1-BPM005860 Key Personnel Bio - Len Newman.pdf
PDF 310 KB Posted
- Attached to
- Master Agreement AZ|CTR071403
- Contract number
- CTR071403
- Issued by
- Arizona
About this file
This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement for Solicitation No. BPM005860, focusing on Len Newman, a Project Manager for a prime contractor. The form is part of a procurement process for evaluating key personnel qualifications in environmental abatement services, specifically for asbestos, lead, and mold-related projects.
Len Newman is a Project Manager with 9 years at his current firm, possessing 39 years of total experience in industrial hygiene and environmental abatement. His professional credentials include AHERA Contractor Supervisor Certification and NIOSH 582 training. The document details five recent projects in Phoenix and Tempe, Arizona, ranging from 2021-2023, where Newman managed large-scale abatement efforts involving over 200,000 square feet of asbestos-containing materials, lead-based paint removal, and environmental remediation. These projects included work at locations such as ADOA facilities, Broadway Road Bridge, New Valley Chase Tower, and government buildings, with each project completed on time and under budget.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
• The Offeror shall complete this form for each key personnel proposed.
• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.
• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.
• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.
Background
Name
Prime Contractor
Subcontractor Name of
Subcontractor
Current Position with Firm Years with Firm Years in Position
Education and Training
Total # of Years of Experience
Asbestos Lead Mold
Relevant Work Experience
1.
Describe knowledge and experience in performing asbestos, lead, and mold abatement services.
2.
Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.
3.
List professional credentials, licenses, certifications, etc. Provide copy.
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
Relevant Project Experience
1.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
2.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
3.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
4.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
5.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
| Name: Len Newman |
| Name of Subcontractor: |
| Current Position with Firm: Project Manager |
| Years with Firm: 9 |
| Years in Position: 9 |
| Education and Training: |
| Asbestos: 39 |
| Lead: 39 |
| Mold: 39 |
| Describe knowledge and experience in performing asbestos lead and mold abatement services1: Over 30 years of industrial hygiene, project management and estimating in the |
environmental abatement industry, first as an asbestos inspector, project manager and operations manager and then on to the contracting side as an estimator & project manager. Responsible for project setup, submittals, production cost tracking, subcontractor management, and project invoicing & project closeout. Typically managing over 200 projects per year ranging from single day to long term and multi-year project types.
| Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed. |
| List professional credentials licenses certifications etc Provide copy3: AHERA Contractor Supervisor Certified |
National Institute of Occupational Safety and Health (NIOSH) 582
| Check Box1: Off |
| Check Box2: Yes |
| Project Title1: ADOA 1601 & 1645 W Jefferson |
| Location1: Phoenix, AZ |
| Year Completed1: 2022 |
| Brief description of project your role and record of performance: Was the assigned project manager for this project. Spray Systems Environmental (SSE) abated over 200,000 Square Feet (SF) of Asbestos Containing Materials (ACM), including but not limited to dry wall walls, soundproofing, carpet mastic, vinyl floor tile and mastic, duct seam caulking and HVAC unit insulation. SSE disposed of all universal waster, as well as subcontracted Dickens Quality Demolition to demolish the non-Asbestos Containing Materials (non-ACM). The project was completed on time and under budget. |
| Project Title2: PFF JV Broadway Curve |
| Location2: Phoenix, AZ |
| Year Completed2: 2023 |
| Brief description of project your role and record of performance_2: Was the assigned project manager for this project. Spray Systems Environmental (SSE) abated about 1,310 Linear Feet (LF) of Asbestos Cement (AC) pipe and One (1) Square Foot (SF) of deck gasket. SSE will also remove and dispose of around 7,248 SF of Lead Based Paint (LBP) found at various locations on the 48th Street Bridge and the Broadway Road Bridge. The project was completed on time and under budget. |
| Project Title3: New Valley Chase Tower |
| Location3: Phoenix, AZ |
| Year Completed3: 2023 |
| Brief description of project your role and record of performance_3: Was the assigned project manager for this project. Spray Systems performed abatement for New Valley Construction at the former Chase Tower, the tallest high-rise in Phoenix. It may have been Arizona’s largest current abatement project with the exception of the decommissioning of the Salt River Project (SRP) Navajo Generating Station we also recently completed. Spray Systems scope includes abatement of 603,034 Square Feet (SF) of fireproofing, along with several other ACM, such as floor tile, grid ceilings, drywall, duct sealant, insulation, etc. All ACM being abated in this project equals more than three (3) million SF. The project was completed on time and under budget. |
| Project Title4: Ryan JPMC 2018 |
| Location4: Tempe, AZ |
| Year Completed4: 2021 |
| Brief description of project your role and record of performance_4: Was the assigned project manager for this project. Spray Systems Environmental (SSE) demolished 27,335 Square Feet (SF) of non-Asbestos Containing Materials (non-ACM), before removing and disposing of all the universal waster. SSE also abated approximately 122,600 Square Feet (SF) of Asbestos Containing Materials (ACM). The project was completed on time and under budget. |
| Project Title5: Central Arizona Government (CAG) – Hayden and Winkelman |
| Location5: Hayden & Winkleman, AZ |
| Year Completed5: 2021 |
| Brief description of project your role and record of performance_5: Was the assigned project manager for this project. OSHA Lead certified workers performed selective abatement or encapsulation of Lead Based Paint (LBP)/Asbestos Containing Materials (ACM) in 48 residences in the town of Hayden, and 9 residences in Winkelman from June 2019 to January 1, 2021. There was a COVID-19 shutdown from March 2020 to October 2020. Spray Systems Environmental (SSE) completed all restoration/replacement of windows, doors, flooring, and cabinetry. The project was completed on time and under budget. |
| Check Box4: Yes |
| Check Box8: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Yes |
| Check Box16: Yes |
| Check Box17: Yes |
| Check Box18: Yes |
File details come from the government source that posted it. Updated .