Attachment C - TFIN LAN room -Rack Elevations - Phase 2 - 10-22-19 - Amendment 0002.pdf

PDF 565 KB Posted

Attached to
U. S. Treasury CFIUS Renovation Phase 2 & Phase 4A - Solicitation Federal contract opportunity
Solicitation number
2032H320R00009
Issued by
Department of the Treasury Internal Revenue Service

About this file

This document contains rack elevation drawings and specifications for a federal solicitation. The U.S. Department of the Treasury is seeking to renovate space for the new Committee on Foreign Investment in the United States (CFIUS) on the fifth floor of the Main Treasury building. Phase 2 and 4A of the renovation will include installing two open data racks measuring 19"W x 7'H, three vertical cable managers, fiber shelves, power strips, and other equipment in the specified locations. The solicitation number is 2032H320R00009 and is for the U.S. Treasury CFIUS Renovation Phase 2 & Phase 4A project.

View the file

Other files for this federal contract opportunity

Other files attached to U. S. Treasury CFIUS Renovation Phase 2 & Phase 4A - Solicitation, newest first.
File Type Posted
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0007.pdf PDF
Sketch A.pdf PDF
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0006.pdf PDF
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0005.pdf PDF
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0004.pdf PDF
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0003.pdf PDF
Attachment A - Information Outlet Floorplan v1 - Amendment 0002.pdf PDF
5th Floor MT Phase 2 Middle and South Courtyard - CFIUS v1.doc DOC document
Attachment D - TFIN LAN room -Rack Layout - Phase 2 -10-22-19 - Amendment 0002.pdf PDF
CFIUS Base Phase 2 Option 4A SOW Revised - Amendment 0002.docx DOCX document
2032H320R00009 - CFIUS Phase 2 Solicitation - Amendment 0002.pdf PDF
Attachment B- Material Pricing spreadsheet - Middle South Courtyard - 10-22-19 - Amendment 0002.xlsx XLSX spreadsheet
2032H320R00009 - CFIUS Phase 2 & 4A Solicitation - Amendment 0001.pdf PDF
2032H320R00009 - CFIUS Phase 2 & 4A Solicitation - Final.pdf PDF
1. CFIUS Base Phase 2 & Option 4A Drawings Part 1 of 3.pdf PDF
1. CFIUS Base Phase 2 & Option 4A Drawings Part 2 of 3.pdf PDF
1. MT PHASE 2- DEC 8 2019 - 3 OF 3.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20.0in.

GROUND BAR

Treasury Telecom Office

TFIN

DATA

RACK #1

20.0in.

GROUND BAR

6.0 in 6.0 in

TFIN

DATA

RACK #2

2U

Two Post Open Data Rack:

19"W x 7' H

600G2 Fiber Shelf 1U

6.0 in

8'-4"

Two Post Open Data Rack:

19"W x 7' H

V e rt ic a l

C a b le

M a n a g e r

D o u b le

S id ed

W x

'H x

-½

D

V e rt ic a l

C a b le

M a n a g e r

D o u b le

S id ed

W x

'H x

-½

D

V e rt ic a l

C a b le

M a n a g e r

D o u b le

S id ed

W x

'H x

½ D

2U

RU

RU

1500 Penn Ave 5th floor Phase 2

Middle Area

1UPower Strip 1UPower Strip

4U FIBER SHELF

4U FIBER SHELF

Catalyst

4510R

FAN

STATUS

10FLEX-SLOT

Attachment C - Phase 2 - TFIN LAN room.vsd
Page-1

File details come from the government source that posted it. Updated .