This package of construction documents outlines the scope of work for a renovation project at the U.S. Department of the Treasury to support the new Committee on Foreign Investment in the United States (CFIUS). The project involves renovations to the fifth floor of the Treasury building for Phase 2 and Phase 4A. Key aspects of the project include demolishing and removing existing partitions, doors, ceilings and flooring; installing new walls, doors, ceilings, flooring and finishes; and modifying mechanical, electrical and telecommunications systems. Detailed specifications and schedules are provided for various construction elements and systems. The documents provide guidance on compliance with applicable codes and standards and ensure that all work is completed to a high quality standard.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3 4 5
2 3 4 5
A
B
C
D
FEDERAL OFFICE BUILDING
WASHINGTON DC
DRAWING INDEX
5TH FLOOR MIDDLE & SOUTH-COURTYARD WINGS INTERIOR RENOVATION
GENERAL CONDITIONS
1. OMISSIONS FROM THE DRAWINGS OR SPECIFICATIONS OF THE DESCRIPTION OF DETAILS OF WORK WHICH ARE
MANIFESTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS OR ARE CUSTOMARILY
PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MIS-DESCRIBED DETAILS OF
WORK BUT SHALL BE PERFORMED AS IF FULLY AND CORRECTLY SET FROM AND DESCRIBED IN THE DRAWINGS AND
SPECIFICATION
2. MANUFACTURER SPECIFIED WITHIN THE CONSTRUCTION DOCUMENTS ARE PROVIDED AS A MINIMUM PERFORMANCE
CRITERIA, SUBSTITUTIONS WILL BE CONSIDERED IF COMPLAINT TO THE PERFORMANCE ESTABLISHED BY THE
MANUFACTURER NOTED. BUILDING MATERIALS SUBSTANDARD TO THESE REQUIREMENTS WILL BE SUMMARILY REJECTED.
ALL BUILDING COMPONENTS ARE TO BE HEAVY DUTY QUALITY AND BE FOR ABUSIVE RESISTANCE INSTALLATION. BUILDING
COMPONENTS SPECIFIED HEREIN THAT DO NOT MEET THE HEAVY DUTY-ABUSIVE ENVIRONMENTAL CRITERIA MUST BE
BROUGHT TO THE ATTENTION OF THE BUILDING REPRESENTATIVE AND WILL BE RE-SPECIFIED
3. BY THE SUBMISSION OF A BID, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE AND HAS FAMILIARIZED
HIMSELF/HERSELF WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED
4. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS AND/OR SIZE. VERIFY ALL DIMENSIONS BEFORE PROCEEDING AND
OBTAIN MEASUREMENTS AT THE JOB FOR ALL WORK REQUIRED TO BE ACCURATELY FITTED TO THE BUILDING. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURACY OF ALL SUCH MEASUREMENTS AND FOR THE PRECISE FITTING
OF THE WORK
5. IF CONFLICTS ARE DISCOVERED AT ANY TIME BETWEEN THE ENGINEERING AND ARCHITECTURAL DRAWINGS, THE COR
SHALL BE CONTACTED AT ONCE TO RESOLVE THE PROBLEM. IF THE COR IS NOT CONTACTED, THE CONTRACTOR SHALL
ACCEPT THE RESPONSIBILITY TO CORRECT ANY AND ALL SUCH WORK NOT IN A COORDINATE WITH THE ARCHITECTURAL
DRAWINGS
6. CHANGES TO THE DRAWINGS (ADDITIONS, DELETIONS OR ALTERATIONS) THAT MIGHT CONSTITUTE A CHANGE ORDER
MUST BE SUBMITTED IN WRITING TO THE COR FOR APPROVAL, OTHERWISE CONTRACTOR WOULD UNDERTAKE SUCH
WORK AT HIS OWN RISK AND WORK MIGHT HAVE TO BE REVERSED AT CONTRACTOR'S OWN COST
7. IF CONTRACTOR THINKS MATERIAL IS SALVAGEABLE ASK COR IS SHOULD BE TURNED OVER TO TREASURY OR DISPOSED OF
8. THE G. C. AND ALL SUB-CONTRACTOR SHALL SUBMIT TO COR SUBMITTALS AND SHOP DRAWINGS FOR REVIEW PRIOR TO
START OF CONSTRUCTION.
9. UPON COMPLETION OF THE INSTALLATION, REMOVE ALL DEBRIS FROM THE BUILDING CREATED BY THE WORK PROVIDED
UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. REMOVE ANY SOILED SPOTS FROM THE FACE OF THE CARPET OR
OTHER FINISH SURFACES USING PROCESSES RECOMMENDED BY THE MANUFACTURER AND IN A MANNER ACCEPTABLE TO
THE GOVERNMENT. REPLACE ANY AREAS OF CARPET OR FINISH SURFACES WHERE CLEANING HAS FAIL TO RESTORE THE
APPEARANCE AND QUALITY SATISFACTORILY, AS DETERMINED BY THE GOVERNMENT.
10. ALL CONTRACTORS SHALL PERFORM ALL WORK IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS.
11. THE G. C. SHALL VERIFY REQUIREMENTS FOR ALL EQUIPMENT INDICATED ON THE DRAWINGS WHETHER SUPPLIED BY THE
GOVERNMENT OR SUB-CONTRACTOR.
12. WHERE THE G. C. IS INSTRUCTED TO ALIGN A PARTITION WITH TWO OR MORE COLUMNS AND THE COLUMNS ARE
DISCOVERED TO BE OF UNEQUAL SIZE, THE LARGER OF THE COLUMNS SHALL DETERMINE THE LOCATION OF THE
PARTITION. THIS WILL ALSO APPLY TO WET COLUMNS AND CORE WALLS.
13. THE G. C. SHALL REPAIR ALL DAMAGE CAUSED BY HIM OR HIS SUB-CONTRACTORS DURING CONSTRUCTION.
PRE-EXISTING DAMAGE MUST BE REVIEWED AND ACKNOWLEDGED, IN WRITING BY THE GOVERNMENT AND ARCHITECT
PRIOR TO COMMENCEMENT OF WORK. DAMAGE NOT DOCUMENTED PRIOR TO CONSTRUCTION START SHALL BE REPAIRED
TO LIKE NEW CONDITION WITHOUT ADDITIONAL CHARGE TO THE GOVERNMENT.
14. THE G. C. SHALL ENSURE THAT ALL PAINT HAS BEEN REMOVED FROM ALL NON-SCHEDULE PAINTED SURFACES PRIOR TO
DELIVERY OF THE SPACE.
15. THE G. C. SHALL COORDINATE ALL WORK WITH FIELD CONDITIONS AND ALL OTHER TRADES INVOLVED AS REQUIRED
16. IF THERE IS A QUESTION AS TO THE ACCEPTABLE LEVEL OF QUALITY FOR THE INSTALLATION OF ANY MATERIALS, THE COR
DECISION WILL BE FINAL
17. NEW DOOR HARDWARE, INCLUDING HINGES AND LOCK SETS, ARE TO BE MOUNTED AT ABA HEIGHTS UNLESS NOTED
OTHERWISE
18. ALL CEILING REGISTERS, GRILLES, VENTS AND DIFFUSERS SHALL BE FACTORY FINISHED. IF PAINTING IS REQUIRED, PROVIDE ENAMEL FINISH
19. ALL J-BENDS AND OTHER GYPSUM METAL TRIM SHALL BE SPACKLE-BLENDED INTO THE ADJACENT SURFACE.
20. WHERE TWO OR MORE WALL SWITCHES OR DIMMERS OCCUR IN THE SAME LOCATION, THEY ARE TO RECEIVE A COMMON
GANG PLATE WHOSE FINISH IS TO MATCH THE BUILDING STANDARD SWITCH PLATE.
21. ALL PAINTED WALLS SHALL BE HAVE A LEVEL 4 FINISH: WITH ONE ROLLER-APPLIED (1) PRIMER COAT AND (2)
ROLLER-APPLIED FINISH COATS.
22. PROVIDE THRESHOLDS AT ALL DOORS AND TRANSITION STRIPS WHERE CARPET MEETS A DIFFERENT TYPE OF FLOORING
23. REVIEW THE SPECIFICATIONS AND CUT SHEETS FOR ACCESSORIES, FIXTURES, ETC. THAT ACCOMPANY THE DRAWING SET
PRIOR TO PLACING ORDERS. IF CONFLICTS ARE FOUND, INFORM THE COR OF SUCH FINDINGS AND TAKE NO ACTION
UNTIL RESOLVED. IN THOSE CASES, IF AN ORDER FOR AN UNRESOLVED ITEM IS PLACED WITHOUT APPROVAL OF COR, THE CONTRACTOR ASSUMES ALL RESPONSIBILITY IF THE ITEM IS NOT ACCEPTED BY THE CLIENT
N
ABBREVIATIONS
G - 001
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
CE
RT
IFI
CA
TIO
NS
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
WASHINGTON DC
CRAIG GARDNER
07/22/2018
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
FEDERAL OFFICE BUILDING 5TH FLOOR
NEW OFFICE SPACE
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
COVER PAGE
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
GENERAL
ARCHITECTURAL
G-001 COVER SHEET 01 OF 46
AD 101 EXISTING / DEMOLITION FLOOR PLAN 02 OF 46
AD 102 EXISTING / DEMOLITION RCP 03 OF 46
AD 103 EXTG / DEMO/ FILL IN FLOOR PANELS 04 OF 46
A-101 PROPOSED FLOOR PLAN 05 OF 46
A-102 PROPOSED FLOOR PLAN 06 OF 46
A-103 PROPOSED FLOOR SYSTEM 07 OF 46
A-104 PROPOSED FLOOR PLAN W/ FURNITURE 08 OF 46
A-105 PROPOSED FLOOR SYSTEM &FURNITURE 09 OF 46
A-106 PROPOSED RCP 10 OF 46
A-301 WALL TYPE A & B 11 OF 46
A-302 WALL TYPE C & D 12 OF 46
A-303 WALL TYPE E & F 13 OF 46
A-501 FLOOR SYSTEM DETAILS 14 OF 46
A-502 STC-50 DOOR DETAILS DETAILS 15 OF 46
A-601 FINISHES NOTES + ROOM FINISHES 16 OF 46
A-602 FINISHES SCHEDULE 17 OF 46
A-603 DOOR SCHEDULE 18 OF 46
A-604 HARDWARE SCHEDULE 19 OF 46
AND DOOR ELEVATIONS
A-605 SIGNAGE 20 OF 46
FIRE PROTECTION
AC
ACT
ADJ
AFF
A&G
ANCH
APPROX
ARCH
ATT
A/V
B & B
BD
BET
BF
BIT
BLDG
BLKG
BM
BTM
CER
CEM
CL
CLG
CMU
COMP
CONC
CONT
D
DEMO
DET
DIA
DIM
DN
DWG
EA
EJ
ELEC
ELEV
EQ
EXT
EXTG
F&I
FIN
FF
FLASH
FLR
FOF
FURR
FV
FXC
GA
GALV
GC
GL
GR
GWB
HDWR
HM
HORIZ
HP
HT
HVAC
IBC
ID
INCL
INSUL
JT
L
LBP
LP
LW
AT
ACOUSTIC
ACOUSTIC CEILING TILE
ADJUSTABLE
ABOVE FINISHED FLOOR
ALUMINUM & GLASS
ANCHOR
APPROXIMATE
ARCHITECTURAL
ATTENUATION
AUDIO VISUAL
BALLED AND BAGGED
BOARD
BETWEEN
BARRIER FREE
BITUMINOUS
BUILDING
BLOCKING
BEAM
BOTTOM
CERAMIC
CEMENT
CENTER LINE
CEILING
CONCRETE MASONRY
UNIT
COMPRESSIBLE
CONCRETE
CONTINUOUS
DEEP
DEMOLITION
DETAIL
DIAMETER
DIMENSION
DOWN
DRAWING
EACH
EXPANSION JOINT
ELECTRICAL
ELEVATION
EQUAL
EXTERIOR
EXISTING
FURNISH AND INSTALL
FINISH(ED)
FINISHED FLOOR
FLASHING
FLOOR
FACE OF FINISH
FURRING
FIELD VERIFY
FIRE EXTING. & CABINET
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GLASS
GRADE
GYPSUM WALLBOARD
HARDWARE
HOLLOW METAL
HORIZONTAL
HIGH POINT
HEIGHT
HEATING, VENTILATING
AND AIR CONDITIONING
INTERNAT. BLDG. CODE
INSIDE DIAMETER
INCLUDING
INSULATION
JOINT
RIGHT ANGLE
LEAD BASED PAINT
LOW POINT
LIGHT WEIGHT
MAT
MAX
MECH
MEMB
MEP
MIN
MISC
MNTD
MSD
MTL
N/A
NIC
NOM
NFPA
O.C.
O.D.
O.H.
OZ.
PAF
PLY
PR
PT
PTD
PR
QTY
RCP
RECEP
REINF
REQ'D
REV
RM
RO
SCHED
SCW
SECT
SF
SHT
SIM
SPEC
SQ
STC
STL
SS
STRL
TEL
THK
TOC
TOS
TYP
MATERIAL
MAXIMUM
MECHANICAL
MEMBRANE
MECH., ELECT. & PLUMBING
MINIMUM
MISCELLANEOUS
MOUNTED
MATERIAL SAFETY DATA SHT.
METAL
NOT APPLICABLE
NOT IN CONTRACT
NOMINAL
NATIONAL FIRE PROTECTION
ASSOCIATION
ON CENTER
OUTSIDE DIAMETER
OVERHEAD OR OVERHANG
OUNCE
PRESS. AIR FASTENER
PLYWOOD
PAIR
PRESSURE TREATED
PAINTED
PAIR
QUANTITY
REFLECTED CEILING PLAN
RECEPTACLE
REINFORCED
REQUIRED
REVISION
ROOM
ROUGH OPENING
SCHEDULE
SOLID CORE WOOD
SECTION
SQUARE FEET
SHEET
SIMILAR
SPECIFIED
SQUARE
SOUND TRANS. CLASS
STEEL
STAINLESS STEEL
STRUCTURAL
TELEPHONE
THICKNESS
TOP OF CONCRETE
TOP OF SLAB
TYPICAL
UNFIN
UON
VERT
VIF
VP
W.
W/
W/O
WD
UNFINISHED
UNLESS OTHERWISE NOTED
VERTICAL
VERIFY IN FIELD
VENEER PLASTER
WIDE
WITH
WITHOUT
WOOD
F001 SYMBOLS & ABBREVIATIONS 21 OF 57
FD101 DEMOLITION FIRE ALARM 22 OF 46
FD102 DEMOLITION FIRE PROTECTION 23 OF 46
F-101 PROPOSED FIRE ALARM 24 OF 46
F-102 PROPOSED FIRE PROTECTION 25 OF 46
M-001 SYMBOLS, ABBREVIATIONS & SECTION 26 OF 46
MD101 DEMOLITION MECHANICAL 27 OF 46
M-101 PROPOSED MECHANICAL 28 OF 46
M-501 MECHANICAL DETAILS 29 OF 46
M-601 MECHANICAL SCHEDULES 30 OF 46
M-701 MECHANICAL CONTROLS 31 OF 46
M-702 MECHANICAL CONTROLS 32 OF 46
E-001 SYMBOLS & ABBREVIATIONS 33 OF 46
ED101 DEMOLITION LIGHTING 34 OF 46
ED102 DEMOLITION POWER 35 OF 46
TD101 DEMOLITION TELECOM 36 OF 46
E-101 PROPOSED LIGHTING 37 OF 46
E-102 PROPOSED POWER 38 OF 46
E-102 PROPOSED POWER 39 OF 46
T-101 PROPOSED TELECOM 40 OF 46
E-501 DETAILS 41 OF 46
E-601 SCHEDULES 42 OF 46
T-104 LAN ROOM 43 OF 46
T-105 RFP TELECOM 44 OF 46
T-106 RFP TELECOM 45 OF 46
T-106 PRICING TELECOM EQUIPMENT 46 OF 46
MECHANICAL
ELECTRICAL
SYMBOLS
ALIGN
ALIGN SURFACES
CENTER LINE
X
GENERAL / KEYED NOTE
DEMOLITION NOTE
ROOM NAME
ROOM NUMBER
L
C
XXX
XXX
XX
EXTG WALL TO BE REMOVED
X
PARTITION TYPE
EXTG WALL TO REMAIN
NEW PARTITION
X
DRAWING
REVISION NUMBER
NEW DOOR ASSEMBLY
X X
X X
EXTG DOOR ASSEMBLY
X
X
X
X
FEDERAL OFFICE BUILDING
INTERIOR SPACE RENOVATION
D O W N
D O W N
NW
NE
N
KEY PLAN
MIDDLE
PROJECT AREA
PROJECT AREA
S
SOUTH COURTYARD
SW SE
NORTH COURTYARD
EV 503
5224 A
5225 B
5225 A
C5200 B
C5200 A
5204 A
ST 5B
OPEN OFFICE AREA
ELEV + 0'-4"
CORRIDOR
COPY ROOM
OPEN OFFICE AREA
OPEN OFFICE AREA
OPEN OFFICE AREA
ELEV + 0'-4"
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
OFFICE
1 4
1 4
3 4
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E C B
16'-4" 16'-4" 16'-4"
A
16'-4"
D
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
C
L
C
L
C
L
C
L
C
L
107'-3"
77'-9
5 8
C
L
UP UP
ELEV + 0'-4"
ELEV + 0'-0"
ELEV + 0'-0"
ELEV + 0'-4"
5221 A
ELEV + 0'-4"
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C5300 B
ST 5A
OFFICE
ELEV + 0'-2"
OPEN OFFICE AREA
ELEV + 0'-2"
5313 M
OFFICE
ELEV + 0'-2"
5313 N
OFFICE
ELEV + 0'-2"
5313 O
HISTORIC CORRIDOR
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
116'-7
A
B
C
D
E
F
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
ELEV + 0'-0"
UP UP UP UP UP UP
1 2
1'-4"
1'-4"
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
AD - 101
1/8"= 1'-0"
0 4'
8'
16'
2'
EXISTING & DEMO FLOOR PLAN
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO
PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICA-
TIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM
NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR
THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S
SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK.
THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL
WORK RELATED TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE.
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF THE COR
9. EXISTING SYSTEMS FURNITURE AND EQUIPMENT TO BE REMOVED BY G.C.
NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT
INTRODUCING DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS
MUST BE REINSTALLED AT END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
DEMOLITION NOTES
1 DEMOLISH EXISTING PARTITION / WALL AS DEPICTED
REMOVE AND DISPOSE OF DOOR, FRAME, CASING & HARDWARE. TREASURY TO REMOVE
ONLY THE USSS CYLINDER IN THE DOOR LOCK (IF ANY) BEFORE THE CONTRACTOR DISPOSE
OF THE DOOR
DEMOLISH EXISTING SUSPENDED CEILING GRID, ACT & LIGHT FIXTURES
DEMOLISH EXISTING CARPET
EXISTING FURNITURE & OFFICE EQUIPMENT TO BE REMOVED GENERAL CONTRACTOR
DEMOLISH ELECTRICAL OUTLETS & SWITCHES, AND CABLING AS PER ELECTRICAL DRAWINGS
REMOVE RAMP
CAST IRON COLUMN TO BE PROTECTED DURING CONSTRUCTION
PROTECT MILLWORK DURING CONSTRUCTION
KEYED NOTES
EXISTING WALL TO REMAIN. PREPARE EXTANT WALLS TO BE REFINISHED
ALL EXTANT MILLWORK TO REMAIN. PREPARE TO BE REFINISHED
EXISTING DOOR TO REMAIN IN A PERMANENTLY CLOSED POSITION
EXTANT HISTORIC DOOR LEAVES, FRAMES AND TRANSOMS TO BE PREPARED TO
BE REFINISHED
PREPARE EXTANT CAST IRON COLUMNS TO BE REFINISHED
FCUs / DUCT WORK TO REMAIN. MODIFICATIONS AS PER MECHANICAL DRAWINGS
FIRE PROTECTION SYSTEM TO REMAIN. MODIFICATIONS AS PER FIRE PROTECTION DRAWINGS
POWER SYSTEM TO REMAIN. MODIFICATIONS AS PER ELECTRICAL DRAWINGS
REPAIR MILLWORK WHERE WALLS HAVE BEEN REMOVED
EXISTING WALLS TO REMAIN
X
X
X
A
EXISTING DOORS WITHIN THE AREA OF WORK TO REMAIN
EXISTING DOORS OUTSIDE THE AREA OF WORK TO REMAIN
NOT IN THE SCOPE OF WORK
EXISTING WALLS TO BE DEMOLISHED
EXISTING DOORS WITHIN THE AREA OF WORK TO BE REMOVED
ALTERATIONS AS PER KEY NOTES
N O R T H C O U R T Y A R D
MIDDLE WING EXISTING AND DEMOLITION FLOOR PLAN
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
SOUTH WING COURTYARD EXISTING AND DEMOLITION FLOOR PLAN
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
LEGEND
2 2
1 1
2 2
88 8 8
TYP
3 3 3 3
44 4 4 44
5 5 5 5
TYP
TYP
9 9 9
9 9
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
CEILING 9'-6"
CEILING 9'-6"
RAISED PERIMETER CEILING AREA CLEARS WINDOWS / WINDOW OPENINGS EA @ ± 6'-2" (H) X ± 2'-9" (W)
RAISED PERIMETER CEILING AREA CLEARS WINDOWS / WINDOW OPENINGS EA @ ± 6'-2" (H) X ± 2'-9" (W)
IDS IDS
C CCC
IDS
IDS IDS IDS IDS
W
F
W
W
F
CEILING 7'-11"CEILING 9'-5"
RAISED PERIMETER CEILING AREA CLEARS WINDOWS
WINDOW OPENINGS EA @ ± 7'-10" (H) X ± 42" (W) / SILL @ 39
" AFF
OS OCCUPANCY SENSOR (CEILING MOUNTED) TO BE DEMOLISHED
2' x 2' LIGHT FIXTURE TO BE DEMOLISHED
SINGLE FACE EXIT SIGN TO BE DEMOLISHED
EXISTING CEILING MOUNTED FIRE ALARM COMBINATION
STROBE / HORN
EXISTING SPRINKLER HEAD TO REMAIN
2' x 2' EMERGENCY LIGHT FIXTURE TO BE DEMOLISHED
PERFORATED CEILING PANEL, 24" x 24" TO BE DEMOLISHED
SUPPLY AIR DIFFUSER, 24" x 24" TO BE DEMOLISHED
CEILING MOUNTED FIRE ALARM STROBE
SMOKE DETECTOR TO BE DEMOLISHED
MNT
EXISTING 24"x 24" ACT AND GRID TO BE DEMOLISHED
AD - 102
1/8"= 1'-0"
0 4'
8'
16'
2'
EXISTING & DEMO REFLECTED CEILING PLAN
FIRE SUPPRESSION SYSTEM TO REMAIN. PROTECT SPRINKLER HEADS DURING
CONSTRUCTION
N O R T H C O U R T Y A R D MIDDLE WING
SOUTH WING COURTYARD
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
MIDDLE WING EXISTING AND DEMOLITION REFLECTED CEILING PLAN
C-1
1/8" = 1'-0"
SOUTH WING COURTYARD EXISTING & DEMOLITION REFLECTED CEILING PLAN
A-1
1/8" = 1'-0"
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO
PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICA-
TIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM
NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR
THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S
SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK.
THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL
WORK RELATED TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE.
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF THE COR
9. EXISTING SYSTEMS FURNITURE AND EQUIPMENT TO BE REMOVED BY G.C.
NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT
INTRODUCING DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS
MUST BE REINSTALLED AT END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
DEMOLITION NOTES
1 DEMOLISH EXISTING SUSPENDED CEILING GRID, ACT & LIGHT FIXTURES
2 DEMOLISH AIR SUPPLY COVERS. SEAL OPEN DUCTWORK TO PREVENT INTRODUCING DUST
INTO THE SYSTEM
KEYED NOTES
LEGEND
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
FLOOR PANEL LOCATION IS APPROXIMATE LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
ELEV+ 0'-0"
ELEV + 0'-4"
UP
ELEV + 0'-0"
ELEV + 0'-4"
RAMP
ELEV + 0'-4"
RAISED FLOOR 9" DEEP
RAISED FLOOR 9" DEEP
C5300 B
HISTORIC CORRIDOR
ELEV + 0'-0"
ELEV + 0'-2"
UP UP UP UP UP
UP
FLOOR PANEL LOCATION IS APPROXIMATE. LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
RAISED FLOOR 6" HIGH ( 4" BELOW HISTORIC CORRIDOR FF & 2" ABOVE HISTORIC CORRIDOR FF)
AD - 103
1/8"= 1'-0"
0 4'
8'
16'
2'
EXISTING & DEMO FLOORING SYSTEM PLAN
BARE CC/AS PANEL
POSILOCK SCREW
POSILOCK HEAD
THREAD STUD
LEVELING NUT
STEEL PEDESTAL
TUBE
STEEL BASE
PLATE
TYPICAL SECTION AT FIELD
NTS
A-4
AFTER EXISTING WALLS ARE REMOVED, NEW FLOOR PANELS MUST BE INSTALLED OR
EXISTING RECONFIGURED IN THE SURROUNDING AREAS TO INFILL AS NEEDED. SEE A-103
LOCATION OF NEW WALLS
EXISTING WALLS TO REMAIN
NOT IN THE SCOPE OF WORK
UNEXCAVATED FLOOR / ELEV 0'-0"
N O R T H C O U R T Y A R D MIDDLE WING
SOUTH WING COURTYARD
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
MIDDLE WING EXISTING AND DEMOLITION OF FLOOR PANELS
C-1
1/8" = 1'-0"
SOUTH WING COURTYARD EXISTING & DEMOLITION OF FLOOR PANELS
A-1
1/8" = 1'-0"
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC
DEMOLITION WAS CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE
ENCOUNTERED BETWEEN ACTUAL CONDITIONS AND DRAWINGS. INFORM COR PRIOR TO
PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS AND SPECIFICA-
TIONS, THE MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM
NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR
THE COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S
SCOPE OF WORK
7. THE CONTRACTOR SHALL CLEAN UP ALL ACTIVE WORK AREAS AFTER EACH DAY’S WORK.
THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND PROPER DISPOSAL OF ALL
WORK RELATED TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE.
ALL DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH
EXISTING AND TO THE SATISFACTION AND APPROVAL OF THE COR
9. EXISTING SYSTEMS FURNITURE AND EQUIPMENT TO BE REMOVED BY G.C.
NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT
INTRODUCING DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS
MUST BE REINSTALLED AT END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
KEYED NOTES
LEGEND
EXISTING 9" TATE FLOOR PANELS CONCORE / ALL STEEL POSILOCK SYSTEM OR ALL STEEL
STRINGER SYSTEM TO REMAIN. TOP OF FINISH FLOOR IS INSTALLED AT 0'-4" AFF
REMOVE 9" IRVINE - TATE FLOOR PANELS FROM AREAS WHERE NEW WALLS ARE TO BE BUILT
FILL IN WITH NEW 6" TATE FLOOR PANELS TO MATCH EXISTING 9" SYSTEM WHERE WALLS
WERE REMOVE AS NEEDED. TOP OF FINISH FLOOR TO BE INSTALLED AT 0'-2" AFF
REMOVE TATE FLOOR PANEL SYSTEM AND EXISTING RAMP PORTION. INSTALL NEW ± 5"
IRVINE-TATE CONCORE / ALL STEEL 24"X 24" FLOOR PANEL SYSTEM, TOP OF FINISH FLOOR IN
THIS AREA TO BE SET ELEVATION TO BE 0'-0"
EXISTING 6" TATE FLOOR PANELS CONCORE / ALL STEEL POSILOCK SYSTEM OR ALL STEEL
STRINGER SYSTEM TO REMAIN. TOP OF FINISH FLOOR IS INSTALLED AT 0'-4" AFF
REMOVE 6" IRVINE - TATE FLOOR PANELS FROM AREAS WHERE NEW WALLS ARE TO BE BUILT
FILL IN WITH NEW 6" TATE FLOOR PANELS TO MATCH EXISTING 9" SYSTEM WHERE WALLS
WERE REMOVE AS NEEDED. TOP OF FINISH FLOOR TO BE INSTALLED AT 0'-2" AFF
REMOVE TATE FLOOR PANEL TO INSTALL NEW RAMP AS PER DETAIL
REMOVE AND RECONFIGURE IRVINE-TATE CONCORE / ALL STEEL 24"x 24" FLOOR PANEL
SYSTEM TO ALLOW FOR NEW WALLS' INSTALLATION
EXISTING WALLS TO BE REMOVED
EXISTING IRVINE-TATE CONCORE /
ALL STEEL 24"x 24" FLOOR PANEL
SYSTEM TO REMAIN UNALTERED
EXISTING IRVINE-TATE CONCORE / ALL
STEEL 24"X 24" FLOOR PANEL SYSTEM
TO BE REMOVED TO INSTALL RAMP
REMOVE IRVINE-TATE CONCORE / ALL STEEL 24"X 24" FLOOR PANEL SYSTEM AND EXISTING
RAMP PORTION. INSTALL ± 5" IRVINE-TATE CONCORE / ALL STEEL 24"X 24" FLOOR PANEL
SYSTEM FOR TOP of FINISH FLOOR ELEVATION TO BE 0'-0"
6 7
6 6
3 3 3
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
C5300 B
ST 5A
HISTORIC CORRIDOR
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
5313 F 5313 E 5313 D 5313 C
3'-3"
R.O.
1'-0
5'-9"
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
R.O.
3'-2"
4'-0"
R O
OFFICE
VESTIBULE
5313 A
OFFICE
ELEV ± 0'-2"
OFFICE
OFFICE
53219
OFFICE
OFFICE
CONFERENCE ROOM
1 4
6'-0"
1 2
13'-2"
23'-9
10'-11
" 10'-9" 10'-8" 10'-8" 10'-9"
UP UP
7'-5
8'-1
7'-1" 7'-1"
7'-8
14'-8
1 2
7'-6
A
A
A
A
A
A
5316-A
5 8
7'-3
1 2
2'-2
1 8
5322-A
ELEV 0'-0"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
RECEPTION
ELEV ± 0'-2"
CORRIDOR
5313 B
ELEV ± 0'-2"
STORAGE
ELEV ± 0'-2"
3'-4
7'-2
1'-4
" 1'-4
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
EV 503
5224 A
5225 B
5225 A
C5200 B
ST 5B
COPY ROOM
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
RAISED FLOOR 9" DEEP
C5200
OPEN OFFICE AREA
CORRIDOR
EXIT
ENTRY / EXIT
VESTIBULE
5'-1
5'-9
1 2
R O
R O
10'-7
R O
11'-9
3 4
3 4
5 8
1 2
7 8
OFFICE
OFFICE
TELECOM
ELEV ± 0'-4"
R O
R O
R O
10'-5
5 8
OFFICE
OFFICE
11'-0"
6'-4
3 4
7 8
2'-2
95'-10"
5'-7
1 2
1 2
7 8
7 8
E C B
16'-4" 16'-4" 16'-4"
A
16'-4"
D
15 16 17 18 19 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14
21 22 23 24 25 26 27 28 29 30 31 32
1 2
C
L
C
L
C
L
C
L
C
L
C
L
4'-3"
R O
5202-A
R O
9'-4" 6'-1
3 4
7'-4
1 4
6'-0"
DN
ELEV + 0'-4"
DN
5207-A
5208-A
5206-A
5211-A
5210-A
5209-A
5205-A
UP
UP
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV 0'-0"
ELEV 0'-0"
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
5 8
ELEV ± 0'-4"
ELEV ± 0'-4"
1/8"= 1'-0"
0 4'
8'
16'
2'
PROPOSED FLOOR PLAN
EXISTING WALLS, DOORS ASSEMBLIES AND CASING, WINDOW ASSEMBLIES, TRIM, MILLWORK & FCUs
ALONG FENESTRATION WALLS AND CAST IRON COLUMNS TO BE PREPARED AND PAINTED AS PER
FINISHES SCHEDULE.
NEW STC-50 WALL TO EXTEND FROM T. O. SLAB (TRUE FLOOR) TO UNDERSIDE OF FLOOR PLATE (TRUE
CEILING) IN COMPLIANCE W/ STC-50 REQUIREMENT (ICD/ICS 705 IN COMPLIANCE W/ UFC 1-200-01/ STC 50
SOUND GROUP 4 OR BETTER). PROVIDE A CONTINUOUS BEAD OF ACOUSTICAL CAULK AT ALL I NTER-
SECTIONS W/ OTHER SURFACES (HORIZONTAL OR VERTICAL, BOTH SIDES). WALL MUST BE UNIFORMLY
FINISHED ON BOTH SIDES, FROM FLOOR SLAB (TRUE FLOOR) TO UNDER- SIDE OF FLOOR PLATE (TRUE
CEILING). WHERE STC-50 WALL ABUTS EXISTING WALL, CUT BACK EXISTING BASEBOARD AS NEEDED
AFTER DEMOLITION IS COMPLETED, ENTIRE SPACE, INCLUDING CEILING, MUST MAINTAIN FIRE RATING
AS PER SPECS (1-HR GENERAL AND 2-HR STRUCTURAL MEMBERS) FILL ALL HOLES IN CEILING (PLASTER
AND TERRACOTTA) W/ CLOSED CELL,NON EXPANDING FIREPROOFING FOAM. TROWEL FOAM SMOOTH
AFTER APPLICATION
ALL NEW NON STC-50 WALLS TO BE CONSTRUCTED AS PER WALL TYPES W/ 3 5/8" 16 GA STEEL STUDS, EXTEND WALL FRAMING FULL HEIGHT. FINISH WALLS AS PER FINISHES SCHEDULE
STC-50 ENTRY/EXIT: PROVIDE NEW 1 3/4" STC-50LEVEL 3 ACOUSTIC WOOD DOOR & STEEL FRAME W/ X10
LOCK (
GENERAL CONTRACTOR TO FURNISH AND INSTALL DOOR, X10 LOCK, AND CONDUIT REQUIRED
FOR BMS, IDS OR ACD, SEE A-602) . HARDWARE MUST MEET FEDERAL SPECIFICATION FF-L-2740 / UL 2050
EXISTING DOOR ASSEMBLY & CASING TO REMAIN AS IS. PREP AND PAINT AS PER FINISHES SCHEDULE
EXISTING DOOR ASSEMBLY & CASING TO REMAIN IN A PERMANENTLY CLOSED POSITION.
PROVIDE NEW 1 3/4" STC-50 ACOUSTIC WOOD DOOR & STEEL FRAME. HRDW AS PER SCHEDULES
EXTERIOR GLAZING TREATMENT ALL WINDOWS: RF SHIELDING ONLY ON EXTERIOR GLAZING W/
SECURITY WINDOW INSERTS WHICH ARE AS FOLLOWS:
INSTALL ALUMINUM FRAMED INSERTS WITH ETCHED (TRANSLUCENT) GLASS, 1/4" LAMINATED. INSTALL
1-1/2” PAINTED (STANDARD WHITE) ALUMINUM TUBING AT EACH WINDOW HEAD AND JAMB. NEW GLAZING
WILL ATTACH USING PROTECTIVE-MAGNETIC-ONE LITE, OR SIMILAR ATTACHMENT SYSTEM.
INSTALL THE NEW GLAZING SYSTEMS TO THE INTERIOR AS OUTLINED IN “SECURE INSERT WINDOW
DETAIL”. PROVIDE RADIO FREQUENCY (RF) SHIELDING TO ALL SECURE INSERT WINDOWS. ACCEPTABLE
RF SHIELDING MANUFACTURERS ARE:
A) RFOIL;
B) TECH-ETCH EMI/RFI SHIELDING;
C) TITAN STEEL CORPORATION OR EQUAL.
SECURED WINDOW INSERTS SHOULD BE “SD 250/2510 TECH SPEC” PRODUCT DATA TRANSLUCENT BUT
OPAQUE ALSO. THE TREATMENT IS TO BE BUILT INTO THE INSERT FOR ALL WINDOWS.
REMOVE EXISTING WINDOW SHADES AND DISPOSE OF THEM. PROVIDE AND INSTALL NEW WINDOW
SHADESES AS PER FINISHES SCHEDULE. SUBSTRATE MUST BE EVEN AND LEVEL, CLEAN, FREE OF OLD
GLUE AND FLOORING REMNANTS PRIOR TO NEW CARPET INSTALL.
FURNISH AND INSTALL NEW CARPET TILE
FURNISH AND INSTALL ELECTROSTATIC DISSIPATIVE TILE AS PER FINISHES SCHEDULE
FURNISH AND INSTALL NEW CEILING GRID, ACT AND DIFFUSERS SEE RCP AND MEP DRAWINGS
UNEXCAVATED AREA (ENTIRE SHADED AREA) TOP of ELEVATION SET AT 0'=0"
FLATTEN AREA NEXT TO UNEXCAVATED AREA. SET TOP OF ELEVATION AT 0'=0"
NEW RAMPED FLOOR 3/4 :12. SEE DETAIL
IRVINE-TATE FLOOR SYSTEM TO BE MODIFIED AS NEEDED FOR CONSTRUCTING NEW WALLS & PARTS.
TELECOM (LAN) ROOM REQUIREMENTS ARE AS FOLLOWS:
A. FLOOR TO CEILING ¾” FIRE RETARDANT PLYWOOD ON OUTSIDE OF DRYWALL ON ALL FOUR WALLS.
B. NO CEILING TO BE INSTALLED
C. TREAT/SEAL EXISTING CEILING
REMOVE MILLWORK FOR STC-50 NEW WALL TO MEET EXISTING WALL
PROVIDE SOUND ATTENUATION BLANKETS ABOVE CONFERENCE ROOM CEILING
INSTALL SILENCER OR BAFFLES AT AIR TRANSFER OPENINGS AND/OR AIR GRILLES.
ALL ELECTRICAL AND TELECOM CABLES, AFTER THEY ARE PULLED UP FROM THE FLOOR THEY MUST BE
SURFACE MOUNTED TO PREVENT COMPROMISING THE STC-50 RATING OF THE WALLS.
2 FEEDS PP / CP PER DISTRIBUTION BOX
ROOM STC REQUIREMENTS DUE TO NOISY LOCATION NOT SECURITY REQUIREMENTS
A - 101
N O R T H C O U R T Y A R D
PROPOSED MIDDLE WING FLOOR PLAN
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
PROPOSED SOUTH WING COURTYARD FLOOR PLAN
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN
ACTUAL CONDITIONS & DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS & THE SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SOW
7. THE COR IS RESPONSIBLE FOR THE REMOVAL & PROPER DISPOSAL OF ALL G.C. WORK RELATED
TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND
TO THE SATISFACTION AND APPROVAL OF THE COR
9. NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS MUST BE REINSTALLED AT
END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
KEYED NOTES
1 1 1 1 1 1
6 6 7 7 7 7
8 8 8 8 8
1 1 1
1 1
1 9
1 9
18181818
NEW STC-50 WALLS
EXISTING WALLS TO REMAIN
X
X
X
A
EXISTING DOORS WITHIN THE AREA OF
WORK TO REMAIN
X X
X A
NEW DOOR WITHIN THE AREA OF WORK
NOT IN THE SCOPE OF WORK
LEGEND
EXISTING DOORS OUTSIDE THE
AREA OF WORK TO REMAIN
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
EV 503
5224 A
5225 B
5225 A
C5200 B
ST 5B
COPY ROOM
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
RAISED FLOOR 9" DEEP
C5200
OPEN OFFICE AREA
CORRIDOR
EXIT
ENTRY / EXIT
VESTIBULE
OFFICE
OFFICE
TELECOM
ELEV ± 0'-4"
OFFICE
OFFICE
E C B
16'-4" 16'-4" 16'-4"
A
16'-4"
D
15 16 17 18 19 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14
21 22 23 24 25 26 27 28 29 30 31 32
C
L
C
L
C
L
C
L
C
L
5202-A
DN
ELEV + 0'-4"
DN
5207-A
5208-A
5206-A
5211-A
5210-A
5209-A
5205-A
UP
UP
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV 0'-0"
ELEV 0'-0"
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
C5300 B
ST 5A
HISTORIC CORRIDOR
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
5313 F 5313 E 5313 D 5313 C
OFFICE
VESTIBULE
5313 A
OFFICE
ELEV ± 0'-2"
OFFICE
OFFICE
53219
OFFICE
OFFICE
CONFERENCE ROOM
UP UP
A
A
A
A
A
A
5316-A
5322-A
ELEV 0'-0"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
RECEPTION
ELEV ± 0'-2"
CORRIDOR
5313 B
ELEV ± 0'-2"
STORAGE
ELEV ± 0'-2"
A - 102
1/8"= 1'-0"
0 4'
8'
16'
2'
PROPOSED FLOOR PLAN
N O R T H C O U R T Y A R D
PROPOSED MIDDLE WING FLOOR PLAN INDICATING WALL TYPES & OTHER NOMENCLATURE
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
PROPOSED SOUTH WING COURTYARD FLOOR PLAN INDICATING WALL TYPES & OTHER NOMENCLATURE
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
A2B
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN
ACTUAL CONDITIONS & DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS & THE SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SOW
7. THE COR IS RESPONSIBLE FOR THE REMOVAL & PROPER DISPOSAL OF ALL G.C. WORK RELATED
TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND
TO THE SATISFACTION AND APPROVAL OF THE COR
9. NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS MUST BE REINSTALLED AT
END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
NEW STC-50 WALLS
EXISTING WALLS TO REMAIN
X
X
X
A
EXISTING DOORS WITHIN THE AREA OF
WORK TO REMAIN
X X
X A
NEW DOOR WITHIN THE AREA OF WORK
NOT IN THE SCOPE OF WORK
LEGEND
EXISTING DOORS OUTSIDE THE AREA OF
WORK TO REMAIN
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
C
C
C
C
C
C
C
C C
E
E
C
D
D
F
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
HISTORIC CORRIDOR
ELEV + 0'-0"
ELEV + 0'-2"
UP UP UP UP UP
UP
FLOOR PANEL LOCATION IS APPROXIMATE. LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
RAISED FLOOR 6" HIGH ( 4" BELOW HISTORIC CORRIDOR FF & 2" ABOVE HISTORIC CORRIDOR FF)
FLOOR PANEL LOCATION IS APPROXIMATE LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
ELEV+ 0'-0"
ELEV + 0'-4"
UP
ELEV + 0'-0"
ELEV + 0'-4"
RAMP
ELEV + 0'-4"
RAISED FLOOR 9" DEEP
RAISED FLOOR 9" DEEP
ELEV + 0'-4"
A - 103
1/8"= 1'-0"
0 4'
8'
16'
2'
ALTERATIONS TO FLOOR PANEL SYSTEM
SUPPLEMENTAL SUPPORT FOR HEAVY EQUIPMENT
A-3
NTS
THIS SUPPORT METHOD MUST BE USED FOR CONDITIONS WHERE EQUIPMENT LOADS WILL
BE IN EXCESS OF THE PANEL LOAD RATING.
THIS METHOD ALLOWS THE EQUIPMENT LEGS TO BE LOCATED ANYWHERE ON THE PANELS.
EQUIPMENT THAT RESTS ON RAILS OR THAT HAVE A CONTINUOUS BASE MAY BE SUPPORTED
BY PUTTING SUPPLEMENTAL PEDESTALS AROUND THE EQUIPMENT PERIMETER ON 12"
CENTERS
CARE SHOULD BE TAKEN WHEN MOVING EQUIPMENT INTO PLACE. USE SPREADER PLATES
TO HELP SPREAD THE LOAD OVER THE PANELS DURING MOVE-IN
THIS METHOD CAN BE USED WITH EITHER POSILOCK OR STRINGER UNDERSTRUCTURE
SYSTEMS
N O R T H C O U R T Y A R D
PROPOSED MIDDLE WING FLOOR PANEL SYSTEM ARRANGEMENT
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
PROPOSED SOUTH WING COURTYARD FLOOR PANEL SYSTEM ARRANGEMENT
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN
ACTUAL CONDITIONS & DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS & THE SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SOW
7. THE COR IS RESPONSIBLE FOR THE REMOVAL & PROPER DISPOSAL OF ALL G.C. WORK RELATED
TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND
TO THE SATISFACTION AND APPROVAL OF THE COR
9. NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS MUST BE REINSTALLED AT
END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
POSILOCK OR STRINGER
UNDERSTRUCTURE SYSTEM. TYP
(4) ADDITIONAL PEDESTALS,
SUPPORT BOTTOM OF PANEL
STANDARD TYPE, ADJUSTED TO
EXISTING AND RECONFIGURED IRVINE-TATE CONCORE / ALL
STEEL 24"x 24" FLOOR PANEL SYSTEM. ELEVATION ± 4" OR
± 2" AS NOTED
UNEXCAVATED FLOOR / TATE PANEL SYSTEM ELEV 0'-0"
LEGEND
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
(703) 777-8285 www.meridiengroupllc.com
AFTER EXISTING WALLS ARE REMOVED, NEW FLOOR PANELS
MUST BE INSTALLED OR EXISTING RECONFIGURED IN THE
SURROUNDING AREAS TO INFILL AS NEEDED. SEE A-103
LOCATION OF NEW WALLS
ST 5A
HISTORIC CORRIDOR
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
5313 F 5313 E 5313 D 5313 C
OFFICE
VESTIBULE
5313 A
OFFICE
OFFICE
OFFICE
53219
OFFICE
OFFICE
UP UP
A
A
A
A
A
A
5316-A
5322-A
ELEV 0'-0"
ELEV ± 0'-2"
RECEPTION
CORRIDOR
5313 B
ELEV ± 0'-2"
STORAGE
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
ELEV ± 0'-2"
5313-A
5313-B
3 8
CONFERENCE ROOM
ELEV ± 0'-2"
ELEV ± 0'-2"
Each Workstation will require two full IT Floor boxes (one for unclassed and one for classed cabling). Need one electrical floor box for each work station too.
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
EV 503
5224 A
5225 B
5225 A
C5200 B
ST 5B
COPY ROOM
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
WINDOW OPENINGS EA @ ± 7'-10" (h) x ± 42" (w) / SILL @ 39
" AFF
RAISED FLOOR 9" DEEP
C5200
OPEN OFFICE AREA
CORRIDOR
EXIT
ENTRY / EXIT
VESTIBULE
OFFICE
OFFICE
TELECOM
OFFICE
OFFICE
E C B AD
15 16 17 18 19 20
1 2 3 4 5 6 7 8 9 10 11 12 13 14
21 22 23 24 25 26 27 28 29 30 31 32
C
L
C
L
C
L
C
L
C
L
5202-A
DN
ELEV + 0'-4"
DN
5207-A
5208-A
5206-A
5211-A
5210-A
5209-A
5205-A
UP
UP
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV 0'-0"
ELEV 0'-0"
ELEV ± 0'-4"
ELEV ± 0'-4"
5211-T 5211-U 5211-V 5211-W 5211-X 5211-Y 5211-Z 5211-AA 5211-BB 5211-CC 5211-DD 5211-EE 5211-FF 5211-GG 5211-HH
5'-3"
5211-A 5211-B 5211-C 5211-D
5'-3
5211-E 5211-F 5211-G
5211-N 5211-M 5211-L 5211-K 5211-J 5211-I 5211-H
5211-O 5211-P 5211-Q
5211-R 5211-S
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
ELEV ± 0'-4"
Each Workstation will require two full IT Floor boxes (one for unclassed and one for classed cabling). Need one electrical floor box for each work station too.
A - 104
1/8"= 1'-0"
0 4'
8'
16'
2'
PROPOSED FLOOR PLAN W/ FURNITURE
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN
ACTUAL CONDITIONS & DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS & THE SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SOW
7. THE COR IS RESPONSIBLE FOR THE REMOVAL & PROPER DISPOSAL OF ALL G.C. WORK RELATED
TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND
TO THE SATISFACTION AND APPROVAL OF THE COR
9. NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS MUST BE REINSTALLED AT
END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
N O R T H C O U R T Y A R D
PROPOSED MIDDLE WING FLOOR PLAN WITH FURNITURE
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
PROPOSED SOUTH WING COURTYARD FLOOR PLAN WITH FURNITURE
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
NEW STC-50 WALLS
NEW NON-STC-50 WALLS : FRAMING FROM
FLOOR PLATE UP TO CEILING PLATE. SEE WALL
TYPES AS INDICATED
EXISTING WALLS TO REMAIN
X
X
X
A
EXISTING DOORS WITHIN THE AREA OF
WORK TO REMAIN
X X
X A
NEW DOOR WITHIN THE AREA OF WORK
EXISTING DOORS OUTSIDE THE AREA OF
WORK TO REMAIN
LEGEND
NOT IN THE SCOPE OF WORK
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
ELEV + 0'-0"
ELEV + 0'-4"
UP
ELEV + 0'-0"
ELEV + 0'-4"
UP
UP
UP
5211-T 5211-U 5211-V 5211-W 5211-X 5211-Y 5211-Z 5211-AA 5211-BB 5211-CC 5211-DD 5211-EE 5211-FF 5211-GG 5211-HH
5211-A 5211-B 5211-C 5211-D 5211-E 5211-F 5211-G
5211-N 5211-M 5211-L 5211-K 5211-J 5211-I 5211-H
5211-O 5211-P 5211-Q
5211-R 5211-S
FLOOR PANEL LOCATION IS APPROXIMATE LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
RAISED FLOOR 9" HIGH ( 5" BELOW HISTORIC CORRIDOR FF & 4" ABOVE HISTORIC CORRIDOR FF)
RAISED FLOOR 9" HIGH ( 5" BELOW HISTORIC CORRIDOR FF & 4" ABOVE HISTORIC CORRIDOR FF)
C5300 B
HISTORIC CORRIDOR
ELEV + 0'-0"
ELEV + 0'-2"
UP
UP
5313-A
5313-B
FLOOR PANEL LOCATION IS APPROXIMATE. LOCATION VERIFICATION SURVEY WILL BE CONDUCTED PRIOR TO START OF CONSTRUCTION
RAISED FLOOR 6" HIGH ( 4" BELOW HISTORIC CORRIDOR FF & 2" ABOVE HISTORIC CORRIDOR FF)
A - 105
1/8"= 1'-0"
0 4'
8'
16'
2'
PROPOSED FLOOR PLAN W/ FURNITURE
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS BEFORE STARTING. NO FORENSIC DEMOLITION WAS
CONDUCTED AT THE TIME OF THE SURVEY. DISCREPANCIES MIGHT BE ENCOUNTERED BETWEEN
ACTUAL CONDITIONS & DRAWINGS. INFORM COR PRIOR TO PROCEEDING w/ WORK
2. IN CASE OF CONFLICTS BETWEEN PLANS, KEY NOTES, SECTIONS, DETAILS & THE SPECIFICATIONS, THE
MOST STRINGENT REQUIREMENT APPLIES
3. ALL WORK MUST BE COMPLETED ACCORDING TO IBC, IPC, NEC, IMC, IECC, FC LATEST EDITION
4. ALL DIMENSIONS ARE GIVEN FROM FINISH WALL OR PARTITION TO FINISH WALL OR PARTITION
5. ALL WORK PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS SPECIFICALLY MARKED
"EXISTING", "EXTG", OR "(E)"
6. BEST PRACTICES, METHODS AND MATERIALS, MUST BE FOLLOWED AT ALL TIMES. ANY ITEM NOT
SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT NECESSARY FOR THE
COMPLETION OF THE PROJECT, SHALL BE CONSIDERED PART OF THE CONTRACT'S SOW
7. THE COR IS RESPONSIBLE FOR THE REMOVAL & PROPER DISPOSAL OF ALL G.C. WORK RELATED
TRASH AND DEBRIS
8. PROTECT ALL GOVERNMENT PROPERTY ENCOUNTERED AT THE JOB SITE AGAINST DAMAGE. ALL
DAMAGES CAUSED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING AND
TO THE SATISFACTION AND APPROVAL OF THE COR
9. NEW FURNITURE AND EQUIPMENT PROVIDED BY OWNER
10. REMOVE ALL HVAC COVERS AS NEEDED. SEAL EXPOSED DUCTS & VENTS TO PREVENT INTRODUCING
DUST INTO THE SYSTEM. PROTECT AND COVER FCU'S (REMOVED COVERS MUST BE REINSTALLED AT
END OF THE JOB)
11. PROTECT CAST IRON COLUMNS, WINDOWS AND EXTANT MILLWORK DURING CONSTRUCTION
N O R T H C O U R T Y A R D
PROPOSED MIDDLE WING FLOOR PLAN WITH FURNITURE AND FLOOR PANEL SYSTEM
C-1
1/8" = 1'-0"
MIDDLE WING
SOUTH WING COURTYARD
PROPOSED SOUTH WING COURTYARD FLOOR PLAN WITH FURNITURE AND FLOOR PANEL SYSTEM
A-1
1/8" = 1'-0"
S O U T H C O U R T Y A R D
S O U T H C O U R T Y A R D
NEW STC-50 WALLS
NEW NON-STC-50 WALLS : FRAMING FROM
FLOOR PLATE UP TO CEILING PLATE. SEE WALL
TYPES AS INDICATED
EXISTING WALLS TO REMAIN
X
X
X
A
EXISTING DOORS WITHIN THE AREA OF
WORK TO REMAIN
X X
X A
NEW DOOR WITHIN THE AREA OF WORK
EXISTING DOORS OUTSIDE THE AREA OF
WORK TO REMAIN
LEGEND
EXISTING AND RECONFIGURED IRVINE-TATE CONCORE / ALLSTEEL 24"x 24" FLOOR PANEL SYSTEM.
ELEVATION ± 4" @ MIDDLE WING, ELEVATION ± 2" @ SOUTH COURTYARDWING
UNEXCAVATED FLOOR / TATE PANEL SYSTEM ELEV 0'-0"
NOT IN THE SCOPE OF WORK
R E
V I S
I O
N
N
O T
E S
GR
AP
HI
C
SC
AL
E
MARK DATE DESCRIPTION
AGF
SHEET SIZE:
DISCIPLINE SHEET TYPE SEQUENCE
DRAWING NO.
DRAWING TITLE
FILE NAME
CHECKED BY
DRAWN BY DATE DRAFTED:
PROJECT NO.
GSA PM
SUB. DATE
SUBMISSION
DESCRIPTION
PROJECT
TITLE
BUILDING NOs.
OTHER
BUILDING NO.
CITY/ST./ZIP
STREET
NAME
DR
AW
IN
G
PR
OJ
EC
T
BU
ILD
IN
G
SUB A/E
PRIME A/E
CONS. CONTR.
A/E CON. NO.
CO
NT
RA
CT
OR
S
FLOOR NO.
CONSTR. CON.
FACILITY CODE
PROJECT
A/E TASK NO.
CONS. WORK
24 x 36
2 3 4 5
2 3 4 5
A
B
C
D
WASHINGTON, DC
MERIDIEN GROUP / CITADEL DCA
SUMMER CONSULTANTS
LSP
CRAIG GARDNER
09/15/2018
5TH FLOOR
0019-13
08 DECEMBER 2019
100%
CERTIFICATIONSKEY PLAN
D O W N
D O W N
N
MIDDLE
SOUTH
COURTYARD
SOUTH
COURT
FEDERAL OFFICE BUILDING 5TH FLOOR
MIDDLE & SOUTH COURTYARD WINGS RENOVATION
INTERIOR SPACE RENOVATION
MERIDIEN GROUP, LLC
208 SOUTH KING ST. SUITE 303
LEESBURG, VA 20175
OS
OS
OS OS OS OS
OS
OS
CEILING 9'-6"
CEILING 9'-6"
RAISED PERIMETER CEILING AREA CLEARS WINDOWS / WINDOW OPENINGS EA @ ± 6'-2" (H) X ± 2'-9" (W)
RAISED PERIMETER CEILING AREA CLEARS WINDOWS / WINDOW OPENINGS EA @ ± 6'-2" (H) X ± 2'-9" (W)
CEILING TO
CLEAR DOOR & TRANSOM
CEILING 7'-11"CEILING 9'-5"
RAISED PERIMETER CEILING AREA CLEARS WINDOWS WINDOW OPENINGS EA @ ± 7'-10" (H) X ± 42" (W) / SILL @ 39 1/2" AFF
OS
OSOS
OS
OS OCCUPANCY SENSOR (CEILING MOUNTED)
2' x 2' LIGHT FIXTURE (SEE E-DRAWINGS FOR EXACT TYPE)
LIGHT FIXTURE CEILING MOUNTED, SURFACE OR RECESSED
(SEE E-DRAWINGS FOR EXACT TYPE)
SINGLE FACE EXIT SIGN
CEILING MOUNTED FIRE ALARM COMBINATION STROBE / HORN
CD= CANDELA RATING
MNT= MOUNT LOCATIOM
EXISTING SPRINKLER HEAD TO REMAIN
2' x 2' EMERGENCY LIGHT FIXTURE WITH INTEGRAL SELF TESTING /
SELF DIAGNOSTIC BATTERY PACK. BATTERY SHALL BE HIGH
TEMPERATURE MAINTENANCE FREE, AND CAPABLE OF OPERATING
FIXTURE IN EMERGENCY MODE 90 MINUTES MINIMUM
PERFORATED CEILING PANEL, 24" x 24" FACE AREA
SUPPLY AIR DIFFUSER, 24" x 24" FACE AREA. SEE M-DRAWINGS FOR
BALANCING AIRFLOW CFM & SCHEDULE FOR SIZING
CEILING MOUNTED FIRE ALARM STROBE
CD= CANDELA RATING
SMOKE DETECTOR
NEW SPRINKLER HEAD
CD
MNT
CD
NEW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .