About this file

This is a Scope of Work document for Section 260505 - Selective Demolition for Electrical, part of Project 25-388 CBI HVAC and Lighting Upgrade. The document outlines the electrical demolition requirements for the project, including the removal and disposal of existing electrical installations, equipment, and materials. The work includes disconnecting and removing abandoned wiring, conduit, outlets, panelboards, distribution equipment, and luminaires throughout the facility. The scope requires the contractor to verify field measurements and circuiting arrangements before beginning demolition, coordinate utility service outages with utility companies, and report any discrepancies to the Owner and Architect. The contractor must maintain existing electrical, fire alarm, and telephone systems in service during construction, with temporary connections and 24-hour advance notifications required for any system disabling. The project requires special handling of hazardous materials including PCB-containing equipment, DEHP-containing ballasts, and mercury-containing lamps in accordance with Federal Toxic Substances Control Act regulations.

The document specifies that all removal and disposal work must comply with applicable federal, state, and local regulations governing toxic substances. The contractor must extend existing installations using materials and methods compatible with existing electrical systems, repair any adjacent construction and finishes damaged during demolition, and maintain access to electrical installations that remain active. The scope includes patching of walls and floors where abandoned conduit is removed, and providing blank covers for abandoned outlets not removed. No specific pricing, contract term, award date, or bidding timeline information is provided in this section of the specifications.

View the file

Other files

File Type Posted
CBI GJ Project Manual_VSS_R8 mm 10am.pdf PDF
TYPE S1 iO-CoviO-Spec-Sheet.pdf PDF
230529-RIB-Hangers and Supports for HVAC Piping and Equipment-12-24-2025.pdf PDF
233423-RIB-HVAC Power Ventilators-12-24-2025.pdf PDF
230593-RIB-Testing, Adjusting, and Balancing for HVAC-12-24-2025.pdf PDF
235100-RIB-Breechings, Chimneys, and Stacks-12-24-2025.pdf PDF
265140-LUT-Luminaires-12-24-2025.pdf PDF
232123-RIB-Hydronic Pumps-12-24-2025.pdf PDF
260923-RIB-Lighting Control Devices-12-24-2025.pdf PDF
Bid Questions - BCE Response - 05012026.pdf PDF
230719-RIB-HVAC Piping Insulation-12-24-2025.pdf PDF
230523-RIB-General-Duty Valves for HVAC Piping-12-24-2025.pdf PDF
TYPE P1 Corelite-Iridium-i3-Suspended-specification-sheet.pdf PDF
232114-RIB-Hydronic Specialties-12-24-2025.pdf PDF
TYPE EMX CMB-ISOLITE-Specification.pdf PDF
230923 Alerton Direct Digital Control System for HVAC.pdf PDF
265600-RIB-Exterior Lighting-12-24-2025.pdf PDF
230800-RIB-Commissioning of HVAC-12-24-2025.pdf PDF
235216-RIB-Condensing Boilers-12-24-2025.pdf PDF
230513-RIB-Common Motor Requirements for HVAC Equipment-12-24-2025.pdf PDF
238126.13-RIB-Small-Capacity Split-System Air Conditioners-12-24-2025.pdf PDF
265100-RIB-Interior Lighting-12-24-2025.pdf PDF
TYPE IU Sure-Lites-SLX-Surface-Mount-LED.pdf PDF
TYPE D3 PrentaLux-CYL6-6-Sustainable-LED-Cylinder-Luminaire-Spec-Sheet.pdf PDF
260553-RIB-Identification for Electrical Systems-12-24-2025.pdf PDF
221006-RIB-Plumbing Piping Specialties-12-24-2025.pdf PDF
220529-RIB-Hangers and Supports for Plumbing Piping and Equipment-12-24-2025.pdf PDF
232113-RIB-Hydronic Piping-12-24-2025.pdf PDF
25388-CBI 100% CD w Add1.pdf PDF
237413-RIB-Packaged Outdoor Central-Station Air-Handling Units-12-24-2025.pdf PDF
260583-RIB-Wiring Connections-12-24-2025.pdf PDF
230913-RIB-Instrumentation and Control Devices for HVAC-12-24-2025.pdf PDF
231123-RIB-Facility Natural-Gas Piping-12-24-2025.pdf PDF
260519-RIB-Low-Voltage Electrical Power Conductors and Cables-12-24-2025.pdf PDF
230553-RIB-Identification for HVAC Piping and Equipment-12-24-2025.pdf PDF
220553-RIB-Identification for Plumbing Piping and Equipment-12-24-2025.pdf PDF
TYPE P2 Metalux-Cruze-Linear-Bay-spec-sheet.pdf PDF
221005-RIB-Plumbing Piping-12-24-2025.pdf PDF
262726-RIB-Wiring Devices-12-24-2025.pdf PDF
Answers to Questions_IFB REAA 2027-05.pdf PDF
233100-RIB-HVAC Ducts and Casings-12-24-2025.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-388 CBI HVAC and Lighting Upgrade 260505 - 1 Selective Demolition for Electrical

SECTION 260505

SELECTIVE DEMOLITION FOR ELECTRICAL

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Electrical demolition.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT

A. Materials and equipment for patching and extending work: As specified in individual sections.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify field measurements and circuiting arrangements are as indicated.

B. Verify that abandoned wiring and equipment serve only abandoned facilities.

C. Demolition drawings are based on casual field observation and existing record documents.

D. Report discrepancies to Owner before disturbing existing installation.

E. Report discrepancies to Architect before disturbing existing installation.

F. Beginning of demolition means installer accepts existing conditions.

3.02 PREPARATION

A. Disconnect electrical systems in walls, floors, and ceilings to be removed.

B. Coordinate utility service outages with utility company.

C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations.

D. Existing Electrical Service: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Minimize outage duration.

1. Obtain permission from Owner at least 24 hours before partially or completely disabling system.

2. Make temporary connections to maintain service in areas adjacent to work area.

E. Existing Fire Alarm System: Maintain existing system in service until new system is accepted.

Disable system only to make switchovers and connections. Minimize outage duration.

1. Notify Owner before partially or completely disabling system.

2. Make notifications at least 24 hours in advance.

3. Make temporary connections to maintain service in areas adjacent to work area.

F. Existing Telephone System: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Minimize outage duration.

1. Notify Owner at least 24 hours before partially or completely disabling system.

3.03 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK

A. Perform work for removal and disposal of equipment and materials containing toxic substances regulated under the Federal Toxic Substances Control Act (TSCA) in accordance with applicable federal, state, and local regulations. Applicable equipment and materials include, but are not limited to:

1. PCB-containing electrical equipment, including transformers, capacitors, and switches.

2. PCB- and DEHP-containing lighting ballasts.

25-388 CBI HVAC and Lighting Upgrade 260505 - 2 Selective Demolition for Electrical

3. Mercury-containing lamps and tubes, including fluorescent lamps, high intensity discharge (HID), arc lamps, ultra-violet, high pressure sodium, mercury vapor, ignitron tubes, neon, and incandescent.

B. Remove, relocate, and extend existing installations to accommodate new construction.

C. Remove abandoned wiring to source of supply.

D. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.

E. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets that are not removed.

F. Disconnect and remove abandoned panelboards and distribution equipment.

G. Disconnect and remove electrical devices and equipment serving utilization equipment that has been removed.

H. Disconnect and remove abandoned luminaires. Remove brackets, stems, hangers, and other accessories.

I. Repair adjacent construction and finishes damaged during demolition and extension work.

J. Maintain access to existing electrical installations that remain active. Modify installation or provide access panel as appropriate.

K. Extend existing installations using materials and methods compatible with existing electrical installations, or as specified.

END OF SECTION