This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement, associated with Solicitation No. BPM005860. The form is for Kasey Boyles, a Chief Operating Officer who is a prime contractor, detailing professional qualifications and experience in environmental remediation services, specifically asbestos, lead, and mold abatement.

The document highlights Boyles' 14 years of experience, including five specific project details involving Spray Systems Environmental (SSE) performing abatement services across multiple locations in Arizona, including Phoenix and Mesa. Projects range from removing asbestos-containing materials in schools, towers, and public buildings to managing trucking, hauling, and environmental remediation. Notable projects include work at ADOA 1601 & 1645 W Jefferson, PFF JV Broadway Curve, New Valley Chase Tower, MPS Mountain View Phase 3, and Hunt/Austin - Phoenix Sky Harbor Terminal 3 Processor Building. Each project emphasizes completed work on time and under budget, with extensive square footage of abatement across various building types and environments.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

• The Offeror shall complete this form for each key personnel proposed.

• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.

• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.

• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.

Background

Name

Prime Contractor

Subcontractor Name of

Subcontractor

Current Position with Firm Years with Firm Years in Position

Education and Training

Total # of Years of Experience

Asbestos Lead Mold

Relevant Work Experience

1.

Describe knowledge and experience in performing asbestos, lead, and mold abatement services.

2.

Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.

3.

List professional credentials, licenses, certifications, etc. Provide copy.

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

Relevant Project Experience

1.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

2.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

3.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

4.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

5.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

Name: Kasey Boyles
Name of Subcontractor:
Current Position with Firm: Chief Operating Officer
Years with Firm: 14
Years in Position: 13
Education and Training: Arizona Christian University
Asbestos: 14
Lead: 14
Mold: 14
Describe knowledge and experience in performing asbestos lead and mold abatement services1: Kasey has more than (10) years of experience in all aspects of company function. Successfully reduced material costs by 3% and increased efficiency of trucking division by 13%. Implemented RFID material and equipment tracking software. Six (6) years of experience in restoration and structural drying. Constantly searching for new and innovative ways to increase safety and productivity in all aspects on environmental remediation. Manages daily operations of the organization including human resources, purchasing, waste hauling, equipment delivery, warehouse equipment repair, regulatory compliance, and safety. Evaluate performance by analyzing and interpreting data Design and implement business strategies, plans and procedures
Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed.
List professional credentials licenses certifications etc Provide copy3: AHERA Contractor / Supervisor Certified

Lead Awareness Applied Structural Drying Water Damage Restoration

Check Box1: Off
Check Box2: Yes
Project Title1: ADOA 1601 & 1645 W Jefferson
Location1: Phoenix, AZ
Year Completed1: 2022
Brief description of project your role and record of performance: Purchasing of tools, equipment and materials as well as managing trucking and hauling. Spray Systems Environmental (SSE) abated over 200,000 Square Feet (SF) of Asbestos Containing Materials (ACM), including but not limited to dry wall walls, soundproofing, carpet mastic, vinyl floor tile and mastic, duct seam caulking and HVAC unit insulation. SSE disposed of all universal waster, as well as subcontracted Dickens Quality Demolition to demolish the non-Asbestos Containing Materials (non-ACM). The project was completed on time and under budget.
Project Title2: PFF JV Broadway Curve
Location2: Phoenix, AZ
Year Completed2: 2023
Brief description of project your role and record of performance_2: Purchasing of tools, equipment and materials as well as managing trucking and hauling. Spray Systems Environmental (SSE) abated about 1,310 Linear Feet (LF) of Asbestos Cement (AC) pipe and One (1) Square Foot (SF) of deck gasket. SSE will also remove and dispose of around 7,248 SF of Lead Based Paint (LBP) found at various locations on the 48th Street Bridge and the Broadway Road Bridge. The project was completed on time and under budget.
Project Title3: New Valley Chase Tower
Location3: Phoenix, AZ
Year Completed3: 2023
Brief description of project your role and record of performance_3: Purchasing of tools, equipment and materials as well as managing trucking and hauling. Spray Systems performed abatement for New Valley Construction at the former Chase Tower, the tallest high-rise in Phoenix. It may have been Arizona’s largest current abatement project with the exception of the decommissioning of the Salt River Project (SRP) Navajo Generating Station we also recently completed. Spray Systems scope includes abatement of 603,034 Square Feet (SF) of fireproofing, along with several other ACM, such as floor tile, grid ceilings, drywall, duct sealant, insulation, etc. All ACM being abated in this project equals more than three (3) million SF. The project was completed on time and under budget.
Project Title4: MPS Mountain View Phase 3
Location4: Mesa, AZ
Year Completed4: 2022
Brief description of project your role and record of performance_4: Purchasing of tools, equipment and materials as well as managing trucking and hauling. Spray Systems Environmental (SSE) has abated 39,000 Square Feet (SF) of Asbestos Containing Materials (ACM) throughout classrooms, labs, and offices. All the materials consisted of drywall ceiling, and glue-on tile; this abatement was completed over several school breaks and weekends to work around the school schedule. SSE has been in constant work with Mesa Public Schools on the Mountain View project, for about 2 years now. The project was completed on time and under bugdet.
Project Title5: Hunt/Austin – Phoenix Sky Harbor Terminal 3 Processor Building, North and South Concourses
Location5: Phoenix, AZ
Year Completed5: 2022
Brief description of project your role and record of performance_5: Purchasing of tools, equipment and materials as well as managing trucking and hauling. Spray Systems Environmental (SSE) was contracted to abate over 7,000 Square Feet (SF) of duct seam tape, 6,000 SF of exterior material, 4,200 SF of block fill, 4,000 SF of vermiculite wall board, 2,900 SF of flooring, 2,500 SF of grey mastic, and 1,510 Lineal Feet (LF) of joint sealant. In addition to the original scope, more than 944 SF of flooring, 360 SF of mastic and almost 9,000 SF of additional window caulking was abated and kept the project within schedule. All work was completed in accordance with City of Phoenix Job Order Contract (JOC). The project was completed on time and under budget.
Check Box4: Yes
Check Box8: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Yes
Check Box16: Yes
Check Box17: Yes
Check Box18: Yes

File details come from the government source that posted it. Updated .