1-BPM005860 Key Personnel Bio - Ken Ashfield.pdf

PDF 313 KB Posted

Attached to
Master Agreement AZ|CTR071403
Contract number
CTR071403
Issued by
Arizona

About this file

This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement for Solicitation No. BPM005860, featuring a detailed professional profile for Ken Ashfield, who is listed as a Prime Contractor with Spray Systems Environmental. The form is part of a procurement process for evaluating key personnel qualifications, specifically for asbestos, lead, and mold abatement services.

Ken Ashfield is a General Project Superintendent with 35 years of experience in the firm, holding 32 years in his current position. He has extensive experience in asbestos, lead, and mold abatement across various projects, including work with Arizona school districts, commercial enterprises, and government entities. The document highlights five recent projects in Phoenix and Tempe, AZ, where Ashfield served as General Superintendent, including large-scale abatement efforts at locations such as ADOA 1601 & 1645 W Jefferson, PFF JV Broadway Curve, New Valley Chase Tower, Arizona Public Service Ocotillo Power Plant, and Hunt/Austin - Phoenix Sky Harbor Terminal 3 Processor Building. These projects involved removing asbestos-containing materials, lead-based paint, and conducting comprehensive environmental remediation, with project scopes ranging from 200,000 square feet to 468 stator coils, consistently completed on time and under budget.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

• The Offeror shall complete this form for each key personnel proposed.

• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.

• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.

• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.

Background

Name

Prime Contractor

Subcontractor Name of

Subcontractor

Current Position with Firm Years with Firm Years in Position

Education and Training

Total # of Years of Experience

Asbestos Lead Mold

Relevant Work Experience

1.

Describe knowledge and experience in performing asbestos, lead, and mold abatement services.

2.

Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.

3.

List professional credentials, licenses, certifications, etc. Provide copy.

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

Relevant Project Experience

1.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

2.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

3.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

4.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

5.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

Name: Ken Ashfield
Name of Subcontractor:
Current Position with Firm: General Project Superintendent
Years with Firm: 35
Years in Position: 32
Education and Training:
Asbestos: 35
Lead: 35
Mold: 35
Describe knowledge and experience in performing asbestos lead and mold abatement services1: Ken joined Spray Systems in 1989 as a supervisor and was then promoted to General Superintendent in 1992. Ken has successfully supervised over $120 Million dollars in contracts with clients in schools, hospitals, commercial and residential abatement projects. Ken has also done extensive work with many Arizona school districts, commercial enterprises, and federal and local city governments. Works directly with office management and field personnel in coordination with subcontractors and owner representatives for assigned projects. Performs pre-construction planning, field quality control supervision and troubleshooting, oversees field operations, observes safety compliance, selects and assigns equipment orders for projects. Deals with the removal of various types and quantities of asbestos-containing materials and develops innovative containment and removal techniques and methods in respect to each project. Responsible for completing projects on schedule and within budgets. Acts as company representative to consultants, architects, general contractors, and Owners. Ensures copies of regulations, current employee training certifications, written hazard communication, safety program and respiratory protection programs and any other applicable written programs required by OSHA are onsite while work is being performed. Ensures that all labor is performed in a competent, timely, reliable and workman like manner, including use of subcontractors, foreman, skilled and unskilled employees employed.
Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: 40 Hour Contractor/Supervisor Certified AHERA

40 Hour HAZWOPER Certified / Supervisor Asbestos Hazard Emergency Response Act 8 Hour Lead Abatement Awareness Trained and Certified OSHA Confined Space Trained Mine Safety and Health Administration Trained Colorado Supervisor Certification Ohio Contract Supervisor Certification OSHA First Aid Certificate OSHA Supervisor Class

List professional credentials licenses certifications etc Provide copy3: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed.
Check Box1: Off
Check Box2: Yes
Project Title1: ADOA 1601 & 1645 W Jefferson
Location1: Phoenix, AZ
Year Completed1: 2022
Brief description of project your role and record of performance: Was the General Superintendent for this project. Spray Systems Environmental (SSE) abated over 200,000 Square Feet (SF) of Asbestos Containing Materials (ACM), including but not limited to dry wall walls, soundproofing, carpet mastic, vinyl floor tile and mastic, duct seam caulking and HVAC unit insulation. SSE disposed of all universal waster, as well as subcontracted Dickens Quality Demolition to demolish the non-Asbestos Containing Materials (non-ACM). The project was completed on time and under budget.
Project Title2: PFF JV Broadway Curve
Location2: Phoenix, AZ
Year Completed2: 2023
Brief description of project your role and record of performance_2: Was the General Superintendent for this project. Spray Systems Environmental (SSE) abated about 1,310 Linear Feet (LF) of Asbestos Cement (AC) pipe and One (1) Square Foot (SF) of deck gasket. SSE will also remove and dispose of around 7,248 SF of Lead Based Paint (LBP) found at various locations on the 48th Street Bridge and the Broadway Road Bridge. The Project was completed on time and under budget.
Project Title3: New Valley Chase Tower
Location3: Phoenix, AZ
Year Completed3: 2023
Brief description of project your role and record of performance_3: Was the General Superintendent for this project. Spray Systems performed abatement for New Valley Construction at the former Chase Tower, the tallest high-rise in Phoenix. It may have been Arizona’s largest current abatement project with the exception of the decommissioning of the Salt River Project (SRP) Navajo Generating Station we also recently completed. Spray Systems scope includes abatement of 603,034 Square Feet (SF) of fireproofing, along with several other ACM, such as floor tile, grid ceilings, drywall, duct sealant, insulation, etc. All ACM being abated in this project equals more than three (3) million SF. The project was completed on time and under budget.
Project Title4: Arizona Public Service (APS) Ocotillo Power Plant
Location4: Tempe, AZ
Year Completed4: 2021
Brief description of project your role and record of performance_4: Was the General Superintendent for this project. Spray Systems Environmental (SSE) and Environmental Response Inc. (ERI) have successfully served APS for more than twenty (20) years. Decommissioning of Ocotillo Power Generating Station was competitively bid based on qualifications and price. Scope included more than 88,000 Square Feet (SF) of Thermal System Insulation (TSI) at piping and hung boilers. The project was completed on time and under budget.
Project Title5: Hunt/Austin – Phoenix Sky Harbor Terminal 3 Processor Building, North and South Concourses
Location5: Bullhead City, AZ
Year Completed5: 2024
Brief description of project your role and record of performance_5: Was the General Superintendent for this project. Spray Systems Environmental (SSE) abated 468 stator coils at the Davis Dam, as well as removed the wedges from 492 vertical columns in between lamination plates in front of the coils. The project was completed on time and under budget.
Check Box4: Yes
Check Box8: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Yes
Check Box16: Yes
Check Box17: Yes
Check Box18: Yes
Text1: Meth-Lab Clean-Up

California Contractor Supervisor Certified Building Inspector Certified Project Designer Certified OSHA 30 Hour Safety Trained First Aid and CPR Instructor Competent Person – Excavation and Trenching Competent Person – Fall Protection Competent Person – Scaffolding OSHA 10 and 30 Instructor

File details come from the government source that posted it. Updated .