE FOR RIPRAP

PLACEMENT DEPTH

ROCK UNDERLAYMENT SCHEDULE

RU-1

NO. RIPRAP SIZE PLACEMENT DEPTH

CROSS SECTION VIEW AA-AA'

ROCK UNDERLAYMENT TO

EXTEND UP SIDE SLOPES TO

EXTENT SHOWN ON PLANS

NOT TO SCALE

ROCK UNDERLAYMENTD-8

R-4*

NOTE:

1. CHOKE RIPRAP WITH A MIXTURE OF 65% ROCK AND 35% AVAILABLE SOIL, BY VOLUME. CHOKED MATERIAL SHALL USE

ON SITE SOIL THAT IS SUITABLE GROWING MEDIA. MIX MATERIALS PRIOR TO PLACEMENT. CONTRACTOR SHALL USE

ANY MEANS NECESSARY TO ENSURE GAPS BETWEEN ROCK ARE FILLED WITH AVAILABLE SOIL.

2. INSTALL 2-4" OF TOPSOIL TO GRADES SHOWN ON THE PLAN.

3. ALL PROPOSED ROCK UNDERLAYMENT SHALL BE INSTALLED UNDER THE DIRECT SUPERVISION OF AND/OR SUBJECT

TO THE APPROVAL OF THE ENGINEER. IF INSTALLATION AND PERFORMANCE ARE NOT IN ACCORDANCE WITH THE DETAILS AND SPECIFICATIONS, THE STRUCTURE SHALL BE RE-SET OR REINSTALLED IN ACCORDANCE WITH THE

DESIGN DETAILS AND SPECIFICATIONS.

4. SEED AND INSTALL EROSION CONTROL BLANK AS SPECIFIED

UNDISTURBED

EARTH

18"

ROCK UNDERLAYMENT TO

EXTEND UP SIDE SLOPES TO

EXTENT SHOWN ON PLANS

PLACEMENT DEPTH SHALL BE

PERPENDICULAR TO FINISH GRADE

FILTER STONE OR

GEOTEXTILE UNDERLAYMENT

NOT TO SCALE

RIP-RAP APROND-7

NOTES

1. ALL APRONS SHALL BE CONSTRUCTED TO THE DIMENSIONS SHOWN. TERMINAL WIDTHS SHALL BE ADJUSTED

AS NECESSARY TO MATCH RECEIVING CHANNELS.

2. ALL APRONS SHALL BE INSPECTED AT LEAST WEEKLY AND AFTER EACH RUNOFF EVENT. DISPLACED RIPRAP

WITHIN THE APRON SHALL BE REPLACED IMMEDIATELY.

<0% SLOPE>

PLAN VIEW

SECTION Y-Y

SECTION Z-Z

AL

AI

At w

Pd

R t

Y Y

Z Z

GEOTEXTILE

PdAi w

0% SLOPE

CLASS 4, TYPE A GEOTEXTILE

OUTLET

NO.

PIPE

DIA

Pd

(IN)

TAIL

WATER

COND.

(MAX

OR MIN)

PIPE

SLOPE

(FT/FT)

PIPE

MANNINGS

n

Q (CFS) V (FPS)

RIPRAP APRON

SIZE

R-_

THICK.

Rt

(IN)

LENGTH

Al

(FT)

INITIAL

WIDTH

Aiw

(FT)

TERMINAL

WIDTH

Atw

(FT)

C

LI

M B

E R

S R

U N

N A

TU

R

E C

E N

TE

R

P O

N D

M A

IN

TE

N A

N C

E

LA

N

C A

S

TE

R C

O N

S E

R V

A N

C Y

S . W

E S

T E

N D

A

VE

N U

E

LA

N C

A S

TE

R

NOTES:

1. TOE ROCK SHALL HAVE AN AVERAGE DIMENSION OF 2.0'X2.0'X3.0'.

2. IF LEVEL BED CANNOT BE ESTABLISHED ON EXISTING MATERIAL, PROVIDE ADDITIONAL BOULDERS IN THE

CHANNEL AS SHOWN AND PROVIDE #57 STONE TO PROVIDE LEVEL BED FOR THE TOE ROCKS

3. SELECTION AND PLACEMENT OF ROCK SHALL BE UNDER THE SUPERVISION OF THE DESIGN ENGINEER.

4. ADDITIONAL LAYERS OF ROCK MAY BE REQUIRED TO MEET GRADED BANK SLOPE ELEVATIONS. ROCK SHALL NOT

EXCEED 4' ABOVE WATER SURFACE.

5. BANK PROTECTION INSTALLATION SHALL BE CONDUCTED DURING LOW FLOW.

TOE ROCK SHALL BE

SET AT EDGE OF

EXISTING STREAM

GRADED BANK

ROLANKA BIOD-MAT 90

(OR APPROVED EQUIVALENT)

MATTING TO BE PLACED ON BACKSIDE OF

BERM IN ALL AREAS INCLUDING TOE ROCK

PROTECTION AREA, SPILLWAY AND ANY

OTHER DISTURBED AREAS

KEY IN MATTING

12" MIN

PREPARE LEVEL BED IN

NATIVE MATERIAL MIN. 1'

BELOW STREAM BED

EXTEND MATTING MIN

8" BEHIND ROCK

NOT TO SCALE

TOE ROCK PROTECTIOND-6

NORMAL WATER

SURFACE

ELEVATION

INSTALL CLASS 4, TYPE A

GEOTEXTILE BEHIND THE BOULDER

AND #1 STONE BACKFILL

TOP OF CLAY CORE

293.75

TOP OF CLAY CORE

293.17

CLAY CORE TO DEPTH

AS SHOWN IN D-1

MAINTENANCE DRAIN PIPE

SHALL BE SUPPORTED AS

NECESSARY TO ENSURE

JOINTS AT STRUCTURE

REMAIN WATER TIGHT

RIP-RAP APRON AS DETAILED

PAVING

TOP SOIL

PROPOSED PIPE

M

IN

IM

U

M C

O

VE

R

AASHTO NO. 57

CRUSHED STONE

PIPE BEDDING &

INITIAL BACKFILL

6"

MIN

TRENCH WIDTH

6" M

IN

LAWN AREAS PAVING AREAS

6"

MIN

M

IN

M

IN

PIPE TRENCHD-11

TOP WITH 2-4" OF

TOPSOIL

TOP WITH 2-4" OF

TOPSOIL

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

E

S D

E

TA

IL

S

D-384.10-24

EL

BE

2024-06-10

OF 7

N/A

NOTES:

1. SEE PLANS AND NOTES ON SHEET 7 FOR TYPE AND LOCATION OF EROSION CONTROL BLANKET.

2. SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN DRAWINGS PRIOR TO INSTALLING

THE BLANKET.

3. PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE.

4. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.

5. BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET

LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET.

6. THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.

7. BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL PERENNIAL VEGETATION IS

ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED

BLANKETS SHALL BE RESTORED OR REPLACED WITHIN 4 CALENDAR DAYS.

BLANKET EDGES

OVERLAPPED 6" (MIN.)

AND STAPLED.

INSTALL BEGINNING OF ROLL IN

12 IN. x 12 IN. ANCHOR TRENCH, STAPLE, BACKFILL AND

COMPACT SOIL

STARTING AT TOP OF SLOPE,

ROLL BLANKETS IN

DIRECTION OF WATER FLOW

REFER TO MANUFACTURER'S

RECOMMENDED STAPLING PATTERN

FOR STEEPNESS AND LENGTH OF

SLOPE BEING BLANKETED

PREPARE SEED BED

(INCLUDING APPLICATIONI OF

LIME, FERTILIZER AND SEED)

PRIOR TO BLANKET INSTALLATION

OVERLAP BLANKET ENDS 6 IN. MIN.

WITH THE UPSLOPE BLANKET

OVERLYING THE DOWNSLOPE BLANKET

(SHINGLE STYLE) STAPLE SECURELY

THE BLANKET SHOULD

NOT BE STRETCHED; IT

MUST MAINTAIN GOOD

SOIL CONTACT

NOT TO SCALE

EROSION CONTROL BLANKET INSTALLATIONE-1

2 BAG MIN. HEIGHT ABOVE NORMAL BASE FLOW

NORMAL STREAM FLOW

STACKED SANDBAGS OPTION

JERSEY BARRIER OPTION

WORK AREA

SANDBAG TO

HOLD IMPERVIOUS

LINER IN PLACE

IMPERVIOUS LINER

EXTENDED TO

STREAM BOTTOM

AND SECURED

WITH SANDBAGS

JERSEY

BARRIER

SANDBAG (TYP.)

OPTIONAL SANDBAG PLATFORM

IMPERVIOUS

MEMBRANE SANDBAGS

NOT TO SCALE

SANDBAG DIVERSION DAM

OR COFFERDAM (STD DTL #3-15)

E-2

FILTER BAG

WELL VEGETATED, GRASSY AREA

WELL VEGETATED, GRASSY AREA

FILTER BAG

PLAN VIEW

ELEVATION VIEW

NOTES:

LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE

FOLLOWING STANDARDS:

1. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.

2. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.

3. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY

RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.

4. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.

5. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE

MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.

6. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE

IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.

PROPERTY

AVG.WIDE WIDTH STRENGTH

GRAB TENSILE

PUNCTURE

MULLEN BURST

UV RESISTANCE

AOS % RETAINED

TEST METHOD

ASTM D-4884

ASTM D-4632

ASTM D-4833

ASTM D-3786

ASTM D-4355

ASTM D-4751

MINIMUM STANDARD

60 LB/IN

205 LB

110 LB

350 PSI

70%

80 SIEVE

INTAKE HOSE

PUMP

CLAMPS

HEAVY DUTY

LIFTING STRAPS

(RECOMMENDED)

DISCHARGE

HOSE

DISCHARGE

HOSE

CLAMPS

INTAKE

HOSE

PUMP

NOT TO SCALE

PUMPED WATER FILTER BAG (STD DTL #3-16)

E-5

FL

OW FLO

W

DISTURBED AREA

UNDISTURBED AREA

SECTION

DISTURBED AREA

UNDISTURBED AREA

NOTES:

1. SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL

MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.

2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS

TRIBUTARY AREA.

3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.

4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER

AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.

5. COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.

6. BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S RECOMMENDATIONS.

7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD

AS A SOIL SUPPLEMENT.

IN

M

IN

2" x 2" WOODEN STAKES

PLACED 10' ON CENTER

COMPOST FILTER SOCK

BLOWN/PLACED

FILTER MEDIA

EXISTING

CONTOURS

2" x 2" WOODEN

STAKES PLACED

10' ON CENTER

COMPOST

FILTER SOCK

PLAN

NOT TO SCALE

COMPOST FILTER SOCK (STD DTL 4-1)

E-4

NOTES:

PUMP INTAKE SHALL BE MAINTAINED A SUFFICIENT DISTANCE FROM BOTTOM TO PREVENT

SEDIMENT FROM ENTERING THE SYSTEM. DO NOT EXCAVATE A SUMP AREA WITHIN THE

STREAM CHANNEL FOR THE PUMP INTAKE.

PUMPED WATER MUST BE DISCHARGED ONTO AN ENERGY DISSIPATING DEVICE SUCH AS

PLYWOOD, PLASTIC, ROCK, STANDING WATER POOL, FOUNTAIN OR OTHER DEVICE TO

MINIMIZE THE OPPORTUNITY FOR EROSION OR INCREASING TURBIDITY.

PUMP AROUND BYPASS SHOULD ONLY BE IMPLEMENTED IF THE PUMP CAPACITY CAN

EFFECTIVELY MANAGE THE EXISTING BASEFLOW DISCHARGE.

LOCALIZED PUMPS SHALL BE USED TO DEWATER THE IMMEDIATE WORK AREA.

SEDIMENT-LADEN WATER SHALL BE DISCHARGED THROUGH A PUMPED WATER FILTER

BAG IN ACCORDANCE WITH DETAIL.

FOR SPLASH PROTECTION, DISCHARGE OUTLET MAY BE SET UPON PLASTIC SHEETING

AND ORIENTED UPWARD TO CREATE FOUNTAIN-EFFECT, WHICH FALLS ON PLASTIC

SHEETING BEFORE ENTERING STREAM DOWNSTREAM OF PROJECT SITE. ALTERNATIVE

SPLASH PROTECTION SHALL BE APPROVED BY DESIGN ENGINEER.

CONSTRUCTION

AREA

UPSTREAM TEMPORARY

DIVERSION DAM

INTAKE PIPE

WITH SCREEN

BYPASS PUMP OR MULTIPLE PUMPS

IN UNISON TO SUFFICIENTLY CONVEY

LOW FLOW CONDITION BASEFLOW

DISCHARGE

PIPE

SPLASH PROTECTION AT

DISCHARGE (SEE NOTES)

DOWNSTREAM TEMPORARY

DIVERSION DAM

(IF NECESSARY)

LOCALIZED

DEWATERING

PUMP-AROUND

(SEE NOTES)

DISCHARGE

DEWATERING PUMP TO

FILTER BAG PER DETAIL

NOT TO SCALE

TEMPORARY PUMP AROUND BYPASS SYSTEME-3

NOT TO SCALE

(GP-2) TIMBER DOCK

D-9

NOT TO SCALE

(GP-7) TIMBER BOARDWALK

D-10

12" MIN.

PROPOSED 10' WIDE

TIMBER DOCK

10' OC MIN.

TIMBER STRINGER TIMBER DECK TYP.

(2) TIMBER HEADER

(ONE EA. SIDE)

TIMBER PILE

NOTE:

1. PILES ARE TO BE INSTALLED TO SPECIFIED CAPACITY DEPTH OR REFUSAL.

2. PILING SPACING WILL BE SPACED AT INTERVALS OF 10' OR MORE.

3. FINAL MATERIALS AND STRUCTURAL DESIGN PER BRIDGE CONTRACTOR.

4. TIMBER DOCK SHALL NOT EXCEED 750 SF MAX.

POND WSE

POND WSE

TIMBER DOCK

AND HANDRAIL BY

OTHERS

POND BOTTOM

POND BOTTOM

TIMBER STRINGER TIMBER DECK TYP.

(2) TIMBER HEADER

(ONE EA. SIDE)

TIMBER PILE

NOTE:

1. PILES ARE TO BE INSTALLED TO SPECIFIED CAPACITY DEPTH OR REFUSAL.

2. PILING SPACING WILL BE SPACED AT INTERVALS OF 10' OR MORE.

3. FINAL BOARDWALK MATERIALS AND STRUCTURAL DESIGN PER BRIDGE CONTRACTOR.

4. MAXIMUM PERMANENT WETLAND IMPACT 502 SF (54X8'). MAXIMUM TEMPORARY

WETLAND IMPACTS 520 SF. TEMPORARY WETLAND IMPACTS SHALL BE RESTORED TO

ORIGINAL CONDITIONS FOLLOWING BOARDWALK COMPLETION.

DELINEATED WETLAND

12" MIN. ACROSS

DELINEATED WETLAND

PROPOSED 8' WIDE

BOARDWALK WETLAND

CROSSING

10' OC MIN.

42" HEIGHT HANDRAIL (TYP.)

30" MAX. BOARDWALK

HEIGHT

C

LI

M B

E R

S R

U N

N A

TU

R

E C

E N

TE

R

P O

N D

M A

IN

TE

N A

N C

E

LA

N

C A

S

TE

R C

O N

S E

R V

A N

C Y

S . W

E S

T E

N D

A

VE

N U

E

LA

N C

A S

TE

R

12 IN.

12 IN.

NOTES:

LOCATE SUMP AT LOW POINT IN WORK AREA AND OUTSIDE OF CONSTRUCTION ACTIVITY. WHEREVER RUNOFF FROM A WORK AREA FLOWS DIRECTLY TO THE SUMP AREA, A FILTER BAG SHALL BE ATTACHED AT THE

DISCHARGE POINT UNLESS PUMPING TO A SEDIMENT BASIN OR SEDIMENT TRAP.

MINIMUM DIAMETER OF PIT BOTTOM SHALL BE 24" LARGER THAN PIPE DIAMETER. MINIMUM DEPTH OF PIT SHALL BE 24" BELOW WATER LEVEL IN WORK AREA (INCLUDING THE AASHTO #57 STONE). 12" TO 24" PERFORATED CMP

OR PVC PIPE SHALL BE SET ON 12" OF CLEAN AASHTO # 57 STONE.

VOID SPACE AROUND PIPE SHALL BE FILLED WITH AASHTO # 57 STONE. PIPE TO EXTEND 12" MIN. ABOVE TOP OF

STONE AND/OR WATER BEING PUMPED FROM WORK AREA.

SET PUMP INTAKE INSIDE STANDPIPE.

DISCHARGE FROM PUMP SHALL BE TO A STABLE AREA BELOW DISTURBANCES FROM THE WORK ZONE.

SUMP MAY BE USED IN CONJUNCTION WITH FILTER BAG WHERE ADDITIONAL FILTERING IS NEEDED.

SECTION VIEW

SIDE SLOPE OPTIONAL

AASHTO NO. 57 STONE

12 IN. TO 24 IN. PERFORATED

CMP OR PVC PIPE

PUMP

PUMP INTAKE HOSE

NOT TO SCALE

SUMP PIT (STD DTL #3-17)

E-6

NOT TO SCALE

TIMBER MAT WETLAND CROSSINGE-7

NOTES:

A GEOTEXTILE UNDERLAYMENT SHALL BE USED UNDER THE WOOD MAT.

FOLLOWING THE COMPLETION OF BOARDWALK AND DOCK COMPLETELY REMOVING CROSSING, RESTORE

TO ORIGINAL CONDITIONS AND STABILIZE AS DESCRIBED ON SHEET 7.

PLAN VIEW

TIMBER MAT

EXISTING WETLAND

UNDISTURBED EARTH

Note: See Structural Plans for additional information.

Note: See Structural Plans for additional information.

structural plans.

structural plans.

STANDARD E&S PLAN NOTES

1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE DEP APPROVED DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO THE IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.

2. AT LEAST 10 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE ENGINEER, PA DEP CENTRAL OFFICE, PA FISH AND BOAT COMMISSION, A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT, AND THE US ARMY CORPS OF

ENGINEERS TO AN ON-SITE PRECONSTRUCTION MEETING.

3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.

4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS. ANY DEVIATION TO THE SEQUENCE ASSOCIATED WITH THE RESTORATION SHALL BE APPROVED IN WRITING FROM THE LOCAL CONSERVATION

DISTRICT.

5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER

OBJECTIONABLE MATERIAL.

6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS

DESCRIBED IN THIS E&S PLAN.

7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.

8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION.

EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35

FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.

9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE CENTRAL OFFICE OF THE DEPARTMENT.

10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.

11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE

DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.

12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE BUT QUALIFYING AS

CLEAN FILL DUE TO ANALYTICAL TESTING.

13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER

UNDISTURBED VEGETATED AREAS.

14. VEHICLES AND EQUIPMENT MAY ONLY ENTER THE RESTORATION SITE VIA THE LOCATION SHOWN ON THE NPDES PERMIT PLANS PREPARED BY LANCASTER CIVIL. ACCESS TO THE POND MAINTENANCE AREA SHALL BE FROM THE EXISTING GRAVEL DRIVE SHOWN ON THE PLANS

ONLY.

15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF

THOSE INSTALLED WILL BE REQUIRED.

16. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.

17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT

INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.

18. ALL SEDIMENT REMOVED FROM THE RESTORATION SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.

19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING

AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.

20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH

LOCAL REQUIREMENTS OR CODES.

21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.

22. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT

WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.

23. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.

24. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.

25. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE MANAGED IN A MANNER IN ACCORDANC WITH THESE PLANS TO

FACILITATE CONSTRUCTION EFFORTS.

26. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF SURFACE WATER, OR AS OTHERWISE SHOWN ON

THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.

27. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN

ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.

28. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF

RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.

29. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.

30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH

REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.

31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION.

32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW.

THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.

CONSTRUCTION SEQUENCE

ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE UNLESS OTHERWISE APPROVED BY THE ENGINEER. EACH STEP OF THE SEQUENCE SHALL BE COMPLETED BEFORE PROCEEDING TO THE NEXT STEP, EXCEPT WHERE NOTED. POND SEDIMENT REMOVAL MUST BE COMPLETED DURING DEWATERED CONDITIONS.

1. THE PENNSYLVANIA NATURAL DIVERSITY INVENTORY (PNDI) SEARCH RECEIPT SHOWS THE LIMITS OF DISTURBANCE WITHIN THE VICINITY OF THE NORTHERN LONG-EARED BAT. NO CLEARING ACTIVITIES MAY TAKE PLACE WITHIN THE SEASON RESTRICTION

FROM MAY 15 - AUGUST 15.

2. DUE TO KNOWN REPRODUCING WILD TROUT IN CLIMBERS RUN, NO IN-STREAM CONSTRUCTION ACTIVITIES MAY TAKE PLACE

WITHIN THE SEASON RESTRICTION FROM OCTOBER 1 - DECEMBER 31.

3. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND GRUBBING) THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE REGULATORY OFFICIALS, AND THE PLAN

PREPARER TO AN ON-SITE PRE-CONSTRUCTION MEETING.

4. UPON INSTALLATION OR STABILIZATION OF ALL PERIMETER SEDIMENT CONTROL BMPS AND AT LEAST 3 DAYS PRIOR TO PROCEEDING WITH THE BULK EARTH DISTURBANCE ACTIVITIES, THE OWNER SHALL PROVIDE NOTIFICATION TO ANY RELEVANT

REGULATORY OFFICIALS.

5. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING

UNDERGROUND UTILITIES.

6. FIELD MARK AND CLEARLY IDENTIFY LIMIT OF DISTURBANCE, UTILITIES, AREAS TO BE PROTECTED, AND ENVIRONMENTALLY SENSITIVE AREAS. REVIEW CONSTRUCTION ACCESS AND COORDINATE TREE PROTECTIONS AND/OR PRUNING WITH THE ENGINEER

AND OWNER PRIOR TO MOBILIZATION.

7. INSTALL ALL E&S CONTROLS AS SHOWN PLAN AND IN ACCORDANCE WITH THE ASSOCIATED SITE NPDES PERMIT (REFER TO

LANCASTER CIVIL PLANS).

8. BEGIN DEWATERING OF THE POND. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND INSTALL PROVISIONS TO PROTECT A PORTION OF THE POND FOR AQUATIC ORGANISM HABITAT DURING POND MAINTENANCE ACTIVITIES. INSTALL DEWATERING PUMP SYSTEM #1 IN THE DEEPEST PART OF THE POND. AS THE POND IS BEING DEWATERED ANY FISHES/AQUATIC ANIMALS SHALL BE CAPTURED UTILIZING A SEINE NET OR OTHER NET, PLACED IN 5 GALLON BUCKETS AND RELOCATED.

9. CLEAR AND GRUB IN LOCATIONS OF IMPROVEMENTS AS SHOWN ON THE PLANS, REMOVE ALL TREES LOCATED ON THE BERM, AND

INSTALL SPRING FLOW DIVERSIONS AS NECESSARY TO ENSURE DEWATERING.

10. WHEN ALL E&S CONTROLS, FLOW DIVERSIONS, AND DEWATERING PUMPS ARE INSTALLED AND FUNCTIONING PROPERLY AND THE POND HAS BEEN SUFFICIENTLY DEWATERED AND ALLOWED ADEQUATE TIME FOR THE POND SEDIMENTS TO DRY, THE CONTRACTOR MAY COMMENCE POND EXCAVATION AND SEDIMENT REMOVAL. EXCAVATED POND SEDIMENT MATERIAL SHALL BE HAULED OFF SITE AND PROPERLY DISPOSED OF AT THE CONTRACTORS EXPENSE. THE CONTRACTOR MAY USE DESIGNATED SOIL DEWATERING AREA SHOWN ON THE PLANS AS NECESSARY TO DRY DREDGED PRIOR TO HAULING MATERIALS OFF SITE IN

ACCORDANCE WITH CHAPTER 102 REGULATIONS AND PERMIT REQUIREMENTS.

11. REMOVE EXISTING BOARDWALK CROSSING.

12. EXCAVATION POND MAINTENANCE DREDGING SHALL BEGIN IN THE POND. DREDGING SHALL NOT EXCEED ORIGINAL POND DESIGN

DEPTHS AND WIDTHS. FLOW DIVERSIONS TO BE RELOCATED AS NEEDED TO PERFORM SLOPE GRADING AS NECESSARY.

13. INSTALL NEW BOARDWALK AND DOCK. SEE DETAIL E-7 TEMPORARY WETLAND CROSSING FOR EQUIPMENT ACCESS WITHIN

WETLAND 1 DURING INSTALLATION. TEMPORARY WETLAND IMPACTS IMMEDIATELY ADJACENT TO THE PROPOSED BOARDWALK SHALL BE RETURNED TO THEIR ORIGINAL ELEVATION AND SEEDED WITH THE WETLAND SEED MIX. NO FILL MATERIAL SHOULD BE

DISPOSED OF IN THE WETLAND.

14. INSTALL PUMP-AROUND BYPASS SYSTEM FOR TOE ROCK PROTECTION WORK.

15. INSTALL TOE ROCK PROTECTION, RIPRAP APRON, AND POND EMERGENCY SPILLWAY ONLY AFTER PUMP AROUND BYPASS SYSTEM

#2 HAS ADEQUATELY REMOVED ACTIVE FLOW.

16. BEGIN INSTALLATION OF CLAY CORE. CUT AND REMOVE EXISTING STORMWATER PIPES WITHIN THE CLAY CORE TRENCH TO BE

ABANDON IN PLACE.

17. INSTALL NEW OUTLET STRUCTURE AND SPILLWAY.

18. ALL DISTURBED AREAS OUTSIDE THE POND WATER SURFACE LIMITS SHALL BE SEEDED AND STABILIZED (SEE PLAN NOTES FOR

SEED MIX AND RATE). A PROTECTIVE BLANKET SHOULD BE USED TO STABILIZE ALL SEEDED AREAS ADJACENT TO OR WITHIN 50 FEET OF STREAM, PONDS, OR WETLANDS. EROSION CONTROL BLANKET SHALL BE INSTALLED AS DETAILED AND SPECIFIED.

19. UPON COMPLETION OF STABILIZATION ACTIVITIES, THE FLOW DIVERSIONS, DEWATERING PUMPS AND E&S CONTROLS MAY BE

REMOVED AND THE POND ALLOWED TO REFILL

SCALE:

DATE:

CHECKED BY:

DRAWN BY:

PROJECT NUMBER:

SHEET NUMBER:

REVISIONS

NO. DATE DESCRIPTION

P R

O

JE

C T:

S H

E E

T

TI

TL

E

SIGNATURE BLOCK

1 2025-10-01 LS COMMENTS

P R

O

JE

C T

N O

TE

S

D-384.10-24

EL

BE

2024-06-10

OF 7

N/A

TEMPORARY CONTROL MEASURES

1. FILTER SOCK

1.1. FILTER SOCK SHALL BE LOCATED AS SHOWN ON THE PLANS AND DOWN SLOPE OF ANY SPOIL AREAS OR DISTURBED AREAS

WITH THE POTENTIAL TO RESULT IN SEDIMENT-LADEN RUNOFF LEAVING THE SITE.

2. TEMPORARY SEEDING

2.1. TEMPORARY SEEDING SHALL BE APPLIED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SEED MIX AS NOTED ON

THE DRAWINGS OR AS OTHERWISE NECESSARY TO TEMPORARILY STABILIZE DISTURBED AREAS AS APPROVED BY THE PLAN

PREPARER.

3. TEMPORARY STABILIZATION MATTING

3.1. MATTING SHALL BE APPLIED TO THE ENTIRETY OF BERM AND BERM SLOPES AND SPILLWAY AS DEFINED ON THE PLAN.

MATTING SHALL MEET THE FOLLOWING SPECIFICATIONS:

3.2.1. ROLANKA BIOD-MAT 90 OR APPROVED EQUIVALENT.

3.3. ALL OTHER DISTURBED AREAS TO BE SEEDED OR STABILIZED SHALL BE STABILIZED WITH MATTING MEETING THE

FOLLOWING SPECIFICATIONS:

3.3.1. ROLLMAX BIONET C125BN OR APPROVED EQUIVALENT.

4. DURING NON-GERMINATING PERIODS, TEMPORARY STABILIZATION SHALL BE ACHIEVED THROUGH MULCHING. SEE THE

MULCHING SPECIFICATION BELOW.

PERMANENT CONTROL MEASURES

1. PERMANENT VEGETATION COVER

1.1. ALL DISTURBED AREAS THAT ARE NOT PROPOSED TO BE ROCK COVER SHALL BE COVERED WITH VEGETATION IN ORDER TO

MINIMIZE EROSION.

1.2. PERMANENT COVER SHALL BE APPLIED PER THE SEEDING & PLANT SCHEDULES AND IN ACCORDANCE WITH THE PLANS.

2. MULCH

2.1. STRAW MULCH SHALL BE APPLIED AT A RATE OF 3 TONS PER ACRE TO DISTURBED OVER-BANK SEEDING AREAS TO HELP

ESTABLISH A PERMANENT PLANT COVER AND TO PREVENT EROSION.

2.2. STRAW MULCH SHALL BE ANCHORED IMMEDIATELY AFTER APPLICATION BY ONE OF THE FOLLOWING MEANS;

2.2.1. A TRACTOR-DRAWN IMPLEMENT DESIGNED TO CRIMP THE STRAW INTO THE SOIL (A TRACKED VEHICLE SHOULD NOT BE

USED FOR THIS PURPOSE)

2.2.2. 'SYNTHETIC BINDERS APPLIED PER MANUFACTURER'S RECOMMENDATIONS

2.2.3. LIGHTWEIGHT PLASTIC, FIBER, OR PAPER NETTING STAPLED OVER MULCH ACCORDING TO MANUFACTURER'S

RECOMMENDATIONS. MATERIAL MUST BE BIODEGRADABLE

3. EROSION CONTROL FABRIC PROTECTIVE BLANKET SHOULD BE USED TO STABILIZE ALL SEEDED AREAS ADJACENT TO OR WITHIN

50 FEET OF STREAMS, PONDS OR WETLANDS.

DEWATERING AND SEDIMENT REMOVAL NOTES

1. DEWATERING SYSTEMS

a. PROVIDE DEWATERING CONTROL PLAN FOR ENGINEER'S REVIEW AND APPROVAL IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS.

b. PROVIDE, OPERATE, AND MAINTAIN DEWATERING SYSTEMS OF SUFFICIENT SIZE AND CAPACITY TO PERMIT EXCAVATION AND SUBSEQUENT CONSTRUCTION IN THE DRY AND EMPTY PONDS. CONTINUOUSLY MAINTAIN EXCAVATIONS FREE OF WATER, REGARDLESS OF SOURCE, AND UNTIL EXCAVATED TO FINAL GRADE.

c. THE CONTRACTOR SHALL PUMP OUT OR OTHERWISE REMOVE ANY WATER WHICH MAY BE FOUND IN THE EXCAVATION, AND PROVIDE DRAINAGE DITCHES, UNDER-DRAINS, FLUMES, WELL POINTS, AND PUMPING EQUIPMENT, AS NECESSARY, TO KEEP THE EXCAVATION ENTIRELY CLEAR OF WATER WHILE EXCAVATION OPERATIONS ARE BEING PERFORMED REQUIRING A DRY CONDITION.

d. ALL DISCHARGE RESULTING FROM DE-WATERING OF EXCAVATIONS SHALL BE COLLECTED AND DIVERTED TO FACILITIES FOR REMOVAL OF SEDIMENT. SUCH FACILITIES SHALL BE REVIEWED AND APPROVED BY THE ENGINEER BEFORE THEIR CONSTRUCTION.

WATER SHALL BE CONVEYED TO AREAS SPECIFIED BY THE ENGINEER ON-SITE. NO WATER SHALL BE RUN DIRECTLY TO STREAMS OR

DRAINS.

2. POND SEDIMENT REMOVAL

a. CONTRACTOR SHALL UTILIZE EXISTING GRAVEL DRIVE FOR ACCESS AS SHOWN ON THE PLANS.

b. PROVIDE SEDIMENT REMOVAL AND OPERATIONS PLAN FOR ENGINEER'S REVIEW AND APPROVAL IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

c. PROTECT ADJACENT STRUCTURES AND UTILITIES FROM DAMAGE RESULTING FROM OPERATIONS INCLUDING, BUT NOT LIMITED TO, SETTLEMENT, CONSOLIDATION, DISPLACEMENT, CRACKING, VIBRATION, UNDERMINING, WASHOUT, AND UPLIFT CAUSED BY

EXCAVATION, OR OTHER OPERATION.

d. POND SEDIMENT REMOVAL SHALL INCLUDE REMOVAL OF MATERIAL IN DESIGNATED AREAS TO ORIGINAL POND DEPTHS AS

INDICATED ON THE PLANS OR FIELD DETERMINED. ASSUMED MAXIMUM DEPT SHALL BE 8'.

e. IF PRESENT, POND CLAY LINER DEPTH AND LOCATION TO BE LOCATED AND SURVEYED PRIOR TO MECHANICAL EXCAVATION/SEDIMENT REMOVAL OPERATIONS. POND EXCAVATION AND SEDIMENT REMOVAL SHALL NOT DAMAGE OR PUNCTURE EXISTING POND CLAY LINER. ENGINEER AND OWNER TO BE NOTIFIED IF PROPOSED EXCAVATION AND POND GRADING LIMIT EXCEEDS

EXISTING POND LINER DEPTH.

f. SEDIMENT MATERIAL CAN BE STOCKPILED IN THE POND TO ALLOW FOR INITIAL PASSIVE DEWATERING. THE SEDIMENT REMOVAL AND OPERATIONS PLAN MUST OUTLINE METHODS ON HOW TO DRY THE SEDIMENT ADEQUATELY FOR TRANSPORTATION AND DISPOSAL.

g. DO NOT DISTURB SEDIMENTS OUTSIDE OF THE ORDINARY EDGE OF WATER.

h. EXCAVATION EQUIPMENT PRODUCTION RATE: THE EXCAVATION RATE FOR REMOVAL AND DISPOSAL OF THE SEDIMENT MATERIAL

SHALL BE CAPABLE OF MEETING THE OVERALL PROJECT SCHEDULE.

i. DISPOSAL: THE EXCAVATED SOIL MATERIAL SHALL REMOVED FROM THE SITE IN ACCORDANCE WITH ANY FEDERAL, STATE, OR LOCAL

REGULATIONS.

CONTRACTOR NOTES

1. THE CONTRACTOR SHALL SCHEDULE ALL NECESSARY INSPECTIONS WITH THE MUNICIPALITY AND COMPLY WITH ALL REQUESTS AND DIRECTIVES INCLUDING CORRECTING DEFECTIVE WORK AS REQUIRED TO OBTAIN FINAL APPROVAL OF THE

WORK AND CLOSING OUT THE PROJECT.

2. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE AND FEDERAL REGULATIONS AND SPECIFICATIONS INCLUDING SAFETY STANDARDS AND ANY APPLICABLE GRANT REQUIREMENTS SHOULD THE PROJECT BE FUNDED BY ANY GRANTS.

3. THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .