1-BPM005860 Key Personnel Bio - Shawn Seery.pdf

PDF 246 KB Posted

Attached to
Master Agreement AZ|CTR071403
Contract number
CTR071403
Issued by
Arizona

About this file

This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement division for Solicitation No. BPM005860, focusing on a procurement process for key personnel in environmental services. The form is specifically for Shawn Seery, a Sr. Estimator with 20 years at his current firm and 37 years of total experience in asbestos, lead, and mold abatement services.

The bio details Seery's professional background, including a B.S. in Management from the University of Phoenix and multiple professional certifications such as Hazardous Material Technician and HAZWOPER Supervisor. The document includes five recent project experiences in Arizona, all completed with his current firm, involving asbestos and hazardous material abatement at locations like BHP Miami Trestle, New Valley Chase Tower, Arizona State University, SRP Navajo Generation Station, and NAU Building 50 Campus Heights. These projects range from demolition and abatement of warehouses, towers, and campus buildings, with scopes involving quantifying work, identifying hazards, and implementing safe and compliant environmental remediation strategies.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

• The Offeror shall complete this form for each key personnel proposed.

• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.

• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.

• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.

Background

Name

Prime Contractor

Subcontractor Name of

Subcontractor

Current Position with Firm Years with Firm Years in Position

Education and Training

Total # of Years of Experience

Asbestos Lead Mold

Relevant Work Experience

1.

Describe knowledge and experience in performing asbestos, lead, and mold abatement services.

2.

Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.

3.

List professional credentials, licenses, certifications, etc. Provide copy.

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

Relevant Project Experience

1.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

2.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

3.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

4.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

5.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

Name: Shawn Seery
Name of Subcontractor:
Current Position with Firm: Sr. Estimator
Years with Firm: 20
Years in Position: 10
Education and Training: University of Phoenix: B.S. in Management
Asbestos: 37
Lead: 37
Mold: 37
Describe knowledge and experience in performing asbestos lead and mold abatement services1: Employed for more 35 years, Shawn is accomplished with all aspects of the environmental industry and more specifically our organization. Shawn consistently strives to link the gap between productivity & safety/compliance while maintaining long-term professional ethical client & co-worker relationships. Primary duties include site investigation and scope quantification, work process determination, cost estimating, resource estimation including labor, equipment, materials, and waste. He will assist with implementation of Safety & Health Program including HAZCOM, fall prevention planning, pre-project safety submittals, and executing random safety audits in the environmental industry.
Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed.
List professional credentials licenses certifications etc Provide copy3: • Hazardous Material Technician (First Responder/Incident Commander, 160 hr.)

• HAZWOPER (Hazardous Waste Operations & Emergency Response, 40 hr.)

• HAZWOPER Supervisor

• AHERA Contractor/Supervisor (Arizona, California, & Texas)

• AHERA Project Designer (Arizona & California)

Check Box1: Off
Check Box2: Yes
Project Title1: BHP Miami Trestle, Warehouse, & Barcone
Location1: Miami, AZ
Year Completed1: 2022
Brief description of project your role and record of performance: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) demolished non-Asbestos Containing Materials (non-ACM), including the elevated water pipe, along with its trestle and supporting column beams. All materials being demolished come to about 740 Lineal Feet (LF). In another project, SSE demolished a stucco building, a total of 3,500 Square Feet (SF). Another project completed with BHP was the demolition of two (2) warehouse buildings, and abatement of Asbestos Containing Materials such as windows, wire, and drywall. The project was completed on time and under budget.
Project Title2: New Valley Chase Tower
Location2: Phoenix, AZ
Year Completed2: 2023
Brief description of project your role and record of performance_2: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems performed abatement for New Valley Construction at the former Chase Tower, the tallest high-rise in Phoenix. It may have been Arizona’s largest current abatement project with the exception of the decommissioning of the Salt River Project (SRP) Navajo Generating Station we also recently completed. Spray Systems scope includes abatement of 603,034 Square Feet (SF) of fireproofing, along with several other ACM, such as floor tile, grid ceilings, drywall, duct sealant, insulation, etc. All ACM being abated in this project equals more than three (3) million SF. The project was completed on time and under budget.
Project Title3: Arizona State University (ASU) - G Homer Durham Language & Literature
Location3: Tempe, AZ
Year Completed3: 2021
Brief description of project your role and record of performance_3: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) was contracted to complete fireproofing of approximately 56,603 Square Feet (SF) and remove and dispose 65,492 SF of carpet, tile, and mastic and 11,203 Lineal Feet (LF) of Thermal System Insulation (TSI) and seven (7) air handlers. To reach the Asbestos Containing Materials (ACM), the crew demolished over 30,000 SF of ceiling tiles and almost 7,000 SF of drywall. All work has been completed on schedule and within budget. At the Physical Sciences building, SSE abated over 20,000 SF of ACM, 14,343 LF of ACM and approximately 1,400 SF of Lead Containing Materials (LCM). The project was completed on time and under budget.
Project Title4: SRP Navajo Generation Station
Location4: Page, AZ
Year Completed4: 2023
Brief description of project your role and record of performance_4: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) was contracted by SRP to perform asbestos abatement associated with the decommissioning of the facility by others. ACM abated included vertical and horizontal expansion joints, flooring tile and associated mastic, drywall- walls and ceiling, roof mastics. The project was completed on time and under budget.
Project Title5: NAU Building 50 Campus Heights
Location5: Flagstaff, AZ
Year Completed5: 2021
Brief description of project your role and record of performance_5: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) abated approximately 27,195 Square Feet (SF) of carpet, vinyl floor tile, and mastic. This abatement included a total of forty-one (41) units, fourteen (14) one-bedroom units and twenty-seven (27) two-bedroom units. The project was completed on time and under budget.
Check Box4: Yes
Check Box8: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Yes
Check Box16: Yes
Check Box17: Yes
Check Box18: Yes
Text3: • OSHA Trainer (Powered Industrial Trucks)

• CPR/First Aid Certified

• Confined Space Certified

• CDL (Commercial Drivers License) Class A w/ HM & tanker endorsements

• CHMM: Certified Hazardous Material Manager (pending exam results)