This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement division for Solicitation No. BPM005860, focusing on a key personnel named Chris Boyles. Boyles is the Founder and President of Spray Systems Environmental and Environmental Response, Inc., a prime contractor with 40 years of experience in environmental remediation, specifically in asbestos, lead, and mold abatement services.
The bio details Boyles' professional background, highlighting his extensive experience managing environmental remediation projects across Arizona, including significant projects at locations such as ADOA 1601 & 1645 W Jefferson in Phoenix, SRP Navajo Generation Station in Page, New Valley Chase Tower in Phoenix, MPS Mountain View Phase 3 in Mesa, and Hunt/Austin Phoenix Sky Harbor Terminal 3 in Phoenix. These projects involved abating substantial square footage of materials including asbestos-containing materials, dry wall, flooring, duct work, and other environmental hazards. Boyles' credentials include being a Qualifying Party for the AZ Registrar of Contractor's Licenses, having managed over 10,000 asbestos and lead abatement projects, and maintaining established relationships with EPA, OSHA, and DOT agencies.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
• The Offeror shall complete this form for each key personnel proposed.
• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.
• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.
• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.
Background
Name
Prime Contractor
Subcontractor Name of
Subcontractor
Current Position with Firm Years with Firm Years in Position
Education and Training
Total # of Years of Experience
Asbestos Lead Mold
Relevant Work Experience
1.
Describe knowledge and experience in performing asbestos, lead, and mold abatement services.
2.
Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.
3.
List professional credentials, licenses, certifications, etc. Provide copy.
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
Relevant Project Experience
1.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
2.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
3.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
4.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
5.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
| Name: Chris Boyles |
| Name of Subcontractor: |
| Current Position with Firm: Founder & President |
| Years with Firm: 40 |
| Years in Position: 40 |
| Education and Training: Montana State University, Billings, MT Business Administration |
| Asbestos: 40 |
| Lead: 40 |
| Mold: 40 |
| Describe knowledge and experience in performing asbestos lead and mold abatement services1: Founder and president of Spray Systems Environmental and Environmental Response, Inc. Chris has more than 40 years of management experience in the environmental remediation industry. Chris serves as the key negotiated contract estimator, specializing in large-scale, high-profile projects with special needs and time constraints. Manages the organization of more than twenty (20) management and administrative staff including estimating, project management, safety, and accounting. Directly surveys statistical data for all on-going and prospective projects and analyzes scheduling and manpower. Develops, plans, implements, reviews and revises innovative goals and tools for safety, project completion, estimating, and project management. Oversees the performance of a field staff of more than 125 with an average of more than 250,000-man hours per year. |
| Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed. |
| List professional credentials licenses certifications etc Provide copy3: • Qualifying Party for AZ Registrar of Contractor’s Licenses: 244330, 244331, 130187, |
101110, and 101060
• Managed more than 10,000 asbestos and lead abatement projects.
• Established relationships with all EPA, OSHA and DOT agencies.
• Board of Technical Registration Board Member
| Check Box1: Off |
| Check Box2: Yes |
| Project Title1: ADOA 1601 & 1645 W Jefferson |
| Location1: Phoenix, AZ |
| Year Completed1: 2022 |
| Brief description of project your role and record of performance: Oversee the management and field team that abated over 200,000 Square Feet (SF) of Asbestos Containing Materials (ACM), including but not limited to dry wall walls, soundproofing, carpet mastic, vinyl floor tile and mastic, duct seam caulking and HVAC unit insulation. SSE disposed of all universal waster, as well as subcontracted Dickens Quality Demolition to demolish the non-Asbestos Containing Materials (non-ACM). The project was completed on time and under budget. |
| Project Title2: SRP Navajo Generation Station |
| Location2: Page, AZ |
| Year Completed2: 2023 |
| Brief description of project your role and record of performance_2: Oversee the management and field team that was contracted by SRP to perform asbestos abatement associated with the decommissioning of the facility by others. ACM abated included vertical and horizontal expansion joints, flooring tile and associated mastic, drywall walls and ceilings, roof mastics. The project was completed on time and under budget. |
| Project Title3: New Valley Chase Tower |
| Location3: Phoenix, AZ |
| Year Completed3: 2023 |
| Brief description of project your role and record of performance_3: Oversee the management and field team that performed abatement for New Valley Construction at the former Chase Tower, the tallest high-rise in Phoenix. It may have been Arizona’s largest abatement project with the exception of the decommissioning of the Salt River Project (SRP) Navajo Generating Station we also recently completed. Spray Systems scope includes abatement of 603,034 Square Feet (SF) of fireproofing, along with several other ACM, such as floor tile, grid ceilings, drywall, duct sealant, insulation, etc. All ACM being abated in this project equals more than three (3) million SF. The project was completed on time and under budget. |
| Project Title4: MPS Mountain View Phase 3 |
| Location4: Mesa, AZ |
| Year Completed4: 2022 |
| Brief description of project your role and record of performance_4: Oversee the management and field team that abated 39,000 Square Feet (SF) of Asbestos Containing Materials (ACM) throughout classrooms, labs, and offices. All the materials consisted of drywall ceiling, and glue-on tile; this abatement was completed over several school breaks and weekends to work around the school schedule. The project was completed on time and under budget. |
| Project Title5: Hunt/Austin – Phoenix Sky Harbor Terminal 3 Processor Building, North and South Concourses |
| Location5: Phoenix, AZ |
| Year Completed5: 2022 |
| Brief description of project your role and record of performance_5: Oversee the management and field team that was contracted to abate over 7,000 Square Feet (SF) of duct seam tape, 6,000 SF of exterior material, 4,200 SF of block fill, 4,000 SF of vermiculite wall board, 2,900 SF of flooring, 2,500 SF of grey mastic, and 1,510 Lineal Feet (LF) of joint sealant. In addition to the original scope, more than 944 SF of flooring, 360 SF of mastic and almost 9,000 SF of additional window caulking was abated and kept the project within schedule. All work was completed in accordance with City of Phoenix Job Order Contract (JOC). The project was completed on time and under budget. |
| Check Box4: Yes |
| Check Box8: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Yes |
| Check Box16: Yes |
| Check Box17: Yes |
| Check Box18: Yes |
File details come from the government source that posted it. Updated .