16-Attachment 6 - Terminal Concessions Maps Draft Lease Occupancy Drawings.pdf
PDF 13 MB Posted
- Attached to
- MSP Concessions RFP
- Solicitation number
- Solicitation166
- Issued by
- Hennepin County, Minnesota
About this file
This document is a Terminal Concessions Maps and Draft Lease Occupancy Drawings prepared by the Metropolitan Airports Commission (MAC) for Minneapolis-St. Paul International Airport (MSP) as part of a 2026 Concession Planning Study. The file contains detailed architectural floor plans and occupancy drawings for concession spaces across Terminal 1 (Arrivals Level, Departures Level, and Concourses A through G) and Terminal 2, establishing the layout, square footage, and designated uses for retail, food and beverage, news, and specialty concession locations. The drawings specify individual lease locations with precise dimensions and square footage allocations, ranging from small news stands (approximately 500–750 square feet) to large full-service restaurants and market concepts (up to 10,663 square feet). The concession categories include coffee shops, quick-service restaurants, casual dining establishments, duty-free retail, specialty retail (electronics, apparel, sunglasses, beauty), books and news stands, and market-bar hybrid concepts, with locations distributed throughout pre-security and post-security terminal areas to serve arriving, departing, and connecting passengers.
The drawings document the physical infrastructure requirements for prospective concessionaires, including building systems coordination, electrical and mechanical provisions, accessibility standards, future expansion considerations, and tenant access requirements. Each location plan includes notes requiring tenants and design professionals to verify dimensions and field conditions, with references to building structural elements such as expansion joints, folded plate concrete above certain locations, and coordination with MAC facilities and infrastructure. The document indicates that proposed concession spaces are designated for both local/proprietary operators and national brand operators, with specific lease occupancy units identified by location codes (such as LT-2014 for Duty Free Retail at 4,955 square feet or G-2390 for Full-Service Restaurant and Coffee at 4,298 square feet). This planning study establishes the baseline design parameters and occupancy framework that potential concessionaires would utilize when submitting proposals in response to the MSP Concessions RFP issued by the Metropolitan Airports Commission.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
REF
C
C
REF
FE FE
FE
FE FE
SD
DN
REF
C
C
REF
FE FE
FE
FE FE
SD
LT-1627
COFFEE (NATIONAL)
(PRE-SECURITY)
ARRIVALS LEVEL
1127 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n c e
MSP International Airport 4300 Glumack Drive, Suite 3191 St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/30/26
G-100
2026 CONCESSION PLANNING STUDY
ARRIVALS LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
T R
U E N
O R
T H
SCALE: 1/64" =1'-0"
T
REF
CC
R E
F
REF
CC CC CC CC CC
REF
CC CC CC CCCC
R E
F
R E
F
R E
F
R E
FREFREF WFS
WFS
DN
T
REF
CC
R E
F
REF
CC CC CC CC CC
REF
CC CC CC CCCC
R E
F
R E
F
R E
F
R E
FREFREF WFS
WFS
LT-2014
RETAIL (DUTY FREE)
4955 SF
LT-2142
NEWS
2123 SF
LT-2341
SUNGLASSES
506 SF
LT-2137
RETAIL (ELECTRONICS)
547 SF
LT-2277
MEN'S APPAREL
1101 SF
LT-2319
RETAIL
737 SF
LT-2156
FOOD & BEV
1456 SF
LT-2351
NEWS
1537 SF
LT-2237
FOOD & BEV
1165 SF
LT-2318
FOOD & BEV
2801 SF
LT-2251
BEAUTY
612 SF
LT-2323
OUTDOOR
1011 SF
LT-2344
BOOKS & COFFEE
2,620 SF
LT-2175
RETAIL (SPA)
1107 SF
LT-2120
FOOD & BEV
3362 SF
LT-2260
FOOD & BEV
1001 SF
LT-2256
LOCAL SPEC
BY MAC
612 SF
LT-2278
ROTATING FOOD & BEV
1271 SF
LT-2050.01
STARBUCKS
1958 SF
LT-2150.03
AUNTIE ANNES
1378 SF
LT-2150.04
FIREHOUSE
1515 SF
LT-2150.05
HISSHO
1249 SF
LT-2150.06
SHAKE SHACK
2228 SF
LT-2244
CHILI'S
4082 SF
LT-2390
PEOPLE'S ORGANIC
5085 SF
LT-2410
THE COOK & OX
6643 SF
LT-2406
CARIBOU
1300 SF
LT-2450
LEANN CHIN
2438 SF
LT-2571
NEWS & COFFEE
(PRE-SECURITY)
DEPARTURES LEVEL
542 SF
LT-2205
SETTEBELLO
2407 SF
LT-2054
STONE ARCH
6260 SF
G-2017
COFFEE
1,186 SF
LT-2040
DELTA SKYCLUB
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/27/26
G-101
2026 CONCESSION PLANNING STUDY
DEPARTURES LEVEL - MAIN MALL PLAN
METROPOLITAN AIRPORTS COMMISSION
TR
U E N
O R
TH
W 8 x 31W 8 x 31
W 8 x 31
D-2092
TS
T O P
O F
S L A B
T O P
O F
S L A B
UP
DN DN
DN
FEC
FEC
WR
CH
TR-01
125 kVa
TV-5
WH
D-2098
FOOD & BEV
2773 SF
D-2092
QUICK-SERVE
RESTAURANT -
CHICKEN (NATIONAL)
2191 SF
D-2060
NEWS & CONVENIENCE
704 SF
D-2100
MCDONALDS
2659 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
05/19/26
G-102
2026 CONCESSION PLANNING STUDY
D CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
TRUE N
ORTH
SCALE: 1/32" =1'-0"
W F
SW
F
S
W F
S
C-2 16 0.02
C-2 168 -M
C -2
0.
5'-3 7/8"
'-3
32'-4"
I D
W 10 x 49W 10 x 49 W 10 x 49
W 8 x 31W 8 x 31W 8 x 31 W 8 x 31
W 10 x 49
W 8 x 31W 8 x 31
W 8 x 31 W 8 x 31
A
D A TA BLE
DOW N
UPDN
DN
DN
DN
DN
D N
C-2110
C-2090
LT-2000.03
S H A K E T A B L E
STORAGESTORAGE
BREWER
TRASH
S T O R A G E
S T O R A G E
S T O R A G E
S T O R A G E
P A N
R A C K
S T O R A G E
S T O R A G E
S T O R A G E
P A N R A C K
T R A S H
P A N R A C K
S T O R A G E
CO2
CO2
NUCO
NUCO
MCDANTIM
BEER BLASTER
STORAGE
LOCKABLE
S T O R A G E
L O C K A B L E
P O S
C-2542
NEWS
913 SF
C-2573
FOOD & BEV
1846 SF
TRAM STOP
C-2423
HJEM + HOME
970 SF
C-2460
TWINS GRILL
6010 SF
DELTA SKYCLUB
GATE C12
C-2570
CHICK-FIL-A
1380 SF
C-2552
SMASHBURGER
1141 SFC-2546
STARBUCKS
516 SF
C-2873
NEWS
1228 SF
C-2836
COFFEE
1097 SF
GATE C21
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
C-2171
NEWS
598 SF
C-2160
SNACK
752 SF
TRAM STOP
C-2020
JOE & THE JUICE
1616 SF
C-2114
BUFFALO WILD WINGS
4463 SF
C-2240
BOTTLE ROCKET
2127 SF
C-2234
VERDI
809 SF
C-2269
VINO VOLO
1497 SF
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/27/26
G-103
2026 CONCESSION PLANNING STUDY
C CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
TRUE NORTH
CC
A-1010
NEWS & CONVENIENCE
585 SF
C-1974
BLUE DOOR PUB
2418 SF
A-1420
THE COCKTAIL ROOM
1349 SF
A-1032
BRUEGGER'S BAGELS
593 SF
A-1034
TACO JOHN'S
935 SF
A-1036
PANDA EXPRESS
1153 SF
TUNNEL TO
B CONCOURSE
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
400 Clifton Avenue Minneapolis, MN 55403 612.874.4100
PROJECT
TITLE
2026016
05/20/26
G-104
2026 CONCESSION PLANNING STUDY
A CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
TRUE N
E-2437
FOOD & BEV
3018 SF
E-2454
NEWS
1102 SF
E-2390
FOOD & BEV
1165 SF
E-2404
FOOD & BEV
804 SF
E-2307
FOOD & BEV
1214 SF
E-2283
COFFEE
980 SF
E-2240
FOOD & BEV
3461 SF
E-2230
NEWS & CONVENIENCE
WITH STRONG RETAIL
1522 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/30/26
G-105
2026 CONCESSION PLANNING STUDY
E CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
SCALE: 1/64" =1'-0"
F-2154
FOOD & BEV
1246 SF
F-2170
RETAIL (NEWS)
941 SF
F-2236
RETAIL (BOOKS)
1048 SF
F-2310
COFFEE (NATIONAL)
2056 SF
F-2425
RETAIL (NEWS)
938 SF
F-2442
HI-LO DINER
2533 SF
F-2330
ZONA COCINA
4045 SF
F-2218
AUNTIE ANNIE'S
607 SF
F-2295
CHICK-FIL-A
1641 SF
F-2252
REGIONALLY THEMED GIFT
SHOP (LOCAL OR PROPRIETARY)
1026 SF
F-2283
JIMMY JOHNS
359 SF
F-2267
WENDYS
495 SF
F-2265
PANDA EXPRESS
551 SF
F-2284
SHARED BACK OF HOUSE
1428 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/27/26
G-106
2026 CONCESSION PLANNING STUDY
F CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
TRUE N
FE FE
REF
W F
S
FE
CC
WFS
FE FE
REF
W F
S W
F S
WFS
WFS
WFS
W F
S
G-2017
COFFEE
1,186 SF
G-2390
FOOD & BEV
4298 SF
G-2032
MIMOSA
4267 SF
CIBO MARKET & QSR'S
3522 SF
G-2101
SHOYU
2397 SF
G-2036
THE NORTH
MERDHANTILE
1168 SF
G-2610
TWIN BURGER & TAP
2413 SF
G-2712
STARBUCKS
1785 SF
G-2730
MILL CITY KITCHEN
4217 SF
G-2749
QSR'S
2791 SF
G-2454 NEWS
1494 SF
ENTRY TO DELTA
SKYCLUB (ABOVE)
G-2727
CIBO MARKET
1359 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
PROJECT
TITLE
2026016
04/27/26
G-107
2026 CONCESSION PLANNING STUDY
G CONCOURSE - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
TRUE N
HT-2200
COFFEE (NATIONAL), MARKET, AND BAR
10,663 SF
HT-2184
NEWS & CONVENIENCE
606 SF
COFFEE
LEGEND
RETAIL
FOOD & BEV
NEWS
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
400 Clifton Avenue Minneapolis, MN 55403 612.874.4100
PROJECT
TITLE
2026016
05/20/26
G-108
2026 CONCESSION PLANNING STUDY
TERMINAL 2 - MAIN LEVEL PLAN
METROPOLITAN AIRPORTS COMMISSION
E9 E13
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
C-2171
CONCOURSE C
CONCEPT: NEWS
598 SF
LT-2341
MAIN TERMINAL
CONCEPT: SUNGLASSES
506 SF
F-2236
CONCOURSE F
CONCEPT: RETAIL
1048 SF
LT-2014
MAIN TERMINAL
CONCEPT: RETAIL
4955 SF
LT-2142
MAIN TERMINAL
CONCEPT: NEWS
2123 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2601, TERMINAL 1
2026016
04/16/26
METROPOLITAN AIRPORTS COMMISSION
DB
C36 C37
DC
DCC
C-2171 LOD
598 SF
DC.8
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
5/12/26
C-2171
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
C-2171 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
BC
BC.5
BD
14-F15-F16-F
F-2236 LOD
1048 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
5/12/26
F-2236
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2236 BOOKS
NOTE: TENANT AND DESIGN
4A5A6A7A
D
F
G
LT-2014 LOD
4955 SF
FLOOR LEVEL CHANGE
836'-6"
839'-7"
RAMP
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
5/12/26
LT-2014
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2014 DUTY FREE & RETAIL SHOP
NOTE: TENANT AND DESIGN
G
LT-2142 LOD
2123 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/30/26
LT-2142
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2142 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
NOTE: VERIFY ABOVE AND BELOW
CONDITIONS, NO PENETRATIONS
OF CONCRETE FOLDED PLATE ABOVE
15'-0"
'-0
LT-2341 LOD
506 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2341
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2341 SUNGLASSES (NATIONAL)
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
C-2873
CONCOURSE C
CONCEPT: NEWS
1228 SF
C-2542
CONCOURSE C
CONCEPT: NEWS
882 SF
LT-2277
MAIN TERMINAL
CONCEPT: RETAIL
1101 SF
F-2425
CONCOURSE F
CONCEPT: RETAIL
650 SF
F-2252
CONCOURSE F
CONCEPT: RETAIL
1026 SF
LT-2137
MAIN TERMINAL
CONCEPT: RETAIL
547 SF
LT-2319
MAIN TERMINAL
CONCEPT: RETAIL
737 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2602, TERMINAL 1
2026016
04/16/26
C80C79
CM
CJ
C-2542 LOD
883 SF
STAIR
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/15/26
C-2542
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
C-2542 NEWS & CONVENIENCE
WITH STRONG RETAIL
NOTE: TENANT AND DESIGN
-N
C106 C107
-K.5
C-2873 LOD
1228 SFSTAIR
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/06/26
C-2873
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
C-2873 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
BD
16-F17-F18-F
F-2252 LOD
1026 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/31/26
F-2252
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2252 REGIONALLY THEMED GIFT
SHOP (LOCAL OR PROPRIETARY)
NOTE: TENANT AND DESIGN
36-F37-F38-F
BB
BA.5
BA
ELECTRICAL
F-2425 LOD
650 SF
SHAFT
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
F-2425
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2425 NEW & CONVENIENCE
NOTE: TENANT AND DESIGN
G
LT-2137 LOD
547 SF
19'-4" 6'
-5
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2137
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2137 ELECTRONICS (NATIONAL)
NOTE: TENANT AND DESIGN
G
LT-2277 LOD
1101 SF
'-0
ELECTRICAL
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2277
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2277 MEN'S APPAREL
(LOCAL OR NATIONAL)
NOTE: TENANT AND DESIGN
LT-2319 LOD
737 SF
21'-10"
'-0
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2319
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2319 SPECIALTY RETAIL
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
LT-1627
MAIN TERMINAL
CONCEPT: COFFEE
1127 SF
G-2017
CONCOURSE G
CONCEPT: COFFEE
1186 SF
LT-2571
MAIN TERMINAL
CONCEPT: FOOD & BEV
542 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2603, TERMINAL 1
2026016
04/16/26
6A7A
G
H
G-2017 LOD
1,186 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/30/26
G-2017
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
G-2017 COFFEE (NATIONAL)
NOTE: TENANT AND DESIGN
121110
J
LT-1627 LOD
1127 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
GROUND LEVEL FLOOR PLAN
2026016
04/03/2026
LT-1627
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
LT-1627 COFFEE (NATIONAL)
111098
J
OVERSIZED BAG ROOM
LT
-2
3-
E
LT
-2
ELECTRICAL
MOP SINK
COMMUNITY TABLES
M E
Z Z
A N
IN
E
A B
O V
E
'-1
/2
LT-2571 LOD
542 SF 9'
-0
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
5/12/26
LT-2571
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
T R
U E
N O
R T
H
LT-2571 NEWS & CONVENIENCE
WITH BREWED COFFEE
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
E-2404
CONCOURSE E
CONCEPT: F&B
752 SF
E-2437
CONCOURSE E
CONCEPT: F&B
3018 SF
LT-2156
MAIN TERMINAL
CONCEPT: F&B
1456 SF
E-2240
CONCOURSE E
CONCEPT: NEWS
1522 SF
LT-2351
MAIN TERMINAL
CONCEPT: NEWS
1537 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2604, TERMINAL 1
2026016
04/16/26
CAA
CA
CB
8-E9-E10-E11-E
E-2230 LOD
1522 SF
MECH
ELEV
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/01/26
E-2230
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
E-2230 NEWS & CONVENIENCE
STORE WITH STRONG RETAIL
NOTE: TENANT AND DESIGN
CB
26-E 25-E 24-E
E-2404 LOD
752 SF
FIRE VALVE ROOM
SHAFT
9' -1
1"
7"
A
LI
G N
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/15/26
E-2404
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
E-2404 QUICK-SERVICE
RESTAURANT - JUICE / SNACKS
NOTE: TENANT AND DESIGN
CD
CDD
28-E29-E30-E
CF
CE
E-2437 LOD
3018 SF
2' -3
5'-9"
2' -3
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
E-2437
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
TRUE N
ORTH
E-2437 MARKET & BAR
NOTE: TENANT AND DESIGN
G
LT-2156 LOD
1456 SF
FUTURE MAC SEATING
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/30/26
LT-2156
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2156 BAR & RESTAURANT (LOCAL)
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
NOTE: VERIFY ABOVE AND BELOW
15'-0" 26'-6"
5' -8
4'
-8
'-0
" LT-2351 LOD
1537 SF
ELECTRICAL
20 21
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2351
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2351 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
E-2307
CONCOURSE E
CONCEPT: F&B
1214 SF
C-2573
CONCOURSE C
CONCEPT: F&B
1846 SF
E-2230
CONCOURSE E
CONCEPT: F&B
3461 SF
LT-2318
MAIN TERMINAL
CONCEPT: F&B
2801 SF
LT-2237
MAIN TERMINAL
CONCEPT: F&B
1165 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2605, TERMINAL 1
2026016
04/16/26
C80 C81 C82 C83
CT
CU
CV
C-2573 LOD
1846 SF
CEILING
SOFFIT
ABOVE
CEILING
SOFFIT
ABOVE
LEASE LINE FOR FLOOR
FINISHES AND VERTICAL
CONSTRCTION
EXTENT OF POTENTIAL SEATING
AREA (SHOWN DASHED).
NO HARD BUILT STRUCTURE
ALLOWED
TRAM STOP
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/01/26
C-2573
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
TRUE NORTH
C-2573 MARKET & BAR
NOTE: TENANT AND DESIGN
CAA
CB
11-E12-E13-E14-E15-E16-E
E-2240 LOD
3461 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/01/26
E-2240
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
TRUE N
ORTH
E-2240 FULL-SERVICE
RESTAURANT & BAR (LOCAL)
NOTE: TENANT AND DESIGN
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
E-2307
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
E-2307 QUICK-SERVE RESTAURANT
(LOCAL OR NATIONAL)
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
16-E17-E18-E
CC
CD
E-2307 LOD
1214 SF
G
LT-2237 LOD
1165 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/30/26
LT-2237
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2237 QUICK-SERVE
RESTAURANT (LOCAL)
NOTE: TENANT AND DESIGN
C
D
LT-2318 LOD
2801 SF
FUTURE MAC SEATING
FUTURE MAC SEATING
TENANT ACCESS
RIGHT OF WAY
BUILDING EXPANSION JOINT
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2318
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2318 FULL SERVICE
RESTAURANT & BAR (LOCAL)
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
LT-2251
MAIN TERMINAL
CONCEPT: RETAIL
612 SF
A-1010
CONCOURSE A
CONCEPT: NEWS
585 SF
LT-2344
MAIN TERMINAL
CONCEPT: RETAIL
2620 SF
F-2310
CONCOURSE F
CONCEPT: COFFEE
2056 SF
D-2060
CONCOURSE D
CONCEPT: NEWS
704 SF
F-2170
CONCOURSE F
CONCEPT: NEWS
941 SF
LT-2323
MAIN TERMINAL
CONCEPT: RETAIL
1011 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2606, TERMINAL 1
2026016
04/16/26
AC.5
C203C202
A-1010 LOD
585 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/15/26
A-1010
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
A-1010 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
E-DD-D
D4
D-2060 LOD
704 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
D-2060
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
D-2060 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
BD
7-F8-F
F-2170 LOD
941 SF
10'-6"
5"
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/31/26
F-2170
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2170 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
BD
21-F22-F23-F
F-2310 LOD
2056 SF
4"
8"
2"
BDD
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/31/26
F-2310
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2310 COFFEE (NATIONAL)
NOTE: TENANT AND DESIGN
G
LT-2251 LOD
612 SF
TR
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2251
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2251 BEAUTY &
WELLNESS (NATIONAL)
NOTE: TENANT AND DESIGN
'-0
LT-2323 LOD
1011 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2323
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2323 OUTDOOR LIFESTYLE RETAIL
NOTE: TENANT AND DESIGN
D
LT-2344 LOD
2,620 SF
FUTURE MAC SEATING
FUTURE MAC
SEATING
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2344
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H LT-2344 BOOKS & COFFEE (LOCAL)
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
LT-2175
MAIN TERMINAL
CONCEPT: SPA/SLEEP
1107 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2607, TERMINAL 1
2026016
04/16/26
G
LT-2175 LOD
1107 SF
BUILDING EXPANSION JOINT
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
03/30/26
LT-2175
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2175 SPA / SLEEP
(LOCAL OR NATIONAL)
NOTE: TENANT AND DESIGN
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
C-2836
CONCOURSE C
CONCEPT: COFFEE
1097 SF
C-2160
CONCOURSE C
CONCEPT: F&B
752 SF
E-2283
CONCOURSE E
CONCEPT: COFFEE
980 SF
G-2390
CONCOURSE G
CONCEPT: F&B
4298 SF
LT-2120
MAIN TERMINAL
CONCEPT: F&B
3362 SF
E-2454
CONCOURSE E
CONCEPT: NEWS & CONVENIENCE
1102 SF
G-2454
CONCOURSE G
CONCEPT: NEWS
1494 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2608, TERMINAL 1
2026016
04/16/26
DA
DB
C32 C33
C-2160 LOD
752 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
C-2160
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
C-2160 SNACK
NOTE: TENANT AND DESIGN
C103 C104 C105
-K
-N
C
LE
A R
6' -0
C-2836 LOD
1097 SF
CLEAR
6'-0"
-K.5
ELECTRICAL
TR
4' -1
0"
C-2842.01
461 SF
C
LE
A R
C
IR
C U
LA
T
IO
N
'-0
1' -0
6'-11"
8' -6
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/01/26
C-2836
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
C-2836 COFFEE
NOTE: TENANT AND DESIGN
14-E15-E
CD
CDD
E-2283 LOD
980 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
E-2283
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
E-2283 COFFEE (NATIONAL)
NOTE: TENANT AND DESIGN
28-E29-E30-E31-E
E-2454 LOD
1102 SF
ELEV
STAIR
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
E-2454
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
E-2454 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
L.5-G M-G M.5-G N-G
11A-G
10A-G
9A-G
9.1A-G
G-2390 LOD
4298 SF
ELEC
SHAFT
RAMP DN
STERILE CORRIDOR
ELECTROCHROMIC AND
SOLARA GLAZING
FULL HEIGHT GLASS WALL -
SOUTH FACING EXTERIOR
VIEW OPPORTUNITY
OPEN TO
GATEHOLD
SEATING
835'-6"836'-6"
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
G-2390
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
TRUE NORTH
G-2390 FULL-SERVICE
RESTAURANT & COFFEE
NOTE: TENANT AND DESIGN
10A-G
9A-G
9.1A-G
9.2A-G
S.5-GS-G
G-2454 LOD
1494 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
05/13/26
G-2454
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
TRUE NORTH
G-2454 NEWS & CONVENIENCE
WITH STRONG RETAIL
NOTE: TENANT AND DESIGN
D
B.1
LT-2120 LOD
3362 SF
FUTURE SERVICE CORRIDOR
C
LE
A R
6' -8
STAIR
FUTURE MAC
SEATING
FUTURE MAC
SEATING
FUTURE MAC
SEATING
TENANT ACCESS
RIGHT OF WAY
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/13/26
LT-2120
METROPOLITAN AIRPORTS COMMISSION
0' 8' 16' 32'
SCALE: 1/16"=1'-0"SCALE: 1/16"=1'-0"
T R
U E
N O
R T
H
LT-2120 MARKET & BAR
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
NOTE: VERIFY ABOVE AND BELOW
G14
G3 G5
G4
F11F13
G1
G2
F14
F10 F8
F12
F16
F15 F2
F6 F4
G10
G6 G7 G11 G12 G9 G13
E1
F1F3 F7F9 F5
E7 E3
E5
G20 G15 G17 G18
G19
G21
G22
C10C9C8 C7C6
E2
E15
E16 E4 E8
E14 E10 E6
E12 D2 C4
D1
C1 C3C2 C5
D3 D6D5D4
C11 C16
C13 C17
C22 C24
C14C12 C15 C21
C19
C20 C23
A3
B14
A9
C25
A4A2 A6 A8A7
B4B2 B10B8B6 B12
A13A11 A12 A14
B16
B15
MAIN
TERMINAL
GREEN
PARKING
GOLD
PARKING
BLUE
PARKING
RED
PARKING
C26 C27
USPS AIRPORT MAIL
CENTER
CD
A
B
E
F
G
EAST
CURBSIDE
HOTELSILVER
PARKING
D-2092
CONCOURSE D
CONCEPT: F&B
2191 SF
E-2390
CONCOURSE E
CONCEPT: F&B
1165 SF
F-2154
CONCOURSE F
CONCEPT: F&B
1246 SF
D-2098
CONCOURSE D
CONCEPT: F&B
2773 SF
LT-2260
MAIN TERMINAL
CONCEPT: F&B (ETHNIC / MEDITERRANEAN)
1001 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2609, TERMINAL 1
2026016
04/16/26
H-DG-D
D4
D3
D2
D-2092 LOD
2191 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
D-2092
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
D-2092 QUICK-SERVE RESTAURANT -
CHICKEN (NATIONAL)
NOTE: TENANT AND DESIGN
H-DG-D
D2
D1
DA
DB
C7 C8 C9
D-2098 LOD
2773 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/02/26
D-2098
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
D-2098 CASUAL DINING - LATIN
NOTE: TENANT AND DESIGN
25-E 24-E 23-E
E-2390 LOD
1165 SFA
LI
G N
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/15/26
E-2390
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE NORTH
E-2390 QUICK SERVICE
RESTAURANT - SANDWICH
NOTE: TENANT AND DESIGN
6-F 5-F 4-F
BC.5
BD
F-2154 LOD
1246 SF
9'-6"
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
F-2154
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
TRUE N
ORTH
F-2154 QUICK SERVICE
RESTAURANT - HEALTHY
NOTE: TENANT AND DESIGN
D
LT-2260 LOD
1001 SF
26'-0" 9'
-9
FUTURE MAC SEATING
8'-6"
RESERVED OVERHEAD RIGHT
OF WAY, CONFIRM REQUIREMENTS
WITH OWNER THROUGH MAC
KITCHEN SPACE (LT-2278)
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/03/2026
LT-2260
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
T R
U E
N O
R T
H
LT-2260 QUICK SERVICE
RESTAURANT - ETHNIC /
MEDITERRANEAN (NATIONAL)
NOTE: TENANT AND DESIGN
PROFESSIONALS TO FIELD VERIFY
DIMENSIONS AND SPACE
NOTE: VERIFY ABOVE AND BELOW
HT-2184
TERMINAL 2
CONCEPT: NEWS & CONVENIENCE
606 SF
HT-2200
TERMINAL 2
CONCEPT: COFFEE (NATIONAL),
MARKET, AND BAR
10,663 SF
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
BATCH 2610 TERMINAL 2
2026016
04/16/26
HT-2184 LOD
606 SF
18. 19. 20.
F.
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/15/26
HT-2184
METROPOLITAN AIRPORTS COMMISSION
0' 5'-4" 10'-8" 21'-4"
SCALE: 3/32"=1'-0"
HT-2184 NEWS & CONVENIENCE
NOTE: TENANT AND DESIGN
DIMENSIONS AND SPACE TRUE NORTH
19. 20. 21. 22. 23. 24.
B.
D.
E.
HT-2200 LOD
10,663
PROJECT
TITLE
COMM NO
DATE
DRAWING NO
C o p y ri g h t
A lli ia n
St. Paul, MN 55111 612.726.9012
2026 CONCESSION PLANNING STUDY
MAIN LEVEL FLOOR PLAN
2026016
04/16/26
HT-2200
METROPOLITAN AIRPORTS COMMISSION
0' 16' 32' 64'
SCALE: 1/32"=1'-0"
HT-2200 COFFEE (NATIONAL),
MARKET, AND BAR
NOTE: TENANT AND DESIGN
DIMENSIONS AND SPACE TRUE NORTH
| Sheets |
| G-100 - ARRIVALS LEVEL PLAN |
| G-101 - DEPARTURES LEVEL - MAIN MALL PLAN |
| G-102 - D CONCOURSE - MAIN LEVEL PLAN |
| G-103 - C CONCOURSE - MAIN LEVEL PLAN |
| G-104 - A CONCOURSE - MAIN LEVEL PLAN |
| G-105 - E CONCOURSE - MAIN LEVEL PLAN |
| G-106 - F CONCOURSE - MAIN LEVEL PLAN |
| G-107 - G CONCOURSE - MAIN LEVEL PLAN |
| G-108 - TERMINAL 2 - MAIN LEVEL PLAN |
File details come from the government source that posted it. Updated .