1282D719R002_-_Saratoga_Bunkhouse_Construction.pdf

PDF 921 KB Posted

Attached to
Bunkhouse Construction - Saratoga, WY
Solicitation number
1282D719R0002
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Mod_3_Conformed.pdf PDF
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Return_Form_-_Mod_3.pdf PDF
1282D719R0002_-_Mod_3.pdf PDF
Attachment_2_-_Bunkhouse_Specs_-_Mod_3.pdf PDF
Attachment_1_-_Bunkhouse_Drawings_-_Mod_3.pdf PDF
Questions_and_Answers_-_V2.pdf PDF
Questions_and_Answers.pdf PDF
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Return_Form_-_Mod_2.pdf PDF
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Mod_2_Conformed.pdf PDF
1282D719R0002_-_Mod_1.pdf PDF
1282D719R0002_-_Mod_2.pdf PDF
Attachment_7_-_Geotechnical_Engineering_Study.pdf PDF
Pre-Bid_Sign-In_Sheet.pdf PDF
Pre-Proposal_Conference_Slides.pdf PDF
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Mod_1.pdf PDF
Pre-Bid_Photos.pdf PDF
Attachment_8_-_Water_Main_and_Sewer_Submittal.pdf PDF
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Return_Form_-_Mod_1.pdf PDF
Attachment_2_-_Bunkhouse_Specs.pdf PDF
Attachment_6_-_Perfomance_Certification.docx DOCX document
Attachment_5_-_Section_K_to_Return.docx DOCX document
Attachment_4_-_Experience_Questionaire.docx DOCX document
1282D719R002_-_Saratoga_Bunkhouse_Construction_-_Return_Form.pdf PDF
Attachment_1_-_Bunkhouse_Drawings_-_updated.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

941183

MEDICINE BOW NATIONAL FOREST

2468 JACKSON ST

ATTN ROBERT HALL

LARAMIE WY 82070

ATTN: Robert Hall - robert.e.hall@usda.gov

900 Grand Ave Glenwood Springs, CO 81601

ROBERT HALL 970-945-3217

1x 02/15/2019

1282D719R0002

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This project consists of the construction of a 2300 square foot, 10-person bunkhouse, appliances, a covered porch, site utilities for water, sewer, gas, power and telecommunications. Optional items include additional appliances, air conditioning, parking lot paving, three (3) RV trailer pads and on-site parking, as well as parking for fleet vehicles. The Government estimates the rough order of magnitude of this project to be between $500,000 to $1,000,000.

The pre-bid conference will be held on Wednesday, March 13, 2019 - 1:00 PM (local time) - Brush Creek/Hayden RD Office - 2171 WY-130, Saratoga, WY 82331. Send an email RSVP to robert.e.hall@usda.gov if you plan to attend.

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort.

No award will be made under this solicitation until funds are available. The

Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the

Government has no obligation to reimburse an offeror for any costs.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

30 365 calendar days and complete it within ________________ ________________ calendar days after receiving

03/31/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

WHITE RIVER NATIONAL FOREST

900 GRAND AVENUE

GLENWOOD SPRINGS CO 81602-0948

82D7

BARBARA K. DARLING

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

SUB:

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 44

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

1282D719R0002

Medicine Bow Routt NF - Saratoga Bunkhouse Phase

II (Construction)

This is a request for proposals for construction of a bunkhouse as specified in the Attachments listed in Section J.

Contracting Officer: Supervisory Contracting

Officer Barbara Darling -barbara.darling@usda.gov - 605-673-9355

Contracting POC: Contracting Specialist Robert

Hall - robert.e.hall@usda.gov - 970-945-3217

Project Manager/COR: North Zone Engineer Jacob

Brown - jacob.w.brown@usda.gov- 307-745-2436

Delivery: 05/31/2020

Delivery Location Code: 8512

USDA FOREST SERVICE

BRUSH CREEK HAYDEN RD

P O BOX 249

SARATOGA WY 82331-0249 US

FOB: Destination

Period of Performance: 06/01/2019 to 05/31/2020

001 Saratoga Bunkhouse Construction

Product/Service Code: Y1FZ

Product/Service Description: CONSTRUCTION OF

OTHER RESIDENTIAL BUILDINGS

See Schedule of Items - Section B

- Base Items 1 - 7

- Optional Items 1 - 8

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Table of Contents

SECTION B--SCHEDULE OF ITEMS

SECTION C-- STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS

SECTION D--PACKAGING AND MARKING

SECTION F--DELIVERIES OR PERFORMANCE

SECTION G--CONTRACT ADMINISTRATION DATA

SECTION H--SPECIAL CONTRACT REQUIREMENTS

SECTION I--CONTRACT CLAUSE

SECTION—J--LIST OF ATTACHMENTS

SECTION—K--REPRESENTATIONS, CERTIFICATIONS

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

SECTION M--EVALUATION FACTORS FOR AWARD

PART I—THE SCHEDULE -

SECTION B--SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - SARATOGA BUNKHOUSE

Description

Method of

Measure

Unit Qty Unit Price TOTAL Items

1 General Requirements L.S.Q LS Job

Quality Control, Survey and

Staking L.S.Q LS Job

Bunkhouse Site Improvements, Grading, parking lot construction, and Identification

Signs

L.S.Q LS Job

Water and Sewer Lines and

Appurtenances, Service to

Building

L.S.Q LS Job

Natural Gas, Electrical, And

Telephone

Service to Building

L.S.Q LS Job

6 Bunkhouse Building L.S.Q LS Job

7 Appliances L.S.Q LS Job

TOTAL BASE

ITEMS

Optional

Items Description

Method of

Measure

Unit Qty Unit Price TOTAL

1 Site Demolition L.S.Q LS Job

2 Additional Appliances L.S.Q LS Job

3 Paving Bunkhouse Parking L.S.Q LS Job

4 Fleet Parking L.S.Q LS Job

RV pad #1 (1 total), utilities, post and shutoff L.S.Q LS Job

RV pad (#2), utilities, post and shut-off L.S.Q LS Job

RV pad (#3), utilities, post and shut-off L.S.Q LS Job

8 Bunkhouse air conditioning L.S.Q LS Job

TOTAL OPTIONAL ITEMS

B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under General Requirements.

SECTION C-- STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS

C-1. Description of Work

This project consists of construction of a new single-story 2300 square foot, 10-personbunkhouse, appliances, a covered porch, site utilities for water, sewer, gas, power and telecommunications. Optional items include additional appliances, air conditioning, parking lot paving, three (3) RV trailer pads and on-site parking, as well as parking for fleet vehicles.

C-2. Project Location

This project is located on the Brush Creek/Hayden Ranger District in Saratoga, WY.

C-3. Government Furnished Material

None

C-3. General Specifications

Codes and Specifications: All materials and installations will comply with the current International Building Code, local city and county building code requirements, manufacturer’s instructions and these specifications.

Quantities: Contractor is responsible for calculating and determining all quantities for bidding.

Work Restrictions: Construction site will be left in a neat, clean and safe condition at the end of each day’s work. .

Storage of equipment and materials will be confined to the area approved by the CO/COR

Schedule: Work is expected to begin as soon as practical on or about June 1, 2019 and be complete in accordance with the schedule provided by the contractor. We expect the building to be dried in prior to winter with ongoing inside work during the inclement weather. The completion time is a negotiable item.

Permits: The contractor will be required to secure any required building permits in accordance with the rules and regulations of Carbon County, CO and/or the town of Saratoga, WY if applicable..

C-3. Technical Specifications by Bid Item – See Attachment 1 and 2

Work: Furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, carrying out all duties and obligations imposed by the contract on the Contractor.

Measurement and Payment: For each individual item listed here and in the Schedule of Items, payment will be full compensation for all work related to the particular item in accordance with the Attachments in Section J. Method of

Measurement for Payment will be Lump Sum Quantities (L.S.Q) which denote one complete unit of work as described in the contract including necessary materials, equipment, and labor to complete the job. They will be measured complete and in-place.

C-4. AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Drawings/FFE/Product Specifications referenced in Section J.

C-5. AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

None

SECTION E--INSPECTION AND ACCEPTANCE

E-1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: : www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause

Number

Title Date

52.246-12 Inspection of Construction AUG 1996

E-2. AGAR 452.246-70 Inspection and Acceptance (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

http://www.acquisition.gov/far/

SECTION F--DELIVERIES OR PERFORMANCE

F-1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.arnet.gov/far/

FAR: www.acquisition.gov/far/

Clause

Number

Title Date

52.242-14 Suspension of Work APR 1984

F-2. FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the

Contractor receives the notice to proceed. Contract time will be a minimum of 365 days. The time stated for completion shall include final cleanup of the premises. The actual final completion date will be determined in discussions and will be based on the assumption that the successful offeror will receive the notice to proceed by May 1, 2019.

F.3 REQUIRED SUBMITTALS

http://www.arnet.gov/far/

The following is a general summary of the required submittals. Other submittals are required as specified elsewhere in this contract.

Title Reference. When Required

Schedule of Work Section F When proposals are due and updated prior to NTP.

Bio-based and Recovered Materials Requirements Section I When proposals are due

Job Specific Safety Plan Section H Prior to Notice to

Proceed

Copy of Required Insurance coverage

Section H Prior to Notice to

Proceed

Notification of starting work

Subcontracting

Section G Prior to subcontractor

Release of Claims Form Section I Prior to final payment

Material Certifications, Section C Prior to on-site work

Testing Reports & Other required

Submittal

Specifications item installation or as per Division

Submittal requirements for this Project are EXTENSIVE. They include, but are not limited to: Biobased and

Recovered materials requirements, Product Data, Product Schedules, Traffic Control, Shop Drawings, Mock-ups, Samples, Material Certifications, Testing Reports, Record Drawings, Operation & Maintenance Manuals, Commission Reports, and Warranties. Individual Sections in the specifications detail most, but not all, submittals requirements for this contract. Other submittals requirements may be contained in the Drawings or otherwise referenced. It is the contractor’s responsibility to capture all the required submittals, shop drawings, certifications, testing reports, etc., as required for this Project, and develop a Submittal Schedule for approval by the Contracting

Officer as described in Section 01 3300 Shop Drawings, Product Data, and Submittals. See Submittal list in Section

01 3300.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1. AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and as soon as possible or within 14 days after the date of contract award. The conference will be held at mutually agreed upon location. This meeting is also referred to as the Pre-work Meeting.

G-2. Work Progress Schedule

The Contractor shall be required to present on the solicitation due and at the pre-work conference a written plan of work providing for the orderly and timely completion of the contract requirements. This plan is subject to the approval of the Contracting Officer. The schedule may be modified in writing during the course of the contract when conditions warrant it.

If the work progress falls behind schedule, the Contractor shall take such action as necessary to ensure that the timely completion of the contract is not jeopardized. In addition, the Contracting Officer may require the Contractor to submit a revised plan of work showing how he intends to complete the project on time and in compliance with all contract requirements

G-3. Contract Release

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $XXXXXXX, Contractor hereby releases the

United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations:______________"

G-4. Invoices and Payments

All invoices are to be submitted via the electronic Invoice Processing Platform (IPP) System. The "Submit

Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in previous communications from USDA and Treasury.

This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm Ensure your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. Offeror must have an established account prior to commencement of work.

Invoice Processing Platform (IPP) does not allow for the contractor to change the description of the line items being invoiced against and therefore an itemized invoice must be uploaded as an attachment(s) in accordance with FAR

52.232-5 - Payments under Fixed-Price Construction Contracts (May 2014).

Itemized invoices shall include at a minimum:

Contractor Name & Address

Contract numbers

Invoice Number

Description and Line Item of Services or work completed

Date of services or completion.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

Percentage of Contract Completion

G-5. Forest Service Representative

Barbara Darling shall serve as the Procuring Contracting Officer (PCO) with Robert Hall as the Administrative

Contracting Officer (ACO) on this contract. The Contracting Officer has full warrant authority over all contract issues. The ACO can be reached at 970-945-3217 or robert.e.hall@usda.gov.

A Contracting Officer Representative (COR) will be appointed for this contract upon award. The COR delegated authority, responsibilities and contact information will be defined on a delegation letter issued after contract award.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1. FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

- As-built utility plans will be provided as soon as the current construction is completed.

H-2. AGAR 452.237-74 Key Personnel. (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel: CONTRACTOR

REPRESENTATIVE, FOREMAN/WOMAN, and QUALITY INSPECTOR.

(b) During the first ninely (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the

Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.

Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting

Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H-3. Safety

Pursuant to FAR 52.236-13 Accident Prevention Alt. I, the Contractor shall prepare a Safety Plan which addresses the specific hazards of the work site, and shall include working in construction areas and asbestos abatement, and that employees meet all OSHA requirements. The Contractor shall identify the specific conditions that are considered to be hazardous.

The Contractor shall submit the safety plan shall within 10 calendar days after award of contract.

The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will do to increase safety on the worksite. Contractor’s operations shall facilitate Forest Service’s safe and practical inspection of

Contractor’s operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment. The Contracting Officer’s

Representative (COR) has the authority to immediately suspend performance in the event that a safety of life issue is encountered on the work site.

PART II--CONTRACT CLAUSES and PROVISIONS

SECTION I--CONTRACT CLAUSE

I-1. FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.acquisition.gov/far/

52.203-5 Covenant against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (May 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (Oct 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirements (Apr 2014) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements on Statements--

Representation (Jan 2017) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011) 53.204-7 System for Award Management (Oct 2018) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016) 52.204-17 Ownership or Control of Offeror (July 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-20 Predecessor of Offeror (July 2016) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and

Other Covered Entities (2018).

52.209-2 Prohibition on Contracting With Inverted Domestic Corporations--Representation (Nov 2015) 52,209-5 Certification Regarding Responsibility Matters (Oct 2015) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for

Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

(Feb 2016) 52.210-1 Market Research (Apr 2011) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.217-7 Option for Increased Quantity - Separately Priced Line Item ( 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) 52.219-8 Utilization of Small Business Concerns (NOV 2016) 52.219-14 Limitations on Sub-Contracting (Jan 2017) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Work Hours and Safety Standards – Overtime Compensation (May 2018) 52.222-5 Construction Wage Requirements – Secondary Site of the Work (May 2014) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988)

52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-25 Minimum Wages under Executive Order 13658 (Dec 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (Oct 2015) 52.222-37 Employment Report on Veterans (Feb 2016) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages under Executive Order 13658 (DEC 2015) 52.222-62 Paid Sick Leave under Executive Order 13706 (Jan 2017) 52.223-1 Bio based Product Certification (May 2012) 52.223-2 Affirmative Procurement of Bio-based Products under Construction Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (Dec 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Construction Contracts (Aug 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.223-21 Foams (Jun 2016)52.225-9 Buy American – Construction Materials (MAY 2014) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (Jan 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds – Construction (Oct 2010) 52.229-3 Federal, State, and Local Taxes (Feb 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest Charges 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018)) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equip, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) – See specifications for use of utilities 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (Apr 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.236-28 Preparation of Proposal-Construction (Oct 1997) 52.242-14 Suspension of Work (Apr 1984) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (NOV 2017) 52.245-1 Government Property (Jan 2017) 52.246-12 Inspection of Construction (AUG 1996) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2015)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996)

452.236-72 Use of Premises (NOV 1996)

452.236-76 Samples and Certificates (FEB 1988)

452.236-77 Emergency Response (NOV 1996)

I-2. FAR 52.211-13 – Time Extensions (Sept 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered.

(End of Clause)

I-3. FAR 52.217-7 – Option for Increased Quantity – Separately Priced Line Item (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the

Contractor before contact completion. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of Clause)

I.4. FAR 52.222-36 – Equal Opportunity for Workers with Disabilities. (Jul 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR

60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of

$15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract

Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

I-5. FAR 52.225-9 -- Buy American–Construction Materials (May 2014)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the

Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the

Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

(End of Clause)

I-6. FAR 52.225-10 Notice of Buy American – Construction Materials (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at

FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

I-7. FAR 52.228-1 -- Bid Guarantee (Sep 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The

Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $N/A, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

(End of Clause)

I-8. FAR 52.236-27 -- Site Visit (Construction) (Feb 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the

Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for

13 March 2019, 1:00 PM – 13:00

[Insert date and time]

(c) Participants will meet at –

Brush Creek/Hayden Ranger District office, 2171 WY-130, Saratoga, WY 82331

[Insert location]

I-9. FAR 52.252-6 Authorized Deviations in Clauses (FEB 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.

(b) The use in this solicitation or contract of any [insert regulation name] (48 CFR _____) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.

I-10. AGAR 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

(End of clause)

I-11. AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer’s Liability. The Contractor is required to comply with applicable Federal and

State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a Contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker’s compensation to be written by private carriers.

(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence

© Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and 500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the

Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and

$500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least

$200,000 multiplied by the number of seats or passengers, whichever is greater.

PART —I--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION—J--LIST OF ATTACHMENTS

Title Pages

1. Attachment 1 – Bunkhouse Drawings 59

2. Attachment 2 – Bunkhouse Specifications 428

3. Attachment 3 – Wage Determination – WY20170007 – 8/10/18 6

4. Attachment 4 - Contractor Experience Questionnaire 2

5. Attachment 5 – Representations and Certifications Fill in Forms

6. Attachment 6 – Payment Certification 1

PART—V--REPRESENTATIONS AND INSTRUCTIONS

SECTION—K--REPRESENTATIONS, CERTIFICATIONS

AND

OTHER STATEMENTS OF OFFERORS OR RESPONDENTS

K-1. FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Sep 2007) 52.222-38 Compliance with Veterans Employment Reporting Requirements (Feb 2016) 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction G

K2. FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2017)

READ THE HIGHLIGHTED PORTIONS FIRST! IF YOU ARE REGISTERED AND ACTIVE IN SAM, YOU

ONLY HAVE TO LIST ANY CHANGES AT PARAGRAPH d. Or if there are any changes, update your SAM registration before submitting your bid. For the ones you need to fill out and return, these have been put in

Attachment 4 so you don’t have to cut and paste or separate them.

(a)

(1) The North American Industry classification System (NAICS) code for this acquisition is 236220 –

Commercial and Institutional Building Construction

(2) The small business size standard is $36,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is

500 employees.

(b)

(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the

System for Award Management (SAM), and has completed the Representations and Certifications section of

SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[_] (i)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.