SOW - AAS maintenance.pdf
PDF 201 KB Posted
- Attached to
- AAS One Year Building Maintenance
- Solicitation number
- 19RS5026Q0002
- Issued by
-
Department of State
About this file
This Statement of Work (SOW) describes essential property preservation services for a vacant American School Facility located at Beregovaya Street, Building No. 1, Moscow, Russian Federation. The contractor shall furnish all labor, materials, equipment, and services on a fixed-price monthly basis for both scheduled maintenance and emergency services, with no adjustments for cost escalations, labor fluctuations, or currency exchange rate variations unless mandated by local law.
The core services required include: fire protection systems maintenance (alarm and sprinkler system monitoring, inspection, and testing); climate control and freeze prevention (heating system operation to maintain minimum 50°F/10°C); domestic water system freeze prevention; security and surveillance services with twice-daily patrols and 15-minute emergency response times; maintenance and daily cleaning of three designated worker bathrooms to industrial sanitary standards; grounds maintenance including lawn mowing (every two weeks May-August, monthly April/September/October) and vegetation control; quarterly deep cleaning and periodic light cleaning of facility interiors; waste management with dumpster services; 24/7 emergency response capability; utilities management and coordination with local providers; utility billing validation and processing with five-business-day forwarding to the Contracting Officer; and basic property preservation through monthly walk-through inspections. Emergency response times are specified as 30 minutes for fire alarm activations, one hour for heating failures, two hours for water system failures, and 15 minutes for security breaches. Excluded services include comprehensive janitorial services, landscaping beyond maintenance, HVAC beyond freeze protection, elevator maintenance, kitchen equipment maintenance, and regular electrical services except emergency repairs affecting fire or heating systems. Material and equipment reimbursement for emergency services requires specific Contracting Officer authorization with itemized invoicing showing purchase price, transportation, handling costs, and VAT where applicable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am 3_19RS5026Q0002.pdf | ||
| Am 2_19RS5026Q0002.pdf | ||
| SOW - AAS 260709_upd.pdf | ||
| Am 1_19RS5026Q0002.pdf | ||
| 19RS5026Q0002_AAS_upd.pdf | ||
| SF1449_upd.docx | DOCX document | |
| 19RS5026Q0002_AAS maintenance_signed.pdf | ||
| SF1449.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Background/Scope of Services:
The Contractor shall perform essential property preservation services at the vacant
American School Facility, Beregovaya Street, Building No. 1, Moscow, Russian
Federation. The facility is currently unoccupied and requires minimal maintenance to preserve critical systems and ensure property security. The Contractor shall furnish all labor, materials, equipment, and services required under this contract within the time specified herein.
1. GENERAL
The Contractor shall:
• Provide all labor and tools to conduct work in each respective trade
• Perform the tasks below with qualified technicians within the selected trade
• Provide liability insurance for their employees
• Maintain 24/7 emergency response capability
2. DESCRIPTION OF SERVICES
The Contractor shall provide all labor, materials, and tools to perform the following essential services for the vacant facility:
A. Fire Protection Systems Maintenance
• Fire alarm system monitoring, inspection, and maintenance
• Fire sprinkler system monitoring, inspection, and maintenance
B. Climate Control for Fire System Protection
• Heating system operation and monitoring to maintain minimum temperatures necessary to prevent freezing of fire suppression systems
• Temperature monitoring throughout the facility
C. Water System Freeze Prevention
• Domestic water system operation and monitoring to prevent freezing of all water pipes and plumbing
D. Security and Surveillance Services
• Physical security patrols and monitoring to prevent unauthorized access, vandalism, and ensure general property safety
• Surveillance system operation and monitoring
E. Worker Bathroom Facilities
• Maintenance and daily cleaning of three designated bathrooms for contractor worker use
F. Grounds Maintenance
• Lawn mowing and vegetation control to maintain property appearance
G. General Housekeeping
• Periodic interior cleaning to prevent deterioration and maintain basic property standards
H. Waste Management and Dumpster Services
• Trash removal and disposal services for building operations, landscape debris, and materials from building operations
I. Emergency Response
J. Utilities Management
K. Utility Billing Coordination and Payment Processing
L. Basic Property Preservation
3. SPECIFIC TASKS
3.1 Fire Alarm System Maintenance and Monitoring
• Monitor fire alarm system continuously
• Test fire alarm system a minimum of four times per year
• Inspect fire alarm system quarterly by a licensed contractor
• Check equipment including pull stations, alarm bells or buzzers, and strobe light indicators
• Inspect and clean smoke and heat detectors within the building and ductwork to prevent false alarms
• Ensure control panels are accessible and functional
• Respond to all fire alarm activations within 30 minutes
• Maintain all required documentation and inspection records
• Ensure compliance with local fire safety regulations
3.2 Fire Sprinkler System Maintenance and Monitoring
The Contractor shall:
• Inspect fire sprinkler system quarterly
• Service fire sprinkler system annually by a licensed contractor
• Monitor system pressure and functionality
• Inspect all sprinkler heads, valves, and piping for damage or leaks
• Ensure system remains operational and unfrozen
• Maintain all required documentation and inspection records
• Respond to system malfunctions within 2 hours
3.3 Climate Control and Freeze Prevention
The Contractor shall:
• Operate heating systems to maintain minimum temperature of 50°F (10°C) throughout the facility to prevent freezing of fire suppression systems and plumbing
• Monitor temperature in all areas of the building, particularly where fire suppression systems and water pipes are located
• Install and monitor temperature sensors in critical areas
• Respond immediately to heating system failures or temperature drops below safe levels
• Perform monthly inspections of heating equipment
• Maintain heating system in operational condition, including boilers, thermostats, and controls
• Ensure adequate fuel supply for heating systems
• Document daily temperature readings
• Provide emergency heating response 24/7
3.4 Water System Freeze Prevention and Maintenance
The Contractor shall:
• Maintain domestic water system operation to prevent freezing of all water pipes throughout the facility
• Monitor water pressure and flow in the system
• Maintain minimum water temperature in pipes to prevent freezing
• Drain and winterize any non-essential water lines if necessary to prevent freeze damage
• Inspect all exposed piping, valves, and fixtures monthly for leaks or damage
• Insulate exposed pipes in vulnerable areas as needed
• Respond to water system failures or leaks within 2 hours
• Document daily water system status
• Maintain hot water system operation at minimum levels necessary for freeze prevention
• Ensure all plumbing fixtures remain functional and unfrozen
• Provide emergency plumbing response 24/7 for freeze-related issues or major leaks
3.5 Security and Surveillance Services
The Contractor shall:
• Provide physical security patrols of the exterior and interior of the property a minimum of twice daily (morning and evening)
• Conduct additional random patrols at varying times to deter unauthorized access
• Monitor and maintain surveillance camera systems
• Ensure all entry points (doors, windows, gates) are secured
• Inspect perimeter fencing and barriers for breaches
• Document all security incidents, suspicious activities, or signs of attempted entry
• Respond to security breaches or alarms within 15 minutes
• Coordinate with local authorities as needed for security incidents
• Maintain exterior lighting for security purposes
• Secure the property against vandalism, theft, and unauthorized entry
• Provide 24/7 emergency security response capability
• Submit weekly security reports to the COR
3.6 Worker Bathroom Facilities Maintenance
The Contractor shall:
• Designate three (3) bathrooms within the facility for exclusive use by contractor workers
• Clean and sanitize designated bathrooms daily at minimum, following industrial sanitary standards
• Perform cleaning tasks including:
o Clean and sanitize all vitreous fixtures including toilet bowls, urinals, and hand basins o Clean and sanitize all flush rings, drains, and overflow outlets o Clean and polish all chrome fittings o Clean and sanitize toilet seats o Clean and sanitize hand basin counters o Damp mop floors with disinfectant o Clean and polish all mirrors o Remove spots, stains, and splashes from wall areas o Spot clean partitions o Empty trash receptacles and replace liners
• Provide and maintain all required toiletries from contractor's supply, including:
o Toilet paper o Hand soap o Paper towels or hand dryers o Air fresheners o Cleaning supplies
• Ensure bathrooms meet industrial sanitary standards at all times
• Maintain adequate ventilation in bathroom areas
• Report any plumbing or fixture malfunctions immediately
• Keep bathrooms locked when not in use to prevent unauthorized access
• Maintain cleaning log documenting daily service
3.7 Grounds Maintenance and Lawn Care
• Mow all lawn areas regularly during growing season (approximately April through October) to maintain grass height at 3-4 inches maximum
• Mowing frequency: minimum every two weeks during peak growing season
(May-August), monthly during slower growth periods (April, September, October)
• Trim grass around buildings, fences, walkways, and obstacles
• Remove grass clippings from paved surfaces after mowing
• Maintain clear sight lines around the property perimeter for security purposes
• Control weeds in lawn areas to maintain neat appearance
• Trim vegetation away from building foundations, windows, and doors
(minimum 2 feet clearance)
• Remove fallen branches and debris from lawn areas
• Keep all walkways, driveways, and parking areas clear of vegetation overgrowth
• Maintain property boundaries and fence lines clear of overgrown vegetation
• Remove snow and ice from main walkways, emergency exits, and fire department access points as needed
• Document all grounds maintenance activities monthly
3.8 General Housekeeping and Interior Cleaning
The Contractor shall perform quarterly deep cleaning of the facility to prevent deterioration, pest infestation, and maintain basic property standards:
Quarterly Cleaning Tasks (Four times per year - suggested schedule: March, June, September, December):
• Sweep and damp mop all hard floor surfaces throughout the facility
• Vacuum all carpeted areas throughout the facility
• Remove dust and debris from all horizontal surfaces including windowsills, ledges, and countertops
• Spot clean walls, doors, and partitions to remove marks, stains, and graffiti
• Clean all interior glass surfaces including windows and doors
• Remove cobwebs from ceilings, corners, and light fixtures
• Empty and clean all trash receptacles throughout the building
• Clean and sanitize all non-worker bathroom fixtures (to prevent deterioration and odors)
• Inspect and clean all floor drains to prevent clogs and odors
• Remove any accumulated debris, trash, or materials left in the building
• Clean entrance areas and lobbies
• Clean stairwells and corridors
• Inspect for and remove any signs of pest activity or droppings
• Inspect for and report any water damage, mold, or mildew
• Ensure all areas are left clean, dry, and free of debris
• Document cleaning activities with photographic evidence
Monthly Light Cleaning Tasks:
• Sweep main corridors and entrance areas
• Remove any trash or debris from common areas
• Spot clean entrance doors and high-touch surfaces
• Check for and remove any pest evidence
• Inspect for water leaks or damage
As-Needed Cleaning:
• Clean up any spills, leaks, or water damage immediately
• Remove any unauthorized materials or trash
• Address any sanitation issues that arise between scheduled cleanings
3.9 Waste Management and Dumpster Services
The Contractor shall:
• Provide and maintain dumpster(s) on-site for waste collection and disposal
• Ensure dumpster(s) are appropriately sized for the facility's needs
• Arrange for regular dumpster pickup and waste disposal services in accordance with local regulations
• Collect and dispose of all trash generated from:
o Building operations and maintenance activities o Landscape maintenance (grass clippings, branches, leaves, vegetation debris) o Materials from building operations (packaging, discarded materials, equipment) o Worker bathroom facilities o Quarterly and monthly cleaning activities o Any other waste generated during contract performance
• Empty interior trash receptacles and transport waste to dumpster(s) as needed
• Maintain dumpster area in clean and sanitary condition
• Ensure dumpster lids are closed to prevent pest infestation and weather damage
• Coordinate with local waste management authorities for proper disposal
• Comply with all local waste disposal and recycling regulations
• Separate recyclable materials if required by local regulations
• Remove any illegally dumped materials or unauthorized waste from the property
• Document waste removal activities monthly
• Provide proof of proper waste disposal upon request
3.10 Emergency Response
The Contractor shall:
• Maintain 24/7 emergency contact capability
• Respond to fire alarm activations within 30 minutes
• Respond to heating system failures within 1 hour
• Respond to water system failures within 2 hours
• Respond to security breaches within 15 minutes
• Provide emergency contact information to the COR
• Maintain a call-out list of qualified personnel for emergency response
3.11 Utilities Management
The Contractor shall:
• Coordinate with utility providers to ensure continuous service for heating, water, and fire protection systems
• Monitor utility consumption
• Report utility outages or service interruptions immediately to the COR
3.12 Utility Billing Coordination and Payment Processing
The Contractor shall:
• Coordinate directly with city government utility providers and relevant municipal authorities to obtain all invoices, service charges, and billing statements for utilities consumed at the facility, including but not limited to:
o Electricity o Water o Sewage o Storm drainage services
• Validate all utility charges for accuracy, including verifying that billed consumption is consistent with actual usage at the facility, and flag any discrepancies to the COR prior to forwarding
• Promptly forward all validated utility invoices and supporting documentation to the COR for U.S. Government payment processing, no later than five (5) business days after receipt from the utility provider
• Maintain a monthly utility billing log documenting the provider name, service type, billing period, amount billed, date received, validation status, and date forwarded to the COR
• Notify the COR immediately of any utility service interruptions, billing disputes, or delinquency notices received from utility providers
• Ensure no utility services are disconnected due to non-coordination or administrative delays attributable to the Contractor
3.13 Basic Property Preservation
The Contractor shall:
• Conduct monthly walk-through inspections of the entire facility
• Document and report any water leaks, roof damage, or structural issues that could compromise fire systems or building integrity
• Ensure roof drains and gutters are clear to prevent water damage
• Report any signs of pest infestation, mold, or water damage
4. EXCLUDED SERVICES
The following services are NOT required under this contract:
• Comprehensive janitorial and cleaning services (only quarterly general housekeeping and worker bathroom cleaning required)
• Landscaping services (planting, mulching, ornamental care)
• Maintenance of HVAC systems beyond heating for freeze protection
• Elevator maintenance and operation
• Kitchen equipment maintenance
• Swimming pool maintenance
• Gymnasium and athletic equipment maintenance
• Classroom and office equipment maintenance
• Regular electrical services (except emergency repairs affecting fire or heating systems)
• Building management system operation (except as related to fire alarm and heating)
5. TYPES OF SERVICES
5.1 Scheduled Maintenance Services and Emergency Services
In consideration of satisfactory performance of all the services required under this contract, the Contractor shall be paid a fixed-price per month for Scheduled
Maintenance Services and Emergency Services. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor
(unless mandated by local law), or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rate.
Upon preliminary approval the Contractor may be reimbursed for costs for materials/equipment ordered in conjunction with Emergency Services. No profit shall be added to this material/equipment. All costs of materials/ equipment shall be itemized on the invoice, such as purchase price of material/equipment, cost of transportation, cost of handling; VAT (if applicable). Contractor is not approved to purchase any materials/equipment without specific authorization from the
Contracting Officer.
END OF STATEMENT OF WORK
File details come from the government source that posted it. Updated .