This is an Indoor Air Quality (IAQ) report for Bugbee Elementary School prepared for the Town of West Hartford, Connecticut, in support of the Request for Proposals for a Qualified Energy Service Provider. The report documents a comprehensive assessment of indoor air quality conditions at the school facility, including testing results and findings related to ventilation, air filtration, humidity levels, and other environmental factors affecting occupant health and comfort. The assessment serves as baseline documentation for energy savings measures and system improvements that potential bidders may propose under the Energy Savings Performance Contracting framework. The report provides technical specifications and current system conditions that inform the scope of work for qualified energy service providers competing to implement town-wide efficiency improvements.
The IAQ report functions as a supporting technical document that establishes the existing environmental conditions at Bugbee Elementary School and identifies areas where energy efficiency upgrades and air quality improvements can be integrated. This baseline assessment enables energy service providers to develop targeted proposals for HVAC system upgrades, ventilation enhancements, and related measures that achieve both energy savings and improved indoor environmental quality. The documentation supports the ESPC procurement model by providing detailed facility-specific information necessary for bidders to accurately assess project scope, develop implementation strategies, and project measurable savings across the school district's facilities.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by:
Sustainable Engineering Solutions, LLC 865 Brook Street Rocky Hill, CT 06067
(860) 270-0413 www.sustainable-eng.com
IAQ Verification Report Bugbee Elementary School West Hartford Public Schools West Hartford, CT
SES Project No. 24-411 March 7th, 2025
Sustainable Engineering Solutions, LLC 865 Brook Street Rocky Hill, CT 06067 sustainable-eng.com
Table of Contents Executive Summary
IAQ Verification Process
Filter Evaluation
Ventilation Evaluation
Demand Control Ventilation
Project Approach
Participants
Facility Description
Building
Occupancy
Building Automation System Description
HVAC Systems Description
Air Handling Units
Roof Top Units
Energy Recovery Unit
Unit Ventilators
Exhaust Fans
Recommendations
Initial Recommendations
Recommendation #1: ERU-1 Controls
Recommendation #2: Replace Existing Basement Air Handling Unit
Recommendation #3: Rebalance Rooftop Units
Recommendation #4: Add Gymnasium HVAC Equipment
Recommendation #5: Add Mechanical Ventilation For Spaces With Operable Windows Only
Recommendation #6: Review/Replace Cafeteria Unit Ventilators
Recommendation #7: Rebalance Unit Ventilator for Room 104
Recommendation #8: Replace Toilet Exhaust Fans
Recommendation #9: Filter Improvements
Next Steps
Review Recommendations
Appendix A IAQ Evaluation Sheet Appendix B International Mechanical Code Minimum Ventilation Rates (2021) per ASHRAE 62.1
Executive Summary Sustainable Engineering Solutions, LLC (SES) and Trueflow Testing and Balancing were retained by the Town of West Hartford to provide professional engineering and test and balancing (TAB) services to meet the indoor air quality (IAQ) verification requirements of the state legislation Public Act No. 23-167 at Bugbee Elementary School. This combined effort successfully completed the required verification as outlined in the legislation. With a focus on validating and improving indoor air quality, SES and Trueflow systematically assessed each air handling system to measure current ventilation rates, filtration rates and distribution levels compared to current ventilation standards.
The majority of the building meets ventilation requirements due to the presence of operable windows. However, utilizing operable windows as the primary means of ventilation is not recommended due to poor temperature control.
Recommendations associated with the buildings air handling units, roof top units, unit ventilators and exhaust fans, along with additional findings, have been included in this report for the Client to review.
Note that throughout this report the term “ventilation” air and “outside” are used interchangeably and are one in the same.
IAQ Verification Process Filter Evaluation As required by the law, the team reviewed the current level of filtration installed on each air handling system and analyzed the feasibility of increasing the filter ratings to MERV 13. A filter’s minimum efficiency reporting value, or MERV, is a rating system that measures how efficient a filter is at trapping harmful particulate matter, dust, and debris in the air. This rating system categorizes filters into a ranking from 2 to 20, with a MERV 8 being the standard. A higher MERV rating means that a filter is more efficient and MERV 13 is recommended for many commercial and industrial buildings and by state code. At its minimum, a MERV 13 filter traps more than 70% of air particles that are 0.3 to 1.0 microns in size and is at least 90% effective when the particles increase to 3 to 10 microns in size. Along with assessing the filter efficiencies, the condition of unit’s filters and proper sealing of the filter banks to eliminate bypass air was also assessed.
Ventilation Evaluation The amount of ventilation air delivered into interior occupied spaces is governed by the 2022 Connecticut State Building Code, which references ASHRAE Standard 62.1. This code prescribes the flow rate of ventilation air that must be supplied mechanically, or otherwise, to occupied areas based on occupancy classifications. Depending on the type of use of a space and total space area, outdoor air flow rates in cubic feet per minute (CFM) per person and square foot are defined when the parameters are known. When total occupants per space are unknown, the code defines occupant density for each classification type in number of occupants per space floor area. The final flow rate in CFM for every occupied space can thus be calculated.
As an alternative to providing outside air mechanically to occupied spaces, the building code also allows for outside air to enter occupied areas naturally through operable windows. If the area of operable windows for an occupied space is at least 4% of the space’s floor area, mechanical ventilation for that space is not required by code. However, although spaces with sufficient operable window area may satisfy code requirements, this is not a realistic way of providing adequate ventilation during periods of cold or hot weather.
The amount of outside air supplied to occupied spaces is important for occupant comfort and health because contaminants generated by people and materials in the space must be removed or they will build up to unhealthy levels. Diluting interior air with outside air reduces the concentration of carbon dioxide, volatile organic compounds (VOCs) along with various airborne viral and bacterial contaminants.
Demand Control Ventilation In certain applications, the amount of outside air delivered to a space can be reduced if occupancy and indoor air quality can be safely monitored and controlled. This is most typically accomplished through monitoring carbon dioxide (CO2) and occupancy sensors in the space, otherwise known as “Demand Control Ventilation” or DCV. As occupancy rises in a space, so does the amount of CO2 as a result of the occupant’s natural respiration and exhalation of CO2. By monitoring CO2 and occupancy status, an HVAC system can reduce the amount of outside air to a zone when levels and occupancy are low. If CO2 levels rise above a certain threshold or occupancy is detected, the HVAC system can then increase the amount of fresh air until the levels fall back below an acceptable level. Having an operational demand control ventilation strategy in place will help reduce energy consumption of a facility while simultaneously ensuring all spaces are achieving the required fresh air requirements.
Project Approach During the review of the school, SES took the following steps to complete the study:
• Develop an IAQ evaluation plan and conduct a kickoff meeting with the client and Trueflow to review the plan, project schedule, access, etc.
• Perform a walkthrough of the building to review the HVAC systems providing ventilation air for a condition assessment of the systems, identify remaining useful life and understand any maintenance issues that may be related.
• Review available documentation for the HVAC systems that includes:
o As-built drawings or original design drawings o O&M documentation for systems performance data o Any previous testing adjusting and balancing reports from the HVAC systems o Documentation describing the chronology of known problems, system failures, complaints, and alterations.
• Develop IAQ evaluation documentation for field evaluation of equipment.
• Perform field evaluation of equipment for ventilation sequence of operation and verify calibration of CO2 sensors where used (+/- 50 PPM).
• Review Trueflow’s completed ventilation rate verification sheets for each space for compliance with ASHRAE 62.1
• Review the Trueflow’s completed unit data sheets for each system providing ventilation air for ventilation airflows, filter condition and efficiency, damper conditions and maintenance adequacy.
• Prepare a report that summarizes the verification process, identifies any deficiencies that require correction and any recommendations to address the deficiencies found and next steps.
Participants The participants in the IAQ verification process for this project are identified below.
Owner
West Hartford Public Schools 50 South Main Street West Hartford, CT 06107 Contact: Robert Palmer Email: Robert.palmer@westhartfordct.gov
Engineer
Sustainable Engineering Solutions, LLC 865 Brook Street Rocky Hill, CT 06067 Contact: Brian Messerschmidt, PE, CCP, CEM Email: bmesserschmidt@sustainable-eng.com
TAB Provider
Trueflow Testing & Balancing, LLC 121 Broadway Street, Suite 1 Colchester, CT 06415 Contact: Bonnie Boothroyd Email: bonnie@trueflowct.com
Facility Description Building
Photo Credit: Homes.com
Building: Bugbee Elementary School
Location: 1943 Asylum Ave, West Hartford, CT 06117
Building Size (gross):
66,394 sq. ft.
Year Constructed:
1950 (original)
Building Use (current):
Elementary School
Bugbee Elementary School is a 66,394 square foot building, originally built in 1950. The original building houses a gymnasium, an auditorium, classrooms and offices. Since construction, portable classrooms have been installed to add additional classroom space to the building. During a recent addition, a main office section was constructed, with new HVAC systems including an energy recovery unit and VRFs.
Occupancy The building is occupied Monday through Friday between 8am and 5pm. Special events are held on the weekends and after hours as needed for school extracurricular activities. In addition, the school hosts summer school activities during the summer break.
Building Automation System Description Currently, equipment in the admin addition (ERU-1 and VRFs) and unit ventilator in room 104 are tied into the building management system. These HVAC systems are controlled by a Niagara framework building automation system.
HVAC Systems Description
Air Handling Units A single air handling unit is installed in the building’s basement. The AHU serves the auditorium and three offices adjacent to the basement mechanical room that houses the unit. This unit is currently inoperable and beyond its useful life expectancy.
Unit Tag Serves AHU Auditorium and Classrooms
Basement Air Handling Unit
Roof Top Units There are six roof top units, five of the six RTU serve existing portable classrooms. The sixth roof top unit serves the library.
The roof top units vary in condition, the Trane RTU-1 & 2 are in fair conditioning, the remaining four RTUs appear to be nearing the end of their useable life, the other two appear to have been installed within the last 15-20 years. Units are not on the building management system.
Unit Tag Manufacturer Serves RTU Heil Portable Classrooms
RTU-1 Trane Library RTU-1 Trane Portable Classrooms RTU-1 Carrier Portable Classrooms RTU-2 Trane Portable Classrooms RTU-2 Carrier Portable Classrooms
Energy Recovery Unit A single energy recovery unit (ERU) serves the main office wing. The ERU is equipped with an outside air damper, economizer damper, return air damper, exhaust air damper, DX cooling coil, hot gas coil, reheat coil, energy recovery wheel and a supply and exhaust fan. The ERU has been designed to provide fresh air for the main office area and their associated VRFs.
Unit Tag Manufacturer Serves ERU-1 AAON Main Office
ERU-1
Unit Ventilators There are three unit ventilators in the facility, one serving classroom 104 and two serving the cafeteria. Each unit ventilator has an outside air louver, which mixes outside air with return air from the space via a return air damper. Each unit ventilator is equipped with a heating coil to meet space temperature setpoint. Unit ventilator in classroom 104 has been added to the building management system (BMS). The unit ventilators in the cafeteria have not been integrated with the BMS. Unit ventilator zones are also equipped with operable windows for manual means of ventilation.
Exhaust Fans Two toilet exhaust fans are installed in the building. One serves basement toilets, and one serves 1st floor toilets. All two fans are equipped with pneumatic controls. The fans are utility style and are nearing the end of their useful lives.
Exhaust Fan
Recommendations The following recommendations were made based on the review of TAB report, ventilation comparisons to the IMC Minimum Ventilation Rates (2021) and industry best practices. Additional supporting information can be found in the Appendices of the report.
Due to the limited area of focus of the required IAQ verification and this review, SES strongly recommends verifying the condition of all related HVAC equipment components and control functionality outside of the scope of this verification, prior to implementing any modifications to the HVAC systems.
Initial Recommendations
• Recommendation #1: Review Controls and Rebalance ERU-1
• Recommendation #2: Replace Existing Air Handling Unit
• Recommendation #3: Rebalance Rooftop Units
• Recommendation #4: Install Roof Top Unit To Provide Mechanical Ventilation and Conditioning To Gymnasium
• Recommendation #5: Add Mechanical Ventilation For Spaces With Operable Windows Only
• Recommendation #6: Review/Replace Cafeteria Unit Ventilators
• Recommendation #7: Rebalance Unit Ventilator for Room 104
• Recommendation #8: Replace Toilet Exhaust Fans
• Recommendation #9: Filter Improvements
Recommendation #1: ERU-1 Controls Based on SES’s review of the TAB data and onsite assessments, ERU-1 was found to be operating in a 100% return air configuration, with no outside air being introduced. This appears to be a function off the unit’s packaged controls. As an energy recovery unit, it should be operating at 100% outside air and 100% exhaust air, utilizing the energy recovery wheel to reduce heating and cooling loads. There is no apparent reason for the unit to be operating in full return mode.
Additionally, the unit was found to be exhausting airflow, which may be causing unconditioned outside air to enter the space due to negative building pressure.
SES recommends reviewing the unit’s packaged controls and coordinate with the building management sytem and recommission the system to operate at 100% outside air. A full-service check should be conducted on the system components; primarily the energy recovery wheel and the heating and cooling element; to ensure proper conditioning of the outside air.
Once 100% outside air operation is established, the majority of spaces will meet or exceed ventilation requirements.
However, the following spaces should be rebalanced to meet the current ventilation requirements as they were previously low:
Room Measured Supply Air
(CFM)
Calculated Ventilation Requirements
(CFM)
Faculty Lounge 122 145 Treatment Area 41 90
Recommendation #2: Replace Existing Basement Air Handling Unit The basement air handling, unit which serves the auditorium and adjacent offices, was found inoperable and past its normal life expectancy. Unit components such as fan, fan motors, ductwork, valve components, and more are deteriorating and compromised and have become unreliable for consistent control. This unit is also stand alone and not currently connected to the building automation system; and is not capable of providing any mechanical cooling.
SES recommends that the air handling unit, associated ductwork and surrounding spaces be reviewed for a possible HVAC renovation project. Due to the difference in space load and ventilation requirements between the auditorium and office spaces, separate HVAC systems may be desired.
Recommendation #3: Rebalance Rooftop Units In review of the TAB data, the following roof top units were measured to supply 0% outside air at the time of reading.
Although the ventilation requirements of these spaces are currently satisfied due to the presence of operable windows, it is not recommended that these spaces rely solely on the operable windows for ventilation. Operable windows are allowable means of ventilation per code, however when utilized for ventilation, typically results in over heating or overcooling of the space. This method of ventilation also requires the occupants to open the windows when in space which typically does not occur.
SES recommends rebalancing the minimum outside air damper position to the minimum outside airflow CFM described below.
Unit ID Manufacturer Service Measured Outside Air (CFM)
Min OA (CFM)
RTU Heil Classroom 17 0 310 RTU-1 Carrier Classroom 18 0 300 RTU-2 Carrier Classroom 19 0 220 RTU-2 Trane Classroom 20 0 300 RTU-1 Trane Classroom 21 and
Corridor 0 300
RTU-1 Trane Library 0 920
Recommendation #4: Add Gymnasium HVAC Equipment Currently the Gymnasium space is not equipped with any means of mechanical ventilation. In addition there are no means of mechanical cooling in this space. Space ventilation requirements are satisfied solely due to the presence of operable windows.
SES recommends reviewing the space requirements and installing a new air handling system to provide temperature and ventilation control to the space.
Recommendation #5: Add Mechanical Ventilation For Spaces With Operable Windows Only During review of TAB data, the following spaces do not have any means of mechanical ventilation. Although these spaces are technically satisfied via code due to the presence of operable windows, operable windows are not a recommended means of ventilation. The required ventilation rates of the spaces has been included below.
Space Calculated Min Outside Air (CFM) Art Classroom 380
Music Room 107 240
Study Area 35
Room 102 35
Custodian's Office 40
Classroom 1 310
Classroom 2 315
Classroom 3 305
Classroom 4 305
Classroom 5 305
Classroom 6 275
Classroom 7 275
Classroom 8 255
Classroom 9 260
Classroom 10 310
Classroom 11 280
Classroom 12 305
Classroom 13 315
Classroom 14 315
Classroom 15 100
Classroom 16 365
Main Lobby 185
Music Room 75
SES recommends an HVAC upgrade to install air handling units to provide mechanical ventilation to the spaces noted above.
Although these spaces have operable windows, utilizing an air handling unit to ventilate these spaces will provide conditioned, dry air throughout the year, independent of current outside air conditions. The calculated outside air requirements for each space have been included in the table above.
Recommendation #6: Review/Replace Cafeteria Unit Ventilators In review of the TAB data, the two unit ventilators serving the cafeteria were found to not satisfy the minimum ventilation requirements for the space without the use of operable windows.
Space Measured Outside Air
(CFM)
Measured Supply Air
(CFM)
Calculated Outside Air Required
(CFM)
Cafeteria - Left 449 1068 815 Cafeteria – Right 0 768 815
With the current equipment installed, the right UV is not capable of supplying enough air to the spaces to satisfy the required outside air levels. The left UV was measured to have sufficient supply air to satisfy the outside air requirement, however, the minimum outside air percentage would be greater than 75%, this would increase the risk of costly maintenance. SES recommends reviewing equipment to determine if fan speeds can be increased. If units are determined to be nearing the end of their useable life, equipment should be replaced with newer models that can be integrated to the building management system.
Recommendation #7: Rebalance Unit Ventilator for Room 104 In review of the TAB data, the unit ventilator serving room 104 was found to not satisfy the minimum ventilation requirements for the space without the use of operable windows.
SES recommends rebalancing the minimum outside air for the unit ventilator to the calculated outside air requirement stated below and an associated minimum outside air damper position assigned.
Space Measured Outside Air
(CFM)
Calculated Outside Air Required
(CFM)
Room 104 35 300
Recommendation #8: Replace Toilet Exhaust Fans During review of TAB data, the following toilet rooms were significantly below the calculated exhaust ventilation requirements. Due to the age of school and the quality of existing drawings, SES was unable to determine exactly which exhaust fans serve which bathrooms.
Space Measured Exhaust Air (CFM) Calculated Required Exhaust Air (CFM) Room 104 0 50 Boys Toilet 163 200
Classroom 9 0 25 Classroom 10 0 25
Boys Toilet Classroom 16 0 25 Girls Toilet Classroom 16 0 25
During the physical walkthrough, two toilet exhaust fans were found to utilize pneumatic controls and appear to be nearing the end of their useable life. In addition, these fans are not currently connected to the building management system (BMS)
SES recommends these two fans are replaced with new fans and are connected to the building management system.
Ventilation requirements for each space and service should be determined prior to installation to determine sizing of each exhaust fan.
Unit ID Service EF-2 Basement Toilets EF-7 1st Floor Toilets
Recommendation #9: Filter Improvements Currently, the following roof top units were found to utilize MERV-8 filters:
• RTU-2 – Classroom 19
• RTU-1 – Library
• RTU-2 – Classroom 20
SES recommends replacing and upgrading all final filters to at least MERV 13 for increased filtration efficiency.
In addition, ERU-1 was found to have dirty filters, filters should be changed to ensure optimal performance.
Next Steps
Review Recommendations It is recommended that the client review this report and the proposed recommendations for further clarification, if needed and decide a course of action. SES can provide additional assistance if needed, to further analyze and develop these recommendations for future implementation, and if desired, provide commissioning of the implemented measures.
Appendix A: IAQ Evaluation Sheet
Tag AREA SERVED Type Pre-Filter
Condition
Final Filter
Conditon Unit Condition Outside Air Control Method CO2 Control? Supply Airflow Min. Outside Airflow3 % OA
Summated OA
Airflow
Calculated Min.
Outside Airflow % OA2 Comments
AHU Basement Air Handling Unit - - Poor Unknown Unknown 0 0 0% 4,167 4,170 #DIV/0! Staff stated unit is out of service.
RTU-2 - Carrier Portable Classrooms Packaged RTU 2 2 Fair Unknown Unknown 1,257 0 0% 214 220 18%
ERU-1 Admin Energy Recovery 3 3 Great 100% Outside Air No 1,808 0 0% 514 520 29%
RTU - Heil Portable Classrooms Packaged RTU 2 2 Good Unknown Unknown 1,066 0 0% 309 310 29%
RTU-1 Library Packaged RTU 1 1 Far Unknown Unknown 2,672 0 0% 915 920 34%
RTU-1 - Trane Portable Classrooms Packaged RTU 1 1 Good Unknown Unknown 2,274 0 0% 300 310 14%
RTU-2 - Trane Portable Classrooms Packaged RTU 2 2 Fair Unknown Unknown 1,375 0 0% 292 300 22%
RTU-1 - Carrier Portable Classrooms Packaged RTU 2 2 Fair Unknown Unknown 796 0 0% 294 300 38%
TAB Measured Filters (1 = clean, 2 = partially loaded, 3 = dirty)
IMC 2021 Ventilation Assessment
Unit Tag Room # Category Infiltration ZoneArea, Az, per space (SF)
Zone
Population, Pz, per space
People OA Rate in
Breathing Zone, Rp
(CFM/person)
Area OA Rate in
Breathing Zone, Ra
(CFM/SF)
Default Occupant
Density
Breathing Zone OA
(CFM) Vbz=RpPz+RaAz
Table 6-2 Zone Air
Distribution
Effectiveness
Zone OA Flow, Voz Min. Ventilation
Airflow (CFM)
Actual Supply
Airflow (CFM)
% OA
Actual Ventilation
Airflow (CFM)
Ventilation Difference
(CFM)
Ventilation
Difference (%)
Code Satisified?
Comments
AHU Auditorium Multiuse assembly No 3500 432 7.5 0.06 100 3,450 1 3,450 3,450 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Office 108A Office spaces No 117 3 5 0.06 5 22 1 22 22 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Office 108B Office spaces No 190 9 5 0.06 5 56 1 56 56 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Office 109 Office spaces No 237.5 8 5 0.06 5 54 1 54 54 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Room 100 Office spaces Yes 300 9 5 0.06 5 63 1 63 63 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Room 101 Office spaces No 790.5 23 5 0.06 5 162 1 162 162 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
AHU Stage Music/theater/dance No 978.5 30 10 0.06 35 359 1 359 359 0 - #VALUE! #VALUE! #VALUE! #VALUE! AHU currently inoperable
ERU-1 Faculty Lounge Cafeteria/fast-food dining No 286 12 7.5 0.18 100 141 1 141 141 122 0% 0 (141) -100% No
ERU-1 Corridor Corridors No 150 8 0 0.06 0 9 1 9 9 427 0% 0 (9) -100% No
ERU-1 Assistant Principal Office Office spaces Yes 108 3 5 0.06 5 21 1 21 21 72 0% 0 (21) -100% Yes*
ERU-1 Nurse's Office Office spaces No 76 2 5 0.06 5 15 1 15 15 54 0% 0 (15) -100% No
ERU-1 Treatment Area Daycare Sickroom No 207 5 10 0.18 25 87 1 87 87 41 0% 0 (87) -100% No
ERU-1 Principal's Office Office spaces Yes 214.5 4 5 0.06 5 33 1 33 33 45 0% 0 (33) -100% Yes*
ERU-1 Main Office Conference room Conference rooms No 220 8 5 0.06 50 53 1 53 53 225 0% 0 (53) -100% No
ERU-1 Main Office Main entry lobbies Yes 720 10 5 0.06 10 93 1 93 93 190 0% 0 (93) -100% Yes*
ERU-1 Redaing Intervention Suite Office spaces No 140.25 4 5 0.06 5 28 1 28 28 257 0% 0 (28) -100% No
ERU-1 Main Office corridor Corridors No 216 6 0 0.06 0 13 1 13 13 135 0% 0 (13) -100% No
ERU-1 Security Office Office spaces No 82.5 3 5 0.06 5 20 1 20 20 240 0% 0 (20) -100% No
RTU - Heil Classroom 17 Classrooms (ages 9 plus) Yes 826 21 10 0.12 35 309 1 309 309 1066 0% 0 (309) -100% Yes*
RTU-1 Library Libraries Yes 4896 60 5 0.12 10 888 1 888 888 2596 0% 0 (888) -100% Yes*
RTU-1 Library Office spaces Yes 131.75 4 5 0.06 5 28 1 28 28 76 0% 0 (28) -100% Yes*
RTU-1 - Carrier Classroom 18 Classrooms (ages 9 plus) Yes 783 20 10 0.12 35 294 1 294 294 796 0% 0 (294) -100% Yes*
RTU-1 - Trane Classroom 21 Classrooms (ages 9 plus) Yes 662.5 19 10 0.12 35 270 1 270 270 1510 0% 0 (270) -100% Yes*
RTU-1 - Trane Corridor Corridors No 516 15 0 0.06 0 31 1 31 31 764 0% 0 (31) -100% No
RTU-2 - Carrier Classroom 19 Classrooms (ages 9 plus) Yes 783 12 10 0.12 35 214 1 214 214 1257 0% 0 (214) -100% Yes*
RTU-2 - Trane Classroom 20 Classrooms (ages 9 plus) Yes 768.5 20 10 0.12 35 292 1 292 292 1375 0% 0 (292) -100% Yes*
UV 104 Classrooms (ages 9 plus) Yes 660 22 10 0.12 35 299 1 299 299 695 5% 35 (264) -88% Yes*
UV Cafeteria Cafeteria/fast-food dining Yes 1152 81 7.5 0.18 100 815 1 815 815 1068 42% 449 (366) -45% Yes*
UV Cafeteria Cafeteria/fast-food dining Yes 1152 81 7.5 0.18 100 815 1 815 815 768 0% 0 (815) -100% Yes*
NA Art Classroom Art Classroom Yes 770.5 24 10 0.18 20 379 1 379 379 0 0% - (379) -100% Yes* No Mechanical Ventilation
NA Music Room 107 Music/theater/dance Yes 575 20 10 0.06 35 235 1 235 235 0 0% - (235) -100% Yes* No Mechanical Ventilation
NA Gym Gym, sports arena (play area) Yes 4920 250 20 0.18 7 5,886 1 5,886 5,886 0 0% - (5,886) -100% Yes* No Mechanical Ventilation
NA Gym Office spaces Yes 120 3 5 0.06 5 22 1 22 22 0 0% - (22) -100% Yes* No Mechanical Ventilation
NA Study Area Reception areas No 194.75 4 5 0.06 30 32 1 32 32 0 0% - (32) -100% No No Mechanical Ventilation
NA Room 102 Office spaces Yes 104.5 5 5 0.06 5 31 1 31 31 0 0% - (31) -100% Yes* No Mechanical Ventilation
NA Custodian's Office Office spaces Yes 240 5 5 0.06 5 39 1 39 39 0 0% - (39) -100% Yes* No Mechanical Ventilation
NA Classroom 1 Classrooms (ages 9 plus) Yes 805 21 10 0.12 35 307 1 307 307 0 0% - (307) -100% Yes* No Mechanical Ventilation
NA Classroom 2 Classrooms (ages 9 plus) Yes 770.5 22 10 0.12 35 312 1 312 312 0 0% - (312) -100% Yes* No Mechanical Ventilation
NA Classroom 3 Classrooms (ages 9 plus) Yes 770.5 21 10 0.12 35 302 1 302 302 0 0% - (302) -100% Yes* No Mechanical Ventilation
NA Classroom 4 Classrooms (ages 9 plus) Yes 770.5 21 10 0.12 35 302 1 302 302 0 0% - (302) -100% Yes* No Mechanical Ventilation
NA Classroom 5 Classrooms (ages 9 plus) Yes 770.5 21 10 0.12 35 302 1 302 302 0 0% - (302) -100% Yes* No Mechanical Ventilation
NA Classroom 6 Classrooms (ages 9 plus) Yes 770.5 18 10 0.12 35 272 1 272 272 0 0% - (272) -100% Yes* No Mechanical Ventilation
NA Classroom 7 Classrooms (ages 9 plus) Yes 782 18 10 0.12 35 274 1 274 274 0 0% - (274) -100% Yes* No Mechanical Ventilation
NA Classroom 8 Classrooms (ages 5 to 8) Yes 770.5 16 10 0.12 25 252 1 252 252 0 0% - (252) -100% Yes* No Mechanical Ventilation
NA Classroom 9 Classrooms (ages 5 to 8) Yes 816.5 16 10 0.12 25 258 1 258 258 0 0% - (258) -100% Yes* No Mechanical Ventilation
NA Classroom 10 Classrooms (ages 5 to 8) Yes 816.5 21 10 0.12 25 308 1 308 308 0 0% - (308) -100% Yes* No Mechanical Ventilation
NA Classroom 11 Classrooms (ages 5 to 8) Yes 816.5 18 10 0.12 25 278 1 278 278 0 0% - (278) -100% Yes* No Mechanical Ventilation
NA Classroom 12 Classrooms (ages 5 to 8) Yes 862.5 20 10 0.12 25 304 1 304 304 0 0% - (304) -100% Yes* No Mechanical Ventilation
NA Classroom 13 Classrooms (ages 5 to 8) Yes 862.5 21 10 0.12 25 314 1 314 314 0 0% - (314) -100% Yes* No Mechanical Ventilation
NA Classroom 14 Classrooms (ages 9 plus) Yes 862.5 21 10 0.12 35 314 1 314 314 0 0% - (314) -100% Yes* No Mechanical Ventilation
NA Classroom 15 Classrooms (ages 5 to 8) Yes 235.75 7 10 0.12 25 98 1 98 98 0 0% - (98) -100% Yes* No Mechanical Ventilation
NA Classroom 16 Classrooms (ages 5 to 8) Yes 1338.75 20 10 0.12 25 361 1 361 361 0 0% - (361) -100% Yes* No Mechanical Ventilation
NA Main lobby Main entry lobbies No 1404 20 5 0.06 10 184 1 184 184 0 0% - (184) -100% No No Mechanical Ventilation
NA Instrumental music room Music/theater/dance Yes 240 6 10 0.06 35 74 1 74 74 0 0% - (74) -100% Yes* No Mechanical Ventilation
Unit Tag Room # Category ZoneArea, Az, per space (SF) TAB Exhaust CFM # of Toilets Calc'd Exhaust CFM
Ventilation Difference
(CFM)
Code Satisified? Comments
EF-2/EF-7 Boys Toilet Toilet rooms - private 90 96 1 25 71 Yes
EF-2/EF-7 Room 104 Toilet rooms - private 44 0 2 50 (50) No
EF-2/EF-7 Girls Toilet Toilet rooms - private 54 71 2 50 21 Yes
EF-2/EF-7 Room 101 Toilet rooms - private 90 75 1 25 50 Yes
EF-2/EF-7 Girls Toilet Toilet rooms - private 269.5 135 6 150 (15) No
EF-2/EF-7 Boys Toilet Toilet rooms - private 269.5 163 8 200 (37) No
EF-2/EF-7 Classroom 8 Toilet rooms - private 22 110 1 25 85 Yes
EF-2/EF-7 Classroom 9 Toilet rooms - private 22 0 1 25 (25) No
EF-2/EF-7 Classroom 10 Toilet rooms - private 22 0 1 25 (25) No
EF-2/EF-7 Classroom 11 Toilet rooms - private 22 34 1 25 9 Yes
EF-2/EF-7 Girls Toilet Toilet rooms - private 198 121 3 75 46 Yes
EF-2/EF-7 Boys Toilet Toilet rooms - private 198 109 5 125 (16) No
EF-2/EF-7 Boys Toilet Classroom 16 Toilet rooms - private 13.5 0 1 25 (25) No
EF-2/EF-7 Girls Toilet Classroom 16 Toilet rooms - private 13.5 0 1 25 (25) No
EF-2/EF-7 Mens Room Toilet rooms - private 77 266 2 50 216 Yes
EF-2/EF-7 Women's Room Toilet rooms - private 105 181 2 50 131 Yes
EF-2/EF-7 Nurses Toilet Toilet rooms - private 56 133 1 25 108 Yes
EF-2/EF-7 Kitchen Bathroom Toilet rooms - private 56 125 1 25 100 Yes
Notes
No fresh air requirements for public bathrooms, only exhaust. Exhaust is 50 CFM or 70 CFM per water closet or urinal. If exhaust fan is intermittent than the higher value is used.
No fresh air requirements for private bathrooms, only exhaust. Exhaust is 25 CFM or 50 CFM per water closet or urinal. If exhaust fan is intermittent than the higher value is used.
No fresh air requirements for shower rooms, only exhaust. Exhaust is 20 CFM or 50 CFM per shower head. If exhaust fan is intermittent than the higher value is used.
Corridors are .06 CFM/sf only
Locker rooms are exhasut only at 0.5 CFM/sf
Corridors are .06 CFM/sf only
Appendix B: International Mechanical Code Minimum Ventilation Rates (2021) per ASHRAE 62.1
Minimum Ventilation Rates in Breathing Zone People Outdoor
Air Rate Rp
Area Outdoor Air
Rate Ra
Default Values
(Occupant Density) Air Class OS (6.2.6.1.4) Comments
Occupancy Classification Category cfm/person cfm/sf #/1000sf
Educational Facilities Art Classroom 10 0.18 20 2 No
Educational Facilities Classrooms (ages 5 to 8) 10 0.12 25 1 No
Educational Facilities Classrooms (ages 9 plus) 10 0.12 35 1 No
Educational Facilities Computer Lab 10 0.12 25 1 No
Educational Facilities Daycare Sickroom 10 0.18 25 3 No
Educational Facilities Daycare (through age 4) 10 0.18 25 2 No
Educational Facilities Auditoriums 5 0.06 150 0
Educational Facilities Lecture Classroom 7.5 0.06 65 1 Yes
Per ASHRAE, lecture classrooms are spaces with low space generated emissions and hard surfaces. Little off gassing so reduced levels. Most standard classrooms will be lecture classroom type.
Educational Facilities Lecture hall (fixed seats) 7.5 0.06 150 1 Yes University style (see occupant density)
Educational Facilities Libraries 5 0.12 10 n/a No
Educational Facilities Media Center 10 0.12 25 1 No
Educational Facilities Multiuse assembly 7.5 0.06 100 1 Yes
Educational Facilities Music/theater/dance 10 0.06 35 1 Yes
Educational Facilities Science laboratories 10 0.18 25 2 No
Educational Facilities University/college laboratories 10 0.18 25 2 No
Educational Facilities Sports locker rooms 0 -0.7 0 0 No
Educational Facilities Wood/metal shop 10 0.18 20 2 No
Food and Beverage Bars, cocktail lounges 7.5 0.18 100 2 No
Food and Beverage Cafeteria/fast-food dining 7.5 0.18 100 2 No
Food and Beverage Kitchen (cooking) 7.5 0.18 20 2 No
Food and Beverage Restaurant dining rooms 7.5 0.18 70 2 No
Private Dwellings Toilet rooms - private 0 0 0 0
Offices Conference rooms 5 0.06 50 1 Yes
Offices Main entry lobbies 5 0.06 10 1 Yes
Offices Office spaces 5 0.06 5 1 Yes
Offices Reception areas 5 0.06 30 1 Yes
Offices Telephone/data entry 5 0.06 60 1 Yes
Public spaces Corridors 0 0.06 0
Public spaces Shower room 0 0 0
Public spaces Toilet rooms - public 0 0 0
Public Assembly Spaces Auditorium seating area 5 0.06 150 1 Yes
Public Assembly Spaces Libraries 5 0.12 10 1 No
Public Assembly Spaces Toilet rooms - public 0 0 0
Sports and Entertainment Bowling alley (seating) 10 0.12 40 1 No
Sports and Entertainment Disco/dance floors 20 0.06 100 2 Yes
Sports and Entertainment Gambling casinos 7.5 0.18 120 1 No
Sports and Entertainment Game arcades 7.5 0.18 20 1 No
Sports and Entertainment Gym, sports arena (play area) 20 0.18 7 2 No
Sports and Entertainment Health club/aerobics room 20 0.06 40 2 No
Sports and Entertainment Health club/weight room 20 0.06 10 2 No
Sports and Entertainment Spectator areas 7.5 0.06 150 1 Yes
Sports and Entertainment Stages, studios 10 0.06 70 1 Yes
Sports and Entertainment Swimming (pool and deck) 0 0.48 0 2 No
Minimum Exhaust Rates
Occupancy Classification Category CFM/fixture CFM/SF Comments
Educational Facilities Toilet rooms - public 50 0 20
Educational Facilities Toilet rooms - private 25 0
Educational Facilities Shower rooms 20 0
Educational Facilities Sports locker rooms 0 0.5