Attachment 12 - Addendum-01_Phase-2B_Drawings_Combined.pdf

PDF 2 MB Posted

Attached to
HVAC Repair Phase 2B, 3A, 3B Federal contract opportunity
Solicitation number
1232SA26Q0056
Issued by
Department of Agriculture Agricultural Research Service

About this file

This document is a set of contract specifications and construction drawings for USDA facility renovation work focusing on Phase 2B headhouse mechanical and piping systems. The work involves removal and replacement of hydronic heating equipment, including hot water reheat coils and VAV (variable air volume) boxes, along with associated piping, insulation, and controls. The contractor must provide insulation on all new and existing piping within the work areas on chilled water supply/return, heating water supply/return systems, and maintain the building heating water system in operation throughout construction.

The contractor is required to coordinate all activities with the USDA contracting officer, maintain building occupancy in non-work areas, erect protective barriers and signage, provide a detailed work plan before commencing, and field-verify all existing conditions. Construction must proceed in strict phasing sequence: Phase 2A, Phase 2B Sequence 1, Phase 2B Sequence 2, Phase 3A, and Phase 3B, with each phase requiring complete work acceptance before the next phase begins. The contractor must protect existing light fixtures, fire alarm devices, and sprinkler heads from damage, temporarily covering them daily and removing coverings at end of workday or when the facility is unattended for more than four hours. All damaged systems, equipment, or components must be repaired or replaced at no cost to the government. Test and balance requirements apply to all heating coils and VAV boxes, and mechanical cleaning of the HVAC system must meet NADCA standards.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1A, 1B AND 1C (NOT IN CONTRACT):

PHASE 2A (NOT IN CONTRACT)

PHASE 2B SEQUENCE 2 (MAIN LAB BUILDING)

PHASE 3A (NOT IN CONTRACT)

PHASE 3B (NOT IN CONTRACT)

PHASE 2B SEQUENCE 1

(HEADHOUSE AND TWO GREENHOUSES)

PHASING LEGEND

A. ALL NON-WORK AREAS IN THE BUILDING WILL REMAIN OCCUPIED AND OPERATIONAL

DURING THE WORK. USDA WILL VACATE AREAS OF THE BUILDING WHERE WORK IS

BEING PERFORMED. THE CONTRACTOR MUST COORDINATE HIS/HER WORK

ACTIVITIES WITH THE CONTRACTING OFFICER TO AVOID CONFLICTS WITH FACILITY

OPERATIONS. THE CONTRACTOR MUST ERECT BARRIERS AND EMPLOY NECESSARY

MEASURES TO PROTECT PERSONNEL IN THE AREA FROM INJURY.

B. COVER AND PROTECT ALL FURNISHINGS AND EQUIPMENT REMAINING IN THE

SPACES.

C. THE CONTRACTOR MUST PROVIDE BARRIERS AND SIGNAGE TO SECURE THE WORK

AREAS, TO DIRECT PERSONNEL IN WAYFINDING, AND TO ENSURE THE SAFETY OF

BUILDING OCCUPANTS AND VISITORS. THE CONTRACTOR MUST PROVIDE A WORK

PLAN BEFORE BEGINNING THE WORK EXPLAINING AND ILLUSTRATING THE MEANS TO

BE IMPLEMENTED TO ALLOW THE BUILDING TO REMAIN OCCUPIED AND OPERATIONAL

DURING THE WORK. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSION AND

CONDITIONS BEFORE BEGINNING WORK.

D. CONTRACTOR MUST COORDINATE STAGING AREAS WITH USDA PERSONNEL.

E. THE HATCHED “AREA OF WORK” SHOWN ON THE PHASING PLAN INDICATES THE

PRIMARY RENOVATION LIMITS FOR EACH PHASE. WORK REQUIRED BY THE DRAWINGS

AND SPECIFICATIONS MAY EXTEND INTO ADJACENT AREAS OUTSIDE OF THE

HATCHED LIMITS (INCLUDING WORK ABOVE CEILINGS SUCH AS DUCTWORK, PIPING,

AND ASSOCIATED SYSTEMS). WHERE ACCESS IS REQUIRED IN THESE ADJACENT

AREAS, THE CONTRACTOR SHALL REMOVE AND REINSTALL CEILINGS AND FINISHES

AS NECESSARY TO PERFORM THE WORK AND SHALL RESTORE ALL AFFECTED AREAS

TO MATCH EXISTING CONDITIONS. ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS SHALL BE INCLUDED IN THE SCOPE OF THE RESPECTIVE PHASE

REGARDLESS OF WHETHER IT OCCURS STRICTLY WITHIN THE HATCHED AREA.

F. THE CONTRACTOR MUST COMPLETE ALL WORK ASSOCIATED WITH A GIVEN PHASE

PRIOR TO COMMENCEMENT OF WORK IN ANY SUBSEQUENT PHASE. WORK FOR A

NEW PHASE MUST NOT BEGIN UNTIL ALL WORK, TESTING, RESTORATION, AND

ACCEPTANCE REQUIREMENTS OF THE PREVIOUS PHASE ARE COMPLETE (NOTE:

PHASE 2B SEQUENCE 1 MAY BE CONSTRUCTED CONCURRENTLY WITH PHASE 2A.

PHASE 2B SEQUENCE 2 MAY BE CONSTRUCTED CONCURRENTLY WITH PHASE 2B

SEQUENCE 1. PHASE 2B SEQUENCE 2 MUST NOT COMMENCE UNTIL PHASE 2A IS

COMPLETED). THE REQUIRED ORDER OF CONSTRUCTION PHASING MUST BE AS

FOLLOWS:

PHASE 2A → PHASE 2B SEQUENCE 1→ PHASE 2B SEQUENCE 2→ PHASE 3A → PHASE 3B

G. DEVIATION FROM THE ESTABLISHED PHASING SEQUENCE MUST NOT OCCUR

WITHOUT PRIOR WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.

H. CONTRACTOR MUST REMOVE AND RETAIN LIGHT FIXTURES (NOT SHOWN DRAWING)

AS REQUIRED TO ACCOMMODATE THE REMOVAL AND REPLACEMENT OF HYDRONIC

HEATING EQUIPMENT AND PIPING INSULATION AS SHOWN ON THE MECHANICAL

DRAWINGS. CONTRACTOR MUST DISCONNECT AND SAFELY TERMINATE ALL CONDUIT

AND WIRING WITH APPROVED WIRE NUTS AND ELECTRICAL TAPE. FIXTURES MUST BE

PROTECTED FROM DAMAGE AND STORED FOR REINSTALLATION. UPON COMPLETION

OF PIPING AND INSULATION WORK, CONTRACTOR MUST REINSTALL ALL FIXTURES IN

ORIGINAL LOCATIONS AND VERIFY PROPER OPERATION. ANY FIXTURES OR

ASSOCIATED COMPONENTS DAMAGED DURING THIS WORK MUST BE REPAIRED OR

REPLACED IN KIND AT NO COST TO THE GOVERNMENT.

I. PRIOR TO THE START OF WORK EACH DAY IN ACTIVE CONSTRUCTION AREAS, THE

CONTRACTOR MUST TEMPORARILY PROTECT FIRE ALARM INITIATING AND

NOTIFICATION DEVICES AS WELL AS SPRINKLER HEADS (NOT SHOWN ON DRAWING)

FROM DUST, DEBRIS, AND DAMAGE USING APPROVED METHODS. ALL TEMPORARY

COVERINGS MUST BE REMOVED AT THE END OF EACH WORKDAY AND AT ANY TIME

THE FACILITY WILL BE LEFT UNATTENDED FOR MORE THAN FOUR (4) HOURS. FIRE

ALARM DEVICES AND SPRINKLERS IN OCCUPIED AREAS MUST NOT BE COVERED,

DISABLED, OR OBSTRUCTED. ANY DAMAGE TO EXISTING FIRE ALARM OR

SUPPRESSION SYSTEM COMPONENTS RESULTING FROM CONSTRUCTION ACTIVITIES

MUST BE REPAIRED OR REPLACED IN KIND BY THE CONTRACTOR AT NO ADDITIONAL

COST TO THE OWNER, AND THE SYSTEM MUST BE RESTORED TO FULL OPERATIONAL

STATUS PRIOR TO REOCCUPANCY OF AFFECTED SPACES.

GENERAL NOTES

PHASE 2B SEQUENCE 2

AREA OF WORK

PHASE 2B SEQUENCE 1

AREA OF WORK

Dylan Mitchell sam

HL-1

HL-3

HL-5

HL-6

HL-4

0 4' 8' 16'

SCALE: 3/16"= 1'-0"

2'

SCALE:

PHASE 2B HEADHOUSE

REFLECTED CEILING PLAN

3/16" = 1'-0"

A-103

KEY PLAN

N.T.S.

NORTH

AREA OF WORK PHASE 2B

SEQUENCE 1

LEGEND

CONTRACTOR MUST REMOVE EXISTING 24" x 24" SUSPENDED CEILING TILE AND GRID COMPLETE. RETAIN EXISTING HANGER WIRES FOR REUSE. INSTALL NEW 24" x 24" IN SAME PATTERN AND LOCATION AS EXISTING.

CONTRACTOR MUST REMOVE EXISTING GYPSUM BOARD CEILING SYSTEM AS REQUIRED TO COMPLETE

MECHANICAL WORK. COORDINATE WORK WITH MECHANICAL WORK.

CONTRACTOR MUST REMOVE EXISTING 24" x 48" SUSPENDED CEILING TILE AND GRID COMPLETE. RETAIN EXISTING HANGER WIRES FOR REUSE. INSTALL NEW 24" x 48" IN SAME PATTERN AND LOCATION AS EXISTING.

GENERAL NOTES

1. CONTRACTOR MUST REMOVE AND RETAIN LIGHT FIXTURES

(NOT SHOWN DRAWING) AS REQUIRED TO ACCOMMODATE THE

REMOVAL AND REPLACEMENT OF HYDRONIC HEATING

EQUIPMENT AND PIPING INSULATION AS SHOWN ON THE

MECHANICAL DRAWINGS. CONTRACTOR MUST DISCONNECT

AND SAFELY TERMINATE ALL CONDUIT AND WIRING WITH

APPROVED WIRE NUTS AND ELECTRICAL TAPE. FIXTURES

MUST BE PROTECTED FROM DAMAGE AND STORED FOR

REINSTALLATION. UPON COMPLETION OF PIPING AND

INSULATION WORK, CONTRACTOR MUST REINSTALL ALL

FIXTURES IN ORIGINAL LOCATIONS AND VERIFY PROPER

OPERATION. ANY FIXTURES OR ASSOCIATED COMPONENTS

DAMAGED DURING THIS WORK MUST BE REPAIRED OR

REPLACED IN KIND AT NO COST TO THE GOVERNMENT.

2. PRIOR TO THE START OF WORK EACH DAY IN ACTIVE

CONSTRUCTION AREAS, THE CONTRACTOR MUST

TEMPORARILY PROTECT FIRE ALARM INITIATING AND

NOTIFICATION DEVICES AS WELL AS SPRINKLER HEADS (NOT

SHOWN ON DRAWING) FROM DUST, DEBRIS, AND DAMAGE

USING APPROVED METHODS. ALL TEMPORARY COVERINGS

MUST BE REMOVED AT THE END OF EACH WORKDAY AND AT

ANY TIME THE FACILITY WILL BE LEFT UNATTENDED FOR MORE

THAN FOUR (4) HOURS. FIRE ALARM DEVICES AND SPRINKLERS

IN OCCUPIED AREAS MUST NOT BE COVERED, DISABLED, OR

OBSTRUCTED. ANY DAMAGE TO EXISTING FIRE ALARM OR

SUPPRESSION SYSTEM COMPONENTS RESULTING FROM

CONSTRUCTION ACTIVITIES MUST BE REPAIRED OR REPLACED

IN KIND BY THE CONTRACTOR AT NO ADDITIONAL COST TO

THE OWNER, AND THE SYSTEM MUST BE RESTORED TO FULL

OPERATIONAL STATUS PRIOR TO REOCCUPANCY OF

AFFECTED SPACES.

robin

SCALE:

HEADHOUSE MECHANICAL

PIPING DEMOLITION PLAN

3/16" = 1'-0"

MD104

0 4' 8' 16'

SCALE: 3/16"= 1'-0"

2'

1. DEMOLISH EXISTING HOT WATER REHEAT COIL,

CONTROL VALVES, CONTROLS, AND ALL

APPURTENANCES. DEMOLISH EXISTING PIPING

AND INSULATION BACK TO EXISTING ISOLATION

VALVES AND PLUG.

2. DEMOLISH EXISTING HOT WATER VAV BOX,

CONTROL VALVES, CONTROLS, AND ALL

APPURTENANCES. DEMOLISH EXISTING PIPING

AND INSULATION BACK TO EXISTING ISOLATION

VALVES AND PLUG.

3. POINT SHOWN IS APPROXIMATE EXTENT OF

WORK ACCORDING TO PHASE. CONTRACTOR

MUST FIELD VERIFY EXTENT OF WORK

COMPLETED IN PREVIOUS PHASE PRIOR TO

BEGINNING OF ANY WORK. THE CONTRACTOR

MUST COMPLETE ALL WORK SHOWN

THROUGHOUT THE DRAWINGS AND

SPECIFICATIONS UP THE EXTENT OF WORK

COMPLETED IN THE PREVIOUS PHASE.

KEYED NOTES

DEMO PIPING

EXISTING PIPING

LEGEND:

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

COND. CONDENSATE

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

VTR VENT THROUGH ROOF

POINT OF CONNECTION

EXIST. 4" HWR, 4" STM, 1-1/4"

COND, 8" CHWR, 4" CHWS,

AND 4" HWS TO REMAIN

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

GENERAL NOTES

1. ALL PIPING UP TO THE ISOLATION VALVE MUST

REMAIN IN PLACE. REMOVE INSULATION FROM

ALL PIPES AND FITTINGS WITHIN THE AREA OF

WORK ON THE FOLLOWING SYSTEMS: CHILLED

WATER SUPPLY, CHILLED WATER RETURN,

HEATING WATER RETURN, AND HEATING

WATER SUPPLY.

2. THE DEMOLITION PLAN AND EXISTING

CONDITIONS ARE APPROXIMATE. CONTRACTOR

MUST FIELD VERIFY EXISTING CONDITIONS.

CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,

PIPING, VALVES, CONTROLS, INSULATION, ETC.

FROM ANY DAMAGE OR CONTAMINATION

UNLESS NOTED OTHERWISE. OPEN ENDS OF

ALL DUCTWORK AND PIPING MUST BE

COVERED DURING CONSTRUCTION.

EXISTING

CONDENSATE

PUMP1

EXISTING 6" STM, 6"

CHWS, AND 6" CHWR UP

2-1/2"

2"

2-1/2"

3"

3" 3"

2-1/2"

2"

1-1/4"

3"

2"

2"

3"

3"

4"

1"

4"3"

1-1/2"1-1/2"2"

1"

1-1/2"1/2"

1/2"

3/4"

1/2"

1/2"

1-1/4"

1-1/4" 1-1/4" 1-1/4"

3/4"

3/4"

3/4"

3/4"

4"

4"

6" 4"

1/2"

1/2"

2"

6"

1-1/2"

SCALE:

HEADHOUSE MECHANICAL

PIPING NEW WORK PLAN

3/16" = 1'-0"

MP102

0 4' 8' 16'

SCALE: 3/16"= 1'-0"

2'

KEYED NOTES

1. PROVIDE HOT WATER HEATING COIL, 3-WAY

CONTROL VALVE, CONTROLS, AND ALL

APPURTENANCES IN PLACE OF EXISTING.

2. PROVIDE HOT WATER VAV BOX, 3-WAY CONTROL

VALVE, CONTROLS, AND ALL APPURTENANCES IN

PLACE OF EXISTING.

GENERAL NOTES

1. PROVIDE INSULATION ON ALL NEW AND

EXISTING PIPING AND FITTINGS WITHIN THE

AREA OF WORK ON THE FOLLOWING SYSTEMS:

CHILLED WATER RETURN, CHILLED WATER

SUPPLY, HEATING WATER RETURN, HEATER

WATER SUPPLY. BUILDING HEATING WATER

SYSTEM MUST REMAIN IN OPERATION

THROUGHOUT CONSTRUCTION. ANY

DISRUPTION TO THE EXISTING HEATING WATER

SYSTEM MUST BE COORDINATED WITH THE

CONTRACTING OFFICER.

2. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,

PIPING, VALVES, CONTROLS, INSULATION, ETC.

FROM ANY DAMAGE OR CONTAMINATION. OPEN

ENDS OF ALL DUCTWORK MUST BE COVERED

DURING CONSTRUCTION. CONTRACTOR MUST

MECHANICALLY CLEAN ENTIRE HVAC SYSTEM IN

WORK AREA TO REMOVE ALL VISIBLE

CONTAMINANTS, SUCH THAT SYSTEMS ARE

CAPABLE OF PASSING NADCA CLEANING

VERIFICATION TESTING STANDARDS ONCE

CONSTRUCTION IS COMPLETE.

3. TEST AND BALANCE HOT WATER COILS, VAV

BOXES AND ALL AFFECTED EXISTING

EQUIPMENT TO MEET SCHEDULES VALUES.

HC-32

HC-33

HC-34

HC-36

HC-37

HC-35

HC-38

HC-39

HC-40

HC-41

HC-42

HC-43

HC-44

VAV 4-1

VAV 4-2

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

UNIT HEATER

EXISTING

CONDENSATE

PUMP

EXIST. 4" HWR, 4" STM, 1-1/4"

COND, 8" CHWR, 4" CHWS,

AND 4" HWS TO REMAIN

POINT SHOWN IS APPROXIMATE EXTENT OF WORK ACCORDING TO PHASE.

CONTRACTOR MUST FIELD VERIFY EXTENT OF WORK COMPLETED IN PREVIOUS

PHASE PRIOR TO BEGINNING OF ANY WORK. THE CONTRACTOR MUST COMPLETE

ALL WORK SHOWN THROUGHOUT THE DRAWINGS AND SPECIFICATIONS UP THE

EXTENT OF WORK COMPLETED IN THE PREVIOUS PHASE.

EXISTING 6" STM, 6"

CHWS, AND 6" CHWR UP

HEAD HOUSE DUCT MOUNTED HEATING COIL SCHEDULE

BASIS

OF DESIGNMARK SERVES FUNCTION CAPACITY

MBH

AIRFLOW

CFM

COIL DATA

HC-32 MODINE LAB SUPPLY

AIR REHEAT 91.101200

0.270.38

12.82

EAT

°F

HC-33

HC-34

HC-35

HC-36

HC-37

HC-38

HC-39

HC-40

HC-41

HC-42

MODINE

MODINE

MODINE

MODINE

MODINE

MODINE

MODINE

MODINE

MODINE

MODINE

EXISTING

AHU-3

EXISTING

SUP 4-2

EXISTING

SUP 4-20

EXISTING

SUP 4-7

EXISTING

SUP 4-17

EXISTING

SUP 4-8

EXISTING

SUP 4-3

EXISTING

SUP 4-5

EXISTING

SUP 4-19

EXISTING

SUP 4-14

EXISTING

SUP 4-12

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

LAB SUPPLY

AIR REHEAT

MAX APD

IN.WC.

MAX WPD

FT.HD.

0.05 0.47

LAT

°F

100.0

FLOW

GPM

9.1

1.3

EWT

°F

LWT

°F

SIZE

IN

24X12

55 108.7 180 12X9

220 12.82 0.05 0.471.3105.8 180 10X6

285 15.27 0.07 0.621.5104.4 180

295 15.62 0.08 0.651.6103.8 180

330 16.76 0.10 0.731.7101.8 180

380 20.94 0.21 1.052.1105.8 180

350 17.38 0.11 0.771.7100.8 180

505 26.67 0.25 1.592.7103.7 180

720 37.22 0.11 4.103.7102.7 180 18X12

295 103.815.62 0.08 0.681.6

SINGLE DUCT VAV TERMINAL SCHEDULE

BOX TYPEBASIS OF

DESIGN

MFG.

BOX

MIN.

CFM

MFG.

BOX

MAX.

CFM

CFM DATA

INLET

SIZE

REHEAT/HEATING COIL DATA

MBH EWT/LWT °F EAT °F GPM

MAX.

WPD

FT.HD.

MAX

APD

IN.WC

REMARKS

SINGLE DUCT

REHEAT 5"Ø 180/137 55 5.00.17 SEE NOTES

DUCT CONN.

COIL

POSITION

DISCHARGE

COOLING/

HEATING

CFM

MARK

VAV-4-1

LAT °F

MIN.

COOLING/

HEATING

CFM

150 15050 350 0.5TRANE VCWF 10.56

1. ACTUATORS FOR VAV BOX AIR-CONTROL DAMPERS ARE TO BE FURNISHED AND INSTALLED BY THE AUTOMATIC TEMPERATURE CONTROLS SUPPLIER.

2. HEATING COIL CONTROL VALVES AND ACTUATORS ARE TO BE FURNISHED AND INSTALLED BY THE AUTOMATIC TEMPERATURE CONTROLS SUPPLIER.

3. MFR'S INLET SIZE MAY NOT REPRESENT PRIMARY AIR DUCT SIZE. FURNISH REDUCERS OR ENLARGERS FOR CONNECTING PRIMARY DUCT TO INLET.

4. PROVIDE BOXES WITH CONTROL ENCLOSURES, INTERNALLY LINED CASINGS, HEATING COILS LOCATED ON THE DISCHARGE POSITION.

5. FOR ALL BOXES, FIELD VERIFY RIGHT-HAND OR LEFT-HAND BOX AND COIL CONFIGURATIONS, DUCT CONNECTION CONFIGURATIONS, AND ELECTRICAL & CONTROL BOX

LOCATIONS PRIOR TO SUBMITTAL.

6. PROVIDE VAV BOXES WITH DOUBLE WALL CONSTRUCTION.

7. MINIMUM AND MAXIMUM AIRFLOWS LISTED ARE SHOWN FOR SIZING OF VAV BOXES. VAV BOXES MUST BE BALANCED TO COOLING AND HEATING DESIGN AIRFLOWS LISTED.

8. THE CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO EQUIPMENT SELECTION. CONTRACTOR MUST ENSURE THAT ALL EQUIPMENT

SELECTED IS SIZED ACCORDINGLY TO ALLOW FOR SEAMLESS CONNECTION TO EXISTING DUCTWORK, PIPING, AND ALL OTHER APPURTENANCES. VAV BOXES MUST BE PROVIDED WITH ALL CONTROLS REQUIRED TO SEAMLESSLY CONNECT INTO THE EXISTING BUILDING CONTROL SYSTEM.

NOTES:

HC-43 MODINE EXISTING

SUP 4-10

LAB SUPPLY

AIR REHEAT 2875 140.40 0.32 0.7614.0100.0 180 36X18

HC-44 MODINE EXISTING

SUP 4-22

LAB SUPPLY

AIR REHEAT 4355 212.50 0.27 1.3421.2100.0 180 48X18

SINGLE DUCT

REHEAT 5.0 SEE NOTESDISCHARGEVAV-4-2 TRANE VCWF

1. HOT WATER COILS MUST BE PROVIDED WITH ALL CONTROLS REQUIRED TO SEAMLESSLY CONNECT INTO THE EXISTING BUILDING CONTROL SYSTEM.

2. HEATING COIL CONTROL VALVES AND ACTUATORS ARE TO BE FURNISHED AND INSTALLED BY THE AUTOMATIC TEMPERATURE CONTROLS SUPPLIER.

3. MFR'S INLET SIZE MAY NOT REPRESENT PRIMARY AIR DUCT SIZE. FURNISH REDUCERS OR ENLARGERS FOR CONNECTING PRIMARY DUCT TO INLET.

4. THE CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO EQUIPMENT SELECTION. CONTRACTOR MUST ENSURE THAT ALL EQUIPMENT

SELECTED IS SIZED ACCORDINGLY TO ALLOW FOR SEAMLESS CONNECTION TO EXISTING DUCTWORK, PIPING, AND ALL OTHER APPURTENANCES.

NOTES:

12X9

12X9

12X9

12X9

12X9

12X9

12X9

REMARKS

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

SEE NOTES

5"Ø 180/137 550.17 119150 15050 350 0.510.56

Sheets and Views
G002-2B-G-002-2B
G002-3A-G-002-3A
G002-3B-G-002-3B
A-103-E-111-2A
MD104-MD104
MP102-MP102
M-603-M-603