1-BPM005860 Key Personnel Bio - Jon Varrelman.pdf

PDF 312 KB Posted

Attached to
Master Agreement AZ|CTR071403
Contract number
CTR071403
Issued by
Arizona

About this file

This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement for Solicitation No. BPM005860, focusing on a key personnel named Jon Varrelman. The form is part of a procurement process for environmental abatement services, specifically related to asbestos, lead, and mold remediation. Jon Varrelman is listed as a Prime Contractor Estimator with 13 years of experience with the firm and 7 years in his current position.

The document details Varrelman's professional background, including his expertise in environmental abatement, project estimation, and regulatory compliance. He has professional certifications such as AHERA Contractor Supervisor Certified, HAZWASTE Supervisor Certified, and Microbial Investigation Certified Lead. The form also includes five recent project experiences across Arizona, including work at MPS Zaharis Elementary, PFF JV Broadway Curve, Progressive - Corona Del Sol High School, SRPMIC Old Elementary School, and Mohave County Historic Courthouse. These projects involved various abatement services like water intrusion remediation, asbestos and lead removal, and roofing work, all completed on time and within budget for different educational and government facilities.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

• The Offeror shall complete this form for each key personnel proposed.

• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.

• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.

• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.

Background

Name

Prime Contractor

Subcontractor Name of

Subcontractor

Current Position with Firm Years with Firm Years in Position

Education and Training

Total # of Years of Experience

Asbestos Lead Mold

Relevant Work Experience

1.

Describe knowledge and experience in performing asbestos, lead, and mold abatement services.

2.

Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.

3.

List professional credentials, licenses, certifications, etc. Provide copy.

Procurement Key Personnel Bio

Solicitation No: BPM005860 Available online at https://app.az.gov

Relevant Project Experience

1.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

2.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

3.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

4.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

5.

Project Title Location Year Completed Done w/ Current Firm?

☐Yes ☐No

Brief description of project, your role, and record of performance

Name: Jon Varrelman
Name of Subcontractor:
Current Position with Firm: Estimator
Years with Firm: 13
Years in Position: 7
Education and Training:
Asbestos: 13
Lead: 13
Mold: 13
Describe knowledge and experience in performing asbestos lead and mold abatement services1: Estimator with over 10 years' experience in the environmental abatement industry. Serves as a project estimator, helping in business development, estimating, and planning of all projects, job order contracts and master subcontractor agreements. Assists with all business development and estimating activities. Review and analyze all types of survey and sample results. Prepare initial estimates for all corrective actions as requested by clients. Address client’s needs and job specific concerns in written proposals. Work closely with clients and field management to keep schedules and budget activities within contract requirements. Participate in management meetings and planning efforts to assists in the smooth scheduling of projects, which reflect crew availability and client preferences and needs.
Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed.
List professional credentials licenses certifications etc Provide copy3: AHERA Contractor Supervisor Certified

HAZWASTE Supervisor Certified Microbial Investigation Certified Lead OSHA Confined Space Certified OSHA 30-hour Safety Hazwoper Certified Mine Safety and Health Administration Trained Lead Abatement Awareness Certified

Check Box1: Off
Check Box2: Yes
Project Title1: MPS Zaharis Elementary Water Intrusion
Location1: Mesa, AZ
Year Completed1: 2023
Brief description of project your role and record of performance: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) responded to an emergency call after a monsoon storm hit parts of the Valley. Classrooms were flooded, parts of the ceiling had caved in, and debris was scattered throughout the campus resulting in the school having to shut down for a week. SSE mobilized almost our entire staff within a day to assist with the flood, so the school could get up and running as soon as possible. The project was completed on time and under budget.
Project Title2: PFF JV Broadway Curve
Location2: Phoenix, AZ
Year Completed2: 2021
Brief description of project your role and record of performance_2: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) abated about 1,310 Linear Feet (LF) of Asbestos Cement (AC) pipe and One (1) Square Foot (SF) of deck gasket. SSE will also remove and dispose of around 7,248 SF of Lead Based Paint (LBP) found at various locations on the 48th Street Bridge and the Broadway Road Bridge. The project was completed on time and under budget.
Project Title3: Progressive - Corona Del Sol High School
Location3: Tempe, AZ
Year Completed3: 2023
Brief description of project your role and record of performance_3: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) abated approximately 260,000 Square Feet (SF) of built-up roofing under the foam at several different locations on the Corona Del Sol High School. The project was completed on time and under budget.
Project Title4: SRPMIC Old Elementary School
Location4: Scottsdale, AZ
Year Completed4: 2018
Brief description of project your role and record of performance_4: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) removed and disposed of 1,800 SF of drywall in various locations in the building and 800 SF of Thermal System Insulation (TSI), pipe insulation and 180 LF of flooring. Removal and disposal of Lead Based Paint (LBP) was done using a dustless blasting removal technique on exterior wall surface, perimeter, and interior walls. Demolition of entire roof structure and non-historic building additions was completed without impacting the historic structure. Semi-permanent shoring was engineered and installed to maintain the historic shell of the building for future renovation. The project was completed on time and under budget.
Project Title5: Mohave County Historic Courthouse
Location5: Kingman, AZ
Year Completed5: 2022
Brief description of project your role and record of performance_5: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) removed lay-in ceiling system to access the top of the walls prior to the abatement of the Asbestos Containing Materials (ACM) on the basement annex, first floor annex, second floor annex and the exterior; and after that we abated Lead Based Paint (LBP) in the basement, the first floor and the second floor of the historic court, including its

exterior. In total around 4,450 Square Feet (SF) of the lay-in ceiling system. The ACM included around 3,234 SF of floor tile, carpet, and mastic, about 9,185 SF of joint compound, and other miscellaneous materials such as TSI pipe fittings, duct wrap, caulking and Asbestos Cement (AC) pipe. The project was completed on time and under budget.

Check Box4: Yes
Check Box8: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Yes
Check Box16: Yes
Check Box17: Yes
Check Box18: Yes

File details come from the government source that posted it. Updated .