Attach 1 - Anticipated Arrangement & Temporary Pile Plan

View the file

Other files

File Type Posted
B09_140P2019R0011_Amend_4_20190617_Final.pdf PDF
B09_140P2019R0011_Amend_3_20190606.pdf PDF
SF30_Amend2_140P2019R0011.pdf PDF
ATTACH_10_R3_Scorpion_Pier_Cert_34219WQ02_final.pdf PDF
ATTACH_11_Transmittal-Submittal__11_R-3_Gangway_Shop_Drawings.pdf PDF
Attach_8_Supplemental_Info-ScorpionPier_Geotechnical_Report_092418.pdf PDF
Attach_9_Supplemental_Info-ScorpionPier_Archaeological_Testing__Report__Final_8-10-17.pdf PDF
Attach_3_RVSD_SPEC_01_35_13.22_-_Archaeological_Protection_Addendum1_05-21-2019.pdf PDF
Attach_6_Supplemental_Info-CD-0004-17_Conditional_Concurrence_and_Adopted_Findings.pdf PDF
Attach_5_Supplemental_Info-Tech_Report-Scorpion_Pier_Coastal_Engr_Analysis__03-15-11.pdf PDF
140P2019R0011_Amend_1_20190524.pdf PDF
Attach_4_RVSD_SPEC_01_50_00_-_Temporary_Facilities_and_Controls_Addendum1_05-21-2019.pdf PDF
Attach_2_Existing_Asbuilts.jpeg JPEG file
Attach_7_Supplemental_Info-PermitApplicationFile_ScorpionPier.pdf PDF
B08_Attach_4_Proposal_Submisison_Pkg_Vol_I.docx DOCX document
B08_Attach_7_100_Percent_Structural_Design_Calcs_040319.pdf PDF
B08_Solit_140P2019R0011_SF_1442_&_Clauses.pdf PDF
B08_Attach_1_Specifications_100_Pct_05-03-2019.pdf PDF
B08_Attach_6_Geotech_Investigation_Report_073118_FINAL.pdf PDF
B08_Attach_2_DrawingSet_100Pct_20190402.pdf PDF
B08_Attach_5_Bonds_SF24-16.pdf PDF
B08_Attach_5_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attach_5_Proposal_Submisison_Pkg_Vol_II.docx DOCX document
B08_Attach_3_DOL_Wage_Determ_CA15.pdf PDF
B08_Attach_5_ContractPriceSchedule.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

0 40

Feet

LEGEND:

Permanent Pile

Temporary Construction Pile

(12 ea, 18" dia, 3/4" thick)

Publish Date: 2018/09/27 5:06 PM | User: rrazonable

Filepath: H:\AutoCAD Project Files\_Projects\1422-FFA NPS_ PWR-SF SEA MABO\Scorpion Pier-Planning\1422-RP-001 Temporary Pile Plan.dwg AQ-B-Land

Privileged and Confidential | Attorney Work Product | Prepared at Request of Counsel

Figure 1

Temporary Construction Piles

P r o p o s e d

P i e r

Pier Approach Roadway

Existing Road

O c e a n

R n g e r

I s l a d

P c k e r s

Elev: +17.40' MLLW

Pier Elev: +14.10' MLLW

Elev: +7.85' MLLW

12'

SOURCE: Topo survey from B Carr Surveys dated 10-13-2016 and bathy survey recieved from Ashton dated 12-21-2010.

HORIZONTAL DATUM: NAD83, California State Plane, Zone V, U.S. Feet.

VERTICAL DATUM: Mean Lower Low Water (MLLW).

Scorpion Pier Replacement

Fiberglass Fender Piles

Crushed Aggregate

Base Finished Surface

Steel Sheet Piles

Rock Revetment Slope

Protection

Timber Decking

Gangway Platform

Lift Platform

I s l a n d

P a c k e r s

O c e

R n g e r

Truck and Crane

Relocated Aluminum

Gangway From

Existing Pier

18"∅ Pile In Casing (typ)

Pier Support Pile (Typ)

AutoCAD SHX Text -15.0

AutoCAD SHX Text -10.0

AutoCAD SHX Text -5.0

AutoCAD SHX Text 0.0

AutoCAD SHX Text -14.0

AutoCAD SHX Text -13.0

AutoCAD SHX Text -12.0

AutoCAD SHX Text -11.0

AutoCAD SHX Text -9.0

AutoCAD SHX Text -8.0

AutoCAD SHX Text -7.0

AutoCAD SHX Text -6.0

AutoCAD SHX Text -4.0

AutoCAD SHX Text -3.0

AutoCAD SHX Text -2.0

AutoCAD SHX Text -1.0

Sheets and Views
AQ-B-Land
PLOT

File details come from the government source that posted it.