Amendment_0007_SF30.pdf
PDF 61 KB Posted
- Attached to
- Wellpinit Service Unit Modernization Project Federal contract opportunity
- Solicitation number
- 16-102-SOL-00031
About this file
Amendment 0007 Response to Pre Proposal Inquiries Submitted,
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0008_SF30.pdf | ||
| Construction_Wage_Determination_MOD_07.pdf | ||
| J-_12_Wellpinit_Service_Unit_Clinic_RBM_Report_Sept_2014.pdf | ||
| Amendment_0006_SF30.pdf | ||
| Site_Walk_Attendance_Sheet.pdf | ||
| Amendment_0005_SF30.pdf | ||
| Amendment_0004_SF30.pdf | ||
| J-11__Amendment_on_Sheet_No__E-101.pdf | ||
| J-10_Construction_Wage_Determination..pdf | ||
| Amendment_0003_SF30.pdf | ||
| Amendment_0002_SF30.pdf | ||
| J-04_Architectural_2_of_2_Rev_1.pdf | ||
| Amendment_0001_SF30.pdf | ||
| J-02_Specifications.pdf | ||
| Solicitation_16-102-SOL-00031.pdf | ||
| J-07_Electrical.pdf | ||
| J-06_Mechanical_2_of_2.pdf | ||
| J-03_Architectural_1_of_2.pdf | ||
| J-04_Architectural_2_of_2.pdf | ||
| J-_05_Mechanical_1_of_2.pdf | ||
| J-_01_Contract_Requirements.pdf | ||
| J-09_PPI.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 3
2. Amendment/Modification No.
3. Effective Date
13 December 16
4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
6. Issued By Code
Indian Health Service DES 701 Fifth Ave, Suite 1600 M/S-24 Seattle, WA 98104
7. Administered By (If other than Item 6) Code
Same as block 6
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
16-102-SOL-00031
X 9B. Date (See Item 11)
8 November 2016 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.IT MODIFIES THE
CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Wellpinit Service Unit Modernization Prepared by: Fannon, John W.
16-102-SOL-00031
************************Description of this amendment begins on page 2****************
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
(Signature of person authorized to sign)
15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
SF30 Continuation of Block Narrative Page of
SUMMARY OF CHANGES
The solicitation is hereby amended to address the following:
1. Respond to Pre-Proposal Inquiries (PPI) received in addressing the solicitation package.
INQUIRY 0016:
I am looking at putting together pricing for this project that bids on December 19. The documents state to tie in to the existing fire alarm system. Could you tell me what fire system they currently have?
RESPONSE PROVIDED:
The system is a Keri system thru Allied Fire & Security.
INQUIRY 0017:
Print E-102 shows Cat6A patch panels in rack detail while faceplate detail shows just Cat6. What category 6A or 6 are we quoting?
RESPONSE PROVIDED:
Any reference to CatN cabling should be minimum EIA/TIA-568-B/TSB-184 compliant for category 6A cabling (CAT6A)
INQUIRY 0018:
Are the new cables in the east end of building 1st and 2nd floors terminating in closet 223 or new closet 160?
RESPONSE PROVIDED:
New cables in the east end of building 1st and 2nd floor to terminate in closet 223.
a. Eliminate item for “…24-PAIR CAT-6 RISER CABLES PUNCHED-DOWN AND ROUTED TO NEW I.T. ROOM 160…” from Basement Room 223 (reference sheet title:
IT PHASE/OVERALL COMMUNICATIONS PLAN – NEW, E-101, sheet 35 of 42, FLAG NOTES #1)
b. Eliminate item to “…DRILL (3) NEW 4” HOLE/SLEEVES FROM CRAWLSPACE
INTO ROOM 221 OF BASEMENT AS REQUIRED TO ACCOMMODATE NEW
CABLES.” (Reference sheet title: IT PHASE/OVERALL COMMUNICATIONS PLAN – NEW, E-101, sheet 35 of 42, FLAG NOTES #4)
2 3
SF30 Continuation of Block Narrative Page of
INQUIRY 0019:
Will this network system be VOIP or is there a phone system?
RESPONSE PROVIDED:
Network is VoIP using Power over Ethernet (POE).
INQUIRY 0019:
Are allocated data and voice cables to be landed on separate patch panels and labeled accordingly?
RESPONSE PROVIDED:
Not required in accordance to sheet title IT PHASE/OVERALL COMMUNICATIONS PLAN – NEW, E-101, sheet 35 of 42, FLAG NOTES #5: “DO NOT DISTURB (E)T1
LINES AND (E)ANALOG PHONE LINES-NOT IN SCOPE.”
END OF THE AMENDMENT. All other terms and conditions remain unchanged.
The proposal due date IS NOT EXTENDED as a result of this Amendment.
3 3
File details come from the government source that posted it. Updated .