This document is a utility coordination email chain between Kisinger Campo & Associates Corp. (KCA), the design engineer of record, and Collier County Traffic Operations regarding Phase III construction plans for the 16th Street NE Bridge Project (FPID No. 451283-1-58-01) in Naples, Florida. The email, dated August 21-22, 2023, requests confirmation of no conflicts with existing buried fiber optic (BFO) facilities owned by Collier County along Golden Gate Boulevard E. The submittal includes Phase III Roadway Plans, Structures Plans, Signal Plans, Lighting Plans, and a Utility Conflict Matrix for review. A "No Conflict" response was requested by close of business Friday, September 22, 2023, to support preparation of the necessary LAP Checklist (Utility Clearance) documentation. All project correspondence should be directed to Jesse E. Gill, P.E., Team Leader of Roadway Design at Kisinger Campo & Associates Corp., located at 13461 Parker Commons Boulevard, Suite 104, Fort Myers, FL 33912.
This utility coordination document is part of the larger 16th Street NE Bridge Project, a federally-funded infrastructure improvement initiative with a total project budget of approximately $26,361,418. The project includes construction of a 147-foot bridge with two 12-foot travel lanes, widening of approximately 3.3 miles of roadway, installation of a 6-foot sidewalk, implementation of new traffic signals, and associated drainage and utility modifications. The project requires compliance with federal regulations including Davis-Bacon wage requirements, Buy America provisions, and environmental protections for endangered species. The bid deadline is November 20, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for October 21, 2025, at 10:00 a.m. in Naples, Florida.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jesse Gill
From: Haris Domond <Haris.Domond@colliercountyfl.gov> Sent: Tuesday, August 22, 2023 7:19 AM To: Jesse Gill; Christine Arnold Cc: Pamela Wilson; Mowendy Etienne; Juan Villafuerte Subject: RE: 451283-1-58-01 16th Street NE Bridge - Phase III RGB & UWS
BFO - No Conflicts
Respectfully, Haris Marcel Domond Signal System Network Specialist Locate Supervisor
Traffic Management Center 2885 South Horseshoe Drive. Naples Florida 34104 Phone: 239.252.5000 Desk Phone: 239.252.5151 Haris.Domond@colliercountyfl.gov
Caution: External email.
From: Jesse Gill <JGill@kcaeng.com> Sent: Monday, August 21, 2023 6:31 PM To: Christine Arnold <Christine.Arnold@colliercountyfl.gov> Cc: Haris Domond <Haris.Domond@colliercountyfl.gov>; Pamela Wilson <Pamela.Wilson@colliercountyfl.gov>;
Mowendy Etienne <MEtienne@kcaeng.com>; Juan Villafuerte <JVillafuerte@kcaeng.com> Subject: 451283-1-58-01 16th Street NE Bridge - Phase III RGB & UWS
EXTERNAL EMAIL: This email is from an external source. Confirm this is a trusted sender and use extreme caution when opening attachments or clicking links.
Christine Arnold
Collier County
Traffic Operations
Notice to Submit Phase III Construction Plans Submittal
Project No. 60212.1 FPID No. 451283-1-58-01 County: Collier Road ID: 16th Street NE Description: 16th Street NE Bridge Construction and Roadway Improvements
Good Afternoon Ms. Arnold, Kisinger Campo & Associates Corp. (KCA) is the design Engineer of Record for the Collier County Transportation Management Services Department on the above referenced project. This project involves the construction of a bridge servicing 16th Street NE and Construction of Roadway Improvements in Naples, Florida. We understand that the County has buried fiber optic (BFO) facilities within the limits of the project along Golden Gate Blvd E. As of the date of this email, there are no proposed conflicts with the existing BFO facilities owned by Collier County . If you are in agreeance, please send me a “No Conflict” response to aid in the preparation of the necessary LAP Checklist (Utility Clearance) documentation.
The following documents are included in the link below for your use in reviewing the submittal and confirming no conflict:
1. Phase III Roadway Plans
2. Phase III Structures Plans
3. Phase III Signal Plans
4. Phase III Lighting Plans
5. Phase III Utility Conflict Matrix
6. Utility Work Schedule
Plans are available for download at: Phase III Utility Coordination
To alleviate unreasonable interference with the project’s design schedule, please email a “No Conflict” response to Jesse Gill at jgill@kcaeng.com by close of business Friday, September 22, 2023.
If you are the incorrect person to process this request, please let me know as soon as possible.
Thank you for your prompt attention to this matter.
Note: This utility contact is being done electronically via email. If you need a hard copy format of our plans or other project related information, please address all correspondence, verbal and written, to Jesse E. Gill, P.E. at the address listed below.
Jesse E. Gill, PE Team Leader - Roadway Design
Email: JGill@kcaeng.com Office: 239.278.5999 Cell: 239.898.9440 13461 Parker Commons Blvd, Suite 104, Ft. Myers, FL 33912
CONFIDENTIALITY NOTE: This communication may be privileged and confidential. It should not be disseminated to others. If received in error, please immediately reply that you have received this communication in error and then delete it. Thank you.
Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing.
File details come from the government source that posted it. Updated .