1-BPM005860 Key Personnel Bio - Jon Varrelman.pdf
PDF 312 KB Posted
- Attached to
- Master Agreement AZ|CTR071403
- Contract number
- CTR071403
- Issued by
- Arizona
About this file
This document is a Key Personnel Bio form from the Arizona Department of Transportation (ADOT) Procurement for Solicitation No. BPM005860, focusing on a key personnel named Jon Varrelman. The form is part of a procurement process for environmental abatement services, specifically related to asbestos, lead, and mold remediation. Jon Varrelman is listed as a Prime Contractor Estimator with 13 years of experience with the firm and 7 years in his current position.
The document details Varrelman's professional background, including his expertise in environmental abatement, project estimation, and regulatory compliance. He has professional certifications such as AHERA Contractor Supervisor Certified, HAZWASTE Supervisor Certified, and Microbial Investigation Certified Lead. The form also includes five recent project experiences across Arizona, including work at MPS Zaharis Elementary, PFF JV Broadway Curve, Progressive - Corona Del Sol High School, SRPMIC Old Elementary School, and Mohave County Historic Courthouse. These projects involved various abatement services like water intrusion remediation, asbestos and lead removal, and roofing work, all completed on time and within budget for different educational and government facilities.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
• The Offeror shall complete this form for each key personnel proposed.
• The Offeror shall describe relevant professional qualifications, experience and expertise for any resultant contract.
• The Offeror shall detail relevant work experience where they had a significant role that demonstrates their capability relevant to their proposed role in this contract.
• In addition, the Offeror may attach a brief resume to the Bio form outlining their qualifications, experience, and credentials. Any resume submitted is supplemental to this form and does not replace the requirement to complete the Key Personnel Bio.
Background
Name
Prime Contractor
Subcontractor Name of
Subcontractor
Current Position with Firm Years with Firm Years in Position
Education and Training
Total # of Years of Experience
Asbestos Lead Mold
Relevant Work Experience
1.
Describe knowledge and experience in performing asbestos, lead, and mold abatement services.
2.
Describe level of knowledge, familiarity, and experience with relevant Federal, State, local, and industry standards.
3.
List professional credentials, licenses, certifications, etc. Provide copy.
Procurement Key Personnel Bio
Solicitation No: BPM005860 Available online at https://app.az.gov
Relevant Project Experience
1.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
2.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
3.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
4.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
5.
Project Title Location Year Completed Done w/ Current Firm?
☐Yes ☐No
Brief description of project, your role, and record of performance
| Name: Jon Varrelman |
| Name of Subcontractor: |
| Current Position with Firm: Estimator |
| Years with Firm: 13 |
| Years in Position: 7 |
| Education and Training: |
| Asbestos: 13 |
| Lead: 13 |
| Mold: 13 |
| Describe knowledge and experience in performing asbestos lead and mold abatement services1: Estimator with over 10 years' experience in the environmental abatement industry. Serves as a project estimator, helping in business development, estimating, and planning of all projects, job order contracts and master subcontractor agreements. Assists with all business development and estimating activities. Review and analyze all types of survey and sample results. Prepare initial estimates for all corrective actions as requested by clients. Address client’s needs and job specific concerns in written proposals. Work closely with clients and field management to keep schedules and budget activities within contract requirements. Participate in management meetings and planning efforts to assists in the smooth scheduling of projects, which reflect crew availability and client preferences and needs. |
| Describe level of knowledge familiarity and experience with relevant Federal State local and industry standards2: Our company has in place a comprehensive regulatory compliance program to ensure that our Key Personnel are aware of all applicable rules and regulations concerning our scope of work under this Contract. We utilize a wide variety of systems to keep up to date with all changing rules and regulations. We use training schools, internet providers, safety programs, web sites, books, manuals, CD’s, computer programs and monthly safety meetings to keep on the cutting edge of regulatory compliance. We have weekly management meetings and regulatory compliance is the main topic discussed. |
| List professional credentials licenses certifications etc Provide copy3: AHERA Contractor Supervisor Certified |
HAZWASTE Supervisor Certified Microbial Investigation Certified Lead OSHA Confined Space Certified OSHA 30-hour Safety Hazwoper Certified Mine Safety and Health Administration Trained Lead Abatement Awareness Certified
| Check Box1: Off |
| Check Box2: Yes |
| Project Title1: MPS Zaharis Elementary Water Intrusion |
| Location1: Mesa, AZ |
| Year Completed1: 2023 |
| Brief description of project your role and record of performance: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) responded to an emergency call after a monsoon storm hit parts of the Valley. Classrooms were flooded, parts of the ceiling had caved in, and debris was scattered throughout the campus resulting in the school having to shut down for a week. SSE mobilized almost our entire staff within a day to assist with the flood, so the school could get up and running as soon as possible. The project was completed on time and under budget. |
| Project Title2: PFF JV Broadway Curve |
| Location2: Phoenix, AZ |
| Year Completed2: 2021 |
| Brief description of project your role and record of performance_2: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) abated about 1,310 Linear Feet (LF) of Asbestos Cement (AC) pipe and One (1) Square Foot (SF) of deck gasket. SSE will also remove and dispose of around 7,248 SF of Lead Based Paint (LBP) found at various locations on the 48th Street Bridge and the Broadway Road Bridge. The project was completed on time and under budget. |
| Project Title3: Progressive - Corona Del Sol High School |
| Location3: Tempe, AZ |
| Year Completed3: 2023 |
| Brief description of project your role and record of performance_3: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) abated approximately 260,000 Square Feet (SF) of built-up roofing under the foam at several different locations on the Corona Del Sol High School. The project was completed on time and under budget. |
| Project Title4: SRPMIC Old Elementary School |
| Location4: Scottsdale, AZ |
| Year Completed4: 2018 |
| Brief description of project your role and record of performance_4: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) removed and disposed of 1,800 SF of drywall in various locations in the building and 800 SF of Thermal System Insulation (TSI), pipe insulation and 180 LF of flooring. Removal and disposal of Lead Based Paint (LBP) was done using a dustless blasting removal technique on exterior wall surface, perimeter, and interior walls. Demolition of entire roof structure and non-historic building additions was completed without impacting the historic structure. Semi-permanent shoring was engineered and installed to maintain the historic shell of the building for future renovation. The project was completed on time and under budget. |
| Project Title5: Mohave County Historic Courthouse |
| Location5: Kingman, AZ |
| Year Completed5: 2022 |
| Brief description of project your role and record of performance_5: Quantified the scope of work, identified potential hazards and developed a safe, compliant and cost effective approach to the project. Spray Systems Environmental (SSE) removed lay-in ceiling system to access the top of the walls prior to the abatement of the Asbestos Containing Materials (ACM) on the basement annex, first floor annex, second floor annex and the exterior; and after that we abated Lead Based Paint (LBP) in the basement, the first floor and the second floor of the historic court, including its |
exterior. In total around 4,450 Square Feet (SF) of the lay-in ceiling system. The ACM included around 3,234 SF of floor tile, carpet, and mastic, about 9,185 SF of joint compound, and other miscellaneous materials such as TSI pipe fittings, duct wrap, caulking and Asbestos Cement (AC) pipe. The project was completed on time and under budget.
| Check Box4: Yes |
| Check Box8: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Yes |
| Check Box16: Yes |
| Check Box17: Yes |
| Check Box18: Yes |
File details come from the government source that posted it. Updated .