Attachment 9 - Addendum_01_Cover.pdf
PDF 218 KB Posted
- Attached to
- HVAC Repair Phase 2B, 3A, 3B Federal contract opportunity
- Solicitation number
- 1232SA26Q0056
About this file
This is an Addendum #1 to a solicitation for design services related to HVAC system replacement and associated upgrades at the Delta Branch National Research and Resource Center (DBNRRC) in Stuttgart, Arkansas. The addendum was issued on Thursday, March 5, 2026, by The Johnson • McAdams Firm P.A., an architectural and engineering firm based in Greenwood, Mississippi, with licensed architects Robin Henry, Jerry Martin, and Rebecca Palmer.
The addendum modifies the original specifications and drawings for Phase 2B, Phase 3A, and Phase 3B of the project. Specification changes include replacement of Section 01 00 11 (General Paragraphs) and Section 22 00 00 (Plumbing, General Purpose), both dated March 5, 2026. Drawing modifications include replacement of the G-002 Phasing Plan for all three phases (dated March 5, 2026) and addition of four new Phase 2B drawings: A-103 (Headhouse Reflected Ceiling Plan), MD104 (Headhouse Mechanical Piping Demo Plan), MP102 (Headhouse Mechanical Piping Plan), and M-603 (Headhouse Mechanical Schedules). The addendum contains a total of 17 eight-by-eleven-inch pages and 7 twenty-four-by-thirty-six-inch pages.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
108 WEST MARKET ST. P.O. BOX 513 GREENWOOD, MS 38935-0513 PHONE (662) 455-4943 FAX (662) 455-3381
Architects Licensed in Mississippi: Robin Henry, Jerry Martin, Rebecca Palmer
ADDENDUM #1
Thursday, March 5, 2026
Design New HVAC System and Associated Upgrades B001 & B001A
PHASE 2B, PHASE 3A, PHASE 3B
DBNRRC
Stuttgart, AR 72160
1. Addendum #1 contains 17 (8 x 11) and 7 (24 x 36) pages, including this Cover Sheet.
ADDENDUM #1, Thursday, March 5, 2026
Design New HVAC System and Associated Upgrades B001 & B001A
DBNRRC
Stuttgart, AR 72160
108 WEST MARKET ST. P.O. BOX 513 GREENWOOD, MS 38935-0513 PHONE (662) 455-4943 FAX (662) 455-3381
Architects Licensed in Mississippi: Robin Henry, Jerry Martin, Rebecca Palmer
Specifications:
1. Replace Section 01 00 11 for the Phase 2B specifications with the attached Section 01
00 11 GENERAL PARAGRAPHS, dated March 5, 2026.
2. Replace Section 22 00 00 for the Phase 2B specifications with the attached Section 22
00 00 PLUMBING, GENERAL PURPOSE dated March 5, 2026.
Drawings:
3. Replace Drawing G-002 for the Phase 2B drawings with the attached Drawing G-002
PHASE 2B PHASING PLAN, dated March 5, 2026.
4. Replace Drawing G-002 for the Phase 3A drawings with the attached Drawing G-002
PHASE 3A PHASING PLAN, dated March 5, 2026.
5. Replace Drawing G-002 for the Phase 3B drawings with the attached Drawing G-002
PHASE 3B PHASING PLAN, dated March 5, 2026.
6. Add Drawing A-103 PHASE 2B HEADHOUSE REFLECTED CEILING PLAN, dated March 5, 2026.
7. Add Drawing MD104 PHASE 2B HEADHOUSE MECHANICAL PIPING DEMO.
PLAN, dated March 5, 2026.
8. Add Drawing MP102 PHASE 2B HEADHOUSE MECHANICAL PIPING PLAN, dated March 5, 2026.
9. Add Drawing M-603 PHASE 2B HEADHOUSE MECHANICAL SCHEDULES, dated March 5, 2026.
END OF ADDENDUM #1
File details come from the government source that posted it. Updated .