Amendment_0006_SF30.pdf
PDF 39 KB Posted
- Attached to
- Wellpinit Service Unit Modernization Project Federal contract opportunity
- Solicitation number
- 16-102-SOL-00031
About this file
Amendment 0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0008_SF30.pdf | ||
| Construction_Wage_Determination_MOD_07.pdf | ||
| Amendment_0007_SF30.pdf | ||
| J-_12_Wellpinit_Service_Unit_Clinic_RBM_Report_Sept_2014.pdf | ||
| Site_Walk_Attendance_Sheet.pdf | ||
| Amendment_0005_SF30.pdf | ||
| Amendment_0004_SF30.pdf | ||
| J-11__Amendment_on_Sheet_No__E-101.pdf | ||
| J-10_Construction_Wage_Determination..pdf | ||
| Amendment_0003_SF30.pdf | ||
| J-04_Architectural_2_of_2_Rev_1.pdf | ||
| Amendment_0002_SF30.pdf | ||
| Amendment_0001_SF30.pdf | ||
| J-02_Specifications.pdf | ||
| Solicitation_16-102-SOL-00031.pdf | ||
| J-07_Electrical.pdf | ||
| J-04_Architectural_2_of_2.pdf | ||
| J-_05_Mechanical_1_of_2.pdf | ||
| J-06_Mechanical_2_of_2.pdf | ||
| J-03_Architectural_1_of_2.pdf | ||
| J-_01_Contract_Requirements.pdf | ||
| J-09_PPI.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 2
2. Amendment/Modification No.
3. Effective Date
2 December 16
4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
6. Issued By Code
Indian Health Service DES 701 Fifth Ave, Suite 1600 M/S-24 Seattle, WA 98104
7. Administered By (If other than Item 6) Code
Same as block 6
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
16-102-SOL-00031
X 9B. Date (See Item 11)
8 November 2016 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Wellpinit Service Unit Modernization Prepared by: Fannon, John W.
16-102-SOL-00031
************************Description of this amendment begins on page 2****************
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
(Signature of person authorized to sign)
15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
SF30 Continuation of Block Narrative Page of
SUMMARY OF CHANGES
The solicitation is hereby amended to address the following:
1. Provide Regulated Building Material report as attachment J-12.
2. Respond to Pre-Proposal Inquiries (PPI) received in addressing the solicitation package.
3. Provide the Site walk the attendance sheet.
PPI RESPONSE:
Section J is hereby amended as follows:
SECTION J – LIST OF ATTACHMENTS
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT
NUMBER ATTACHMENT TITLE
J-01 Contract Requirement J-02 Design and Specifications J-03 Architectural 1 of 2 J-04 Architectural 2 of 2 REV 1 J-05 Mechanical 1 of 2 J-06 Mechanical 2 of 2 J-07 Electrical J-08 Past Performance Questioner J-09 Pre Proposal Inquiry (PPI) J-10 Construction Wage Determination J-11 Amendment on Sheet No E-101 J-12 Wellpinit Service Unit Clinic RBM Report Sept 2014
INQUIRY 0015:
I was going through the solicitation and maybe it was an oversight on my part but did not see a projected start date once a low bidder has been established. Since there is replacement of HVAC equipment is the projected start date to put off until spring or will temporary heat need to be supplied and the project will start within a month of bid date? Any help that you can give would be appreciated.
RESPONSE PROVIDED:
In accordance with Section F.2 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984).
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date of award, (b) prosecute the work diligently, and (c) complete the entire work within 180 calendar days. The time stated for completion shall include
SF30 Continuation of Block Narrative Page of final cleanup of the premises. Performance time will include submittals and approvals.
(End clause).
Additionally, Phase 0b, HVAC Replacement does not have to be completed prior to the other phases. The other phases also do not have to be completed in order, with the exception of Phases 2a and 2b.
END OF THE AMENDMENT. All other terms and conditions remain unchanged.
The proposal due date IS NOT EXTENDED as a result of this Amendment.
2 2