This is a technical specification document for condensing boilers as part of Project 25-388 CBI HVAC and Lighting Upgrade, Section 235216. The project requires the installation of factory-assembled, condensing boiler units suitable for indoor applications that burn natural gas, propane, or a combination of both fuels. The boilers must achieve an Annual Fuel Utilization Efficiency (AFUE) of 0.95 and a thermal efficiency of 93 percent as defined by AHRI 1500 (I-P) standards. The specification mandates that all units comply with ASME Boiler and Pressure Vessel Code Section IV, bear the ASME "H" stamp, and be listed in both the AHRI Directory of Certified Product Performance and the NBBI Manufacturer and Repair Directory. Approved manufacturers are limited to Lochinvar LLC, with substitutions permitted only through Section 016000 Product Requirements. The document does not specify quantities, response dates, bidder meetings, or award dates, as it functions as a technical specification rather than a solicitation notice.

The specification requires manufacturers to have a minimum of three years of documented experience in producing similar products and mandates comprehensive submittals including product data, installation instructions, factory inspection reports, and field combustion test results. A five-year warranty covering the heat exchanger is required, with warranty forms to be completed in the Owner's name and registered with the manufacturer. Installation must comply with NFPA 54 National Fuel Gas Code and applicable local codes, with boilers installed on concrete housekeeping bases. Commissioning activities include a mandatory preinstallation meeting one week prior to work commencement, system demonstration to the Owner's designated representative, and a minimum of two hours of training provided by manufacturer personnel at the project site. The specification does not address pricing, set-asides, incumbent contractors, or funding sources, as these elements are typically contained in separate procurement documents.

View the file

Other files

File Type Posted
CBI GJ Project Manual_VSS_R8 mm 10am.pdf PDF
TYPE S1 iO-CoviO-Spec-Sheet.pdf PDF
230529-RIB-Hangers and Supports for HVAC Piping and Equipment-12-24-2025.pdf PDF
233423-RIB-HVAC Power Ventilators-12-24-2025.pdf PDF
230593-RIB-Testing, Adjusting, and Balancing for HVAC-12-24-2025.pdf PDF
235100-RIB-Breechings, Chimneys, and Stacks-12-24-2025.pdf PDF
265140-LUT-Luminaires-12-24-2025.pdf PDF
232123-RIB-Hydronic Pumps-12-24-2025.pdf PDF
260923-RIB-Lighting Control Devices-12-24-2025.pdf PDF
Bid Questions - BCE Response - 05012026.pdf PDF
230719-RIB-HVAC Piping Insulation-12-24-2025.pdf PDF
230523-RIB-General-Duty Valves for HVAC Piping-12-24-2025.pdf PDF
TYPE P1 Corelite-Iridium-i3-Suspended-specification-sheet.pdf PDF
232114-RIB-Hydronic Specialties-12-24-2025.pdf PDF
TYPE EMX CMB-ISOLITE-Specification.pdf PDF
230923 Alerton Direct Digital Control System for HVAC.pdf PDF
265600-RIB-Exterior Lighting-12-24-2025.pdf PDF
230800-RIB-Commissioning of HVAC-12-24-2025.pdf PDF
230513-RIB-Common Motor Requirements for HVAC Equipment-12-24-2025.pdf PDF
238126.13-RIB-Small-Capacity Split-System Air Conditioners-12-24-2025.pdf PDF
265100-RIB-Interior Lighting-12-24-2025.pdf PDF
TYPE IU Sure-Lites-SLX-Surface-Mount-LED.pdf PDF
TYPE D3 PrentaLux-CYL6-6-Sustainable-LED-Cylinder-Luminaire-Spec-Sheet.pdf PDF
260553-RIB-Identification for Electrical Systems-12-24-2025.pdf PDF
221006-RIB-Plumbing Piping Specialties-12-24-2025.pdf PDF
220529-RIB-Hangers and Supports for Plumbing Piping and Equipment-12-24-2025.pdf PDF
232113-RIB-Hydronic Piping-12-24-2025.pdf PDF
25388-CBI 100% CD w Add1.pdf PDF
237413-RIB-Packaged Outdoor Central-Station Air-Handling Units-12-24-2025.pdf PDF
260583-RIB-Wiring Connections-12-24-2025.pdf PDF
230913-RIB-Instrumentation and Control Devices for HVAC-12-24-2025.pdf PDF
260505-RIB-Selective Demolition for Electrical-12-24-2025.pdf PDF
231123-RIB-Facility Natural-Gas Piping-12-24-2025.pdf PDF
260519-RIB-Low-Voltage Electrical Power Conductors and Cables-12-24-2025.pdf PDF
230553-RIB-Identification for HVAC Piping and Equipment-12-24-2025.pdf PDF
220553-RIB-Identification for Plumbing Piping and Equipment-12-24-2025.pdf PDF
TYPE P2 Metalux-Cruze-Linear-Bay-spec-sheet.pdf PDF
221005-RIB-Plumbing Piping-12-24-2025.pdf PDF
262726-RIB-Wiring Devices-12-24-2025.pdf PDF
Answers to Questions_IFB REAA 2027-05.pdf PDF
233100-RIB-HVAC Ducts and Casings-12-24-2025.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-388 CBI HVAC and Lighting Upgrade 235216 - 1 Condensing Boilers

SECTION 235216

CONDENSING BOILERS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Manufactured units.

B. Boiler construction.

C. Boiler trim.

D. Fuel burning system.

E. Factory installed controls.

1.02 RELATED REQUIREMENTS

A. Section 033000 - Cast-in-Place Concrete.

B. Section 230913 - Instrumentation and Control Devices for HVAC.

C. Section 232123 - Hydronic Pumps.

D. Section 235100 - Breechings, Chimneys, and Stacks.

1.03 REFERENCE STANDARDS

A. AHRI Directory of Certified Product Performance - Air-Conditioning, Heating, and Refrigeration

Institute (AHRI); Current Edition.

B. AHRI 1500 (I-P) - Performance Rating of Commercial Space Heating Boilers; 2024.

C. ASHRAE Std 90.1 I-P - Energy Standard for Buildings Except Low-Rise Residential Buildings;

Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

D. ASHRAE Std 103 - Method of Testing for Annual Fuel Utilization Efficiency of Residential Central Furnaces and Boilers; 2022, with Errata (2025).

E. ASME BPVC-IV - Boiler and Pressure Vessel Code, Section IV - Rules for Construction of Heating Boilers; 2025, with Errata.

F. NBBI Manufacturer and Repair Directory - The National Board of Boiler and Pressure Vessel Inspectors (NBBI); Current Edition.

G. NFPA 54 - National Fuel Gas Code; 2024.

H. SCAQMD 1146.1 - Emissions of Oxides of Nitrogen from Small Industrial, Institutional, and

Commercial Boilers, Steam Generators, and Process Heaters; 1990, with Amendment (2018).

1.04 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Conduct a preinstallation meeting one week prior to the start of the work of this section; require attendance by all affected installers.

1.05 SUBMITTALS

A. See Section 013000 - Administrative Requirements for submittals procedures.

B. Product Data: Provide data indicating general assembly, components, controls, safety controls, and wiring diagrams with electrical characteristics and connection requirements, and service connections.

C. Manufacturer's Installation Instructions: Indicate assembly, support details, connection requirements, and include start up instructions.

D. Manufacturer's Factory Inspection Report: Submit boiler inspection prior to shipment.

E. Manufacturer's Field Reports: Burner manifold gas pressure, percent carbon monoxide (CO), percent oxygen (O), percent excess air, flue gas temperature at outlet, ambient temperature, net stack temperature, percent stack loss, percent combustion efficiency, and heat output.

1. Indicate compliance with specified performance and efficiency.

Upgrade 235216 - 2 Condensing Boilers

2. Provide results of the following combustion tests:

a. Boiler firing rate.

b. Over fire draft.

c. Gas flow rate.

d. Heat input.

e. Burner manifold gas pressure.

f. Percent carbon monoxide.

g. Percent oxygen.

h. Percent excess air.

i. Flue gas temperature at outlet.

j. Ambient temperature.

k. Net stack temperature.

l. Percent stack loss.

m. Percent combustion efficiency.

n. Heat output.

F. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, cleaning procedures, replacement parts list, and maintenance and repair data.

G. Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

1.06 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Protect boilers from damage by leaving factory inspection openings and shipping packaging in place until final installation.

1.08 WARRANTY

A. See Section 017800 - Closeout Submittals for additional warranty requirements.

B. Provide a five year warranty to include coverage for heat exchanger.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Natural Gas, Propane, or Combination Natural Gas/Propane for Indoor Applications:

1. Lochinvar LLC: www.lochinvar.com/#sle.

2. Substitutions: See Section 016000 - Product Requirements.

2.02 MANUFACTURED UNITS

A. Factory assembled, factory fire-tested, self-contained, readily transported unit ready for automatic operation except for connection of water, fuel, electrical, and vent services.

B. Unit: Metal membrane wall, water or fire tube, condensing boiler on integral structural steel frame base with integral fuel burning system, firing controls, boiler trim, insulation, and removable jacket, suitable for indoor application.

C. Annual Fuel Utilization Efficiency (AFUE): 0.95 in accordance with ASHRAE Std 103.

D. Thermal Efficiency as defined by AHRI 1500 (I-P): 93.

2.03 BOILER CONSTRUCTION

A. Comply with the minimum requirements of ASME BPVC-IV and ANSI Z21.13 for construction of boilers.

B. Assembly to bear the ASME "H" stamp and comply with the efficiency requirements of the latest edition of ASHRAE Std 90.1 I-P.

C. Required Directory Listings:

Upgrade 235216 - 3 Condensing Boilers

1. AHRI Directory of Certified Product Performance - Air-Conditioning, Heating, and Refrigeration Institute (AHRI); current edition at www.ahrinet.org.

2. NBBI Manufacturer and Repair Directory - The National Board of Boiler and Pressure Vessel Inspectors (NBBI); current edition at www.nationalboard.org.

D. Heat Exchanger: Construct with materials that are impervious to corrosion where subject to contact with corrosive condensables.

E. Provide adequate tappings, observation ports, removable panels, and access doors for entry, cleaning, and inspection.

F. Insulate casing with insulation material, protected and covered by heavy-gauge metal jacket.

G. Factory apply boiler base and other components, that are subject to corrosion, with durable, acrylic, powder coated, painted, or weather-proofed finish.

2.04 BOILER TRIM

A. ASME rated pressure relief valve.

B. Flow switch.

C. Electronic Low Water Cut-off: Complete with test light and manual reset button to automatically prevent firing operation whenever boiler water falls below safe level.

D. Temperature and pressure gauge.

E. Pressure Switches:

1. High gas pressure.

2. Low gas pressure.

3. Air pressure.

F. Manual reset high limit.

G. Boiler Pump (where required by boiler design):

1. Primary pump, factory supplied and sized for field installation to ensure minimum, continuous circulation through boiler.

2. Where pump is not provided by boiler manufacturer, provide pump in accordance with boiler manufacturer's recommendations.

3. Pump time delay.

2.05 FUEL BURNING SYSTEM

A. Provide forced draft automatic burner, integral to boiler, designed to burn natural gas, and maintain fuel-air ratios automatically.

1. Blower Design: Statically and dynamically balanced to supply combustion air; direct connected to motor.

2. Combustion Air Filter: Protects fuel burning system from debris.

B. Gas Train: Plug valve, safety gas valve, gas-air ratio control valve, and pressure regulator controls air and gas mixture.

C. Emission of Oxides of Nitrogen Requirements: Comply with SCAQMD 1146.1 for natural gas fired system, as applicable.

D. Intakes: Combustion air intake capable of accepting free mechanical room air or direct outside air through a sealed intake pipe.

2.06 FACTORY INSTALLED CONTROLS

A. Option for internal or external (0-10) VDC control.

B. Temperature Controls:

1. Automatic reset type to control fuel burning system on-off and firing rate to maintain temperature.

2. Manual reset type to control fuel burning system to prevent boiler water temperature from exceeding safe system water temperature.

3. Low-fire start time delay relay.

Upgrade 235216 - 4 Condensing Boilers

C. Electronic PI setpoint/modulation control system.

D. Microprocessor-based, fuel/air mixing controls.

2.07 SOURCE QUALITY CONTROL

A. See Section 014000 - Quality Requirements for additional requirements.

B. Provide factory tests to check construction, controls, and operation of unit.

C. Manufacturer to conduct boiler inspection prior to shipment; submit copy of inspection report to

Architect.

D. Non-Complying Work: See Section 014000.

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Install boiler and provide connection of natural gas service in accordance with requirements of

NFPA 54 and applicable codes.

C. Install boiler on concrete housekeeping base, sized minimum of 4 inches larger than boiler base in accordance with Section 033000.

D. Coordinate factory installed controls with Section 230913.

E. Pipe relief valves to nearest floor drain.

F. Pipe cooled condensate produced by the combustion process from the boiler condensate connection and/or flue stack with suitable piping material to neutralizer prior to discharging into nearest floor drain.

G. Install primary boiler pump in accordance with Section 232123.

H. Connect vent combustion generated fumes to breeching, chimney or exhaust stack; see

Section 235100.

3.02 CLOSEOUT ACTIVITIES

A. Demonstrate proper operation of equipment to Owner's designated representative.

B. Demonstration: Demonstrate operation of system to Owner's personnel.

1. Use operation and maintenance data as reference during demonstration.

2. Briefly describe function, operation, and maintenance of each component.

C. Training: Train Owner's personnel on operation and maintenance of system.

1. Use operation and maintenance manual as training reference, supplemented with additional training materials as required.

2. Provide minimum of two hours of training.

3. Instructor: Manufacturer's training personnel.

4. Location: At project site.

END OF SECTION