The file's text, extracted by GovTribe without its formatting.
Channel Islands National Park
Solicitation #140P2019R0011 Scorpion Pier Replacement
CHIS-174534
REQUEST FOR PROPOSAL
(RFP)
Proposal Submission Package
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
For Technical Volume I:
1. Past Performance Questionnaire
2. Proposed Equals
3. Hazardous Materials Identification Listing
PAST PERFORMANCE QUESTIONNAIRE
INSTRUCTIONS: Offeror to complete Sections A and B and transmit questionnaire to reference.
Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E.
A. CONTRACTOR INFORMATION
| Point of Contact |
| Name, Email, Phone |
B. CONTRACT INFORMATION
| Contract Number |
| XXXXXXXXXX |
| Contract Type |
| Firm Fixed Price / Time & Materials / Cost Reimbursable / Other |
| Awarded Contract Price |
| $X,XXX,XXX |
| Current / Final Price |
| $X,XXX,XXX |
| Contract Award Date |
| XX/XX/XXXX |
| Contract Completion Date |
| XX/XX/XXXX |
| Period of Performance |
| XX/XX/XXX – XX/XX/XXX |
| Project Location |
| Park or Street address, City, State |
| Brief description of the contract & work effort: |
| Scope of work description |
C. REFERENCE:
| Organization |
| Agency or Company |
| Phone Number |
| XXX-XXX-XXXX |
D. EVALUATION
| Exceptional |
| Performance met contractual requirements and exceeded many to the owner’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance met contractual requirements and exceeded some to the owner’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Quality
| Quality of workmanship (including subcontractors)? |
| Choose an item. |
| Quality of and adherence to quality control plan? |
| Choose an item. |
| Quality of informational and technical submittals? |
| Choose an item. |
| Overall Quality Rating |
| Choose an item. |
| Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.): |
Schedule (& Time Management)
| Met project schedule milestones? |
| Choose an item. |
| Responded to owner requests in a timely manner? |
| Choose an item. |
| Informational and technical submittals submitted timely? |
| Choose an item. |
| Promptly addressed scheduling issues? |
| Choose an item. |
| Overall Schedule (& Time Management) Rating |
| Choose an item. |
| Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.): |
Cost Control
| Addressed differing & unforeseen site conditions so as to minimize additional costs? |
| Choose an item. |
| Provided fair and reasonable pricing for contract modifications? |
| Choose an item. |
| Submitted accurate and complete invoices? |
| Choose an item. |
| Promptly paid subcontractors and suppliers? |
| Choose an item. |
| Overall Cost Control Rating |
| Choose an item. |
| Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.): |
Management
| General oversight by project manager and superintendent? |
| Choose an item. |
| Coordination with and control of subcontractors? |
| Choose an item. |
| Avoidance of accidents & safety violations? |
| Choose an item. |
| Addressed location factors (especially remote locations)? |
| Choose an item. |
| Maintained good working relationship with owner representatives? |
| Choose an item. |
| Demonstrated flexibility, innovativeness and cooperation in resolving potential problems? |
| Choose an item. |
| Overall Management Rating |
| Choose an item. |
| Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.): |
Small Business Subcontracting (& Labor Standards)
| Met regulatory and contractual labor standards? |
| Choose an item. |
| Successfully contracted with small and socio-economically disadvantaged businesses? |
| Choose an item. |
| Quality and adherence to applicable subcontracting plans? |
| Choose an item. |
| Overall Small Business Subcontracting (& Labor Standards) Rating |
| Choose an item. |
| Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.): |
Regulatory Compliance
| Met building and life safety codes? |
| Choose an item. |
| Overall Regulatory Compliance Rating |
| Choose an item. |
| Overall Recommendation: |
| Given what I know today about the contractor's ability to perform in accordance with the contract’s most significant requirements, I would recommend them for similar contracts: |
| Choose an item. |
| Overall Comments: |
E. RETURN:
| Title |
| Contracting Officer / Contract Specialist |
| Organization |
| National Park Service – Denver Service Center |
PROPOSED EQUALS
In accordance with provision 52.211-06, the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.
| Section No. |
| Paragraph No. |
| Product/Model No. |
| Proposed Product/Model No. |
| A. | By submitting the proposed equal, the contractor certifies that it: |
| 1. | Has investigated the proposed item and determined that it is equal or superior in all respects to that specified. |
| 2. | Will provide, as a minimum, the same warranties for the proposed item as for the item specified. |
| 3. | Has determined that the proposed item is compatible with interfacing items. |
| 4. | Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution. |
| 5. | Waives all claims for additional expenses that may be incurred as a result of the substitution. |
B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.
HAZARDOUS MATERIALS IDENTIFICATION LISTING
In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.
List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.
image1.wmf