This is a List of Reference Documents attachment for a Request for Proposals issued by San Francisco Public Works on behalf of the Port of San Francisco for Pre-Construction Engineering and Design (PED) services under the Waterfront Resilience Program. The RFP seeks two separate contracts—one for the northern Plan Area (PED-North) with a not-to-exceed amount of $65,000,000 and one for the southern Plan Area (PED-South) with a not-to-exceed amount of $50,000,000. Proposers may submit for one or both Plan Areas. A virtual Pre-Proposal Conference is scheduled for Wednesday, October 14, 2026, at 10:00 AM Pacific Time via Microsoft Teams. Questions must be submitted by email to DPW ProContracts@sfdpw.org no later than Tuesday, October 20, 2026, at 5:00 PM PT. Each contract will have an initial term of ten (10) years.

The reference documents provide comprehensive technical background for the PED services, including Multi-Hazard Risk Assessment (MHRA) reports covering earthquake hazard and geotechnical assessments, coastal flood hazard reports with flood maps and overtopping analyses, and risk assessments for buildings, marine structures, utilities, and mobility systems. Pre-design reports are provided for sample projects including the Pier 24-28 Bulkhead Wall and Wharf Earthquake Safety Retrofit Project, Wharf J9 Replacement and Resilient Shoreline Project, Pier 9 and Pier 15 Bulkhead Wall and Wharf Earthquake Safety Retrofit Projects, and floodproofing feasibility assessments. These documents establish the technical foundation and project scope for the selected consultants' engineering and design work supporting the Port's waterfront resilience initiatives focused on seismic and flood mitigation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sourcing Event ID 11697 October 02, 2026 PWP-690 (4-26); Attachment 8 1 of 3 Reference Documents

Attachment 8

LIST OF REFERENCE DOCUMENTS

General Documents from the Multi-Hazard Risk Assessment (MHRA)

File Name Document Name Date

GEN-R01_MHRA Summary Report.pdf

Multi-Hazard Risk Assessment Northern Waterfront and Embarcadero Seawall Summary Report

Aug-20

GEN-R02_MHRA Earthquake Hazard & Geotechnical Assessment.pdf

Earthquake Hazard & Geotechnical Assessment Report

Oct-20

GEN-R03_MHRA

CoastalFloodHazRpt_V2_2021.11.09 (NoAppendix).pdf

Coastal Flood Hazard Report Nov-21

GEN-R03A_MHRA

CoastalFloodHazRpt_V2_Appendix A - Flood Maps Updated.pdf

Appendix A Flood Hazard Maps:

Flood Depth

Nov-21

GEN-R03B_MHRA

CoastalFloodHazRpt_V2_Appendix B - Overtopping Embarcadero.pdf

Overtopping Risk Along the Embarcadero

Nov-21

GEN-R03C_MHRA

CoastalFloodHazRpt_V2_Appendix C - Overtopping Finger Piers.pdf

Overtopping Risk along the Finger Piers

Nov-21

GEN-R03D_MHRA

CoastalFloodHazRpt_V2_Appendix D - Swell sensitivity analysis.pdf

Missing Document Title Nov-21

GEN-R04_MHRA Buildings & Marine Structures, EQ Risk Assessment.pdf

Buildings & Marine Structures - Earthquake Exposure, Vulnerability, and Consequences Report

Sep-20

GEN-R05_MHRA Buildings Flood Risk Assessment.pdf

Buildings – Coastal Flood Exposure, Vulnerability, and Consequences Report

May-20

GEN-R06_MHRA Utility & Mobility EQ & Flood Risk Assessment.pdf

Utility and Mobility Systems – Earthquake and Coastal Flood Exposure, Vulnerability, and Consequences Report

Nov-20

GEN-R07_MHRA Geotechnical Pilot.pdf Geotechnical Report Pilot Geotechnical Site Investigation Seawall Earthquake Safety Program

5/7/2018 - 5/26/2-18

PWP-690 (4-26); Attachment 8 2 of 3 Reference Documents

GEN-R08_MHRA Geotechnical Main.pdf Geotechnical Data Report Geotechnical Site Investigation Seawall Earthquake Safety Program

05/07/2018 - 11/30/2018

GEN-R09_MHRA Geotechnical Interpretive Report.pdf

Geotechnical Interpretive Report Seawall Earthquake Safety Program

Jan-20

GEN-R10_MHRA Boat Map and FIELD OPERATIONS REPORT BOAT-

MAP &

06/18/2018

Multi Beam survey.pdf GEOPHYSICAL SEAWALL SURVEY

PORT OF SAN FRANCISCO

06/27/2018

PROJECT PRE-DESIGN REPORTS (SAMPLES)

File Name Document Name Date

SB-R01_WRP018_P24-

28_Report_NARFinal_V1_2022.11.

24.pdf

Pier 24½ to 28½ Bulkhead Wall and Wharf Earthquake Safety Retrofit Project Needs Assessment Report

Nov-22

SB-R02_WRP018_P24-

28_Report_AAR_Final- V1_2024.09.03.pdf

Pier 24½ to Pier 28½ Bulkhead Wall and Wharf Earthquake Safety Retrofit Project Alternatives Analysis Report

Aug-24

SB-

R03_WRP018_SBCRP_Presentation _Update_2024-10.pdf

SOUTH BEACH COASTAL RESILIENCE

PROJECT Project Update

Oct-24

J9-R01_WRP002_J9Repl_NAR_Final 20221018.pdf

Wharf J9 Replacement and Resilient Shoreline Project Needs Assessment Report

Oct-22

J9- R02_WRP002_J9Repl_AAR_Final.p df

Wharf J9 Replacement and Resilient Shoreline Project Alternatives Analysis Report

Jan-24

SWEQ-

R01_WRP012_P9EQ_NAR_Final.pd f

Pier 9 Bulkhead Wall and Wharf Earthquake Safety Retrofit Project Needs Assessment Report

Oct-22

SWEQ-

R02_WRP012_P9EQ_AAR_V1.pdf

Pier 9 Bulkhead Wall and Wharf Substructure Earthquake Safety Retrofit Project Alternatives Analysis Report

Oct-23

SWEQ-R03_WRP012_P9EQ_

MemoSeisJointImpactPier_V2_2024.07.

09.pdf

Seismic Joint Impact on Pier, Pier 9 Bulkhead Wall and Wharf Substructure Earthquake Safety Retrofit Project

Jul-24

PWP-690 (4-26); Attachment 8 3 of 3 Reference Documents

SWEQ-R04_WRP012_P9EQ_Memo- SoilPropertiesSensitivityAnalysis_D1.pdf

Evaluations on FLAC 2D Models for Pier 9 and Pier 15

Apr-24

SWEQ-R05_WRP012_P9EQ_

WharfReplConstrutAnalysisMemo_V1_2 024.05.31.pdf

WRP012. Pier 9 Bulkhead Wall and Wharf Substructure Earthquake Safety Retrofit Project, Wharf Replacement Concepts Study

May-24

SWEQ-R06_WRP011_P15EQ_

NAR_Final.pdf

Pier 15 Bulkhead Wall and Wharf Earthquake Safety Retrofit Project Needs Assessment Report

Oct-22

SWEQ-R07_WRP011_P15EQ_AAR_V1_

2024.06.28.pdf

Pier 15 Bulkhead Wall and Wharf Substructure Earthquake Safety Retrofit Project Alternatives Analysis Report

Dec-23

2020.01.31 Floodproofing Piers -

Adaptive Measures Rpt_FINAL.pdf

FLOODPROOFING OF PIERS Technical Feasibility Assessment of Adaptive Flood Risk Mitigation Strategies

Jan-20

2021.01.08 Floodproofing Piers -

Significant Interventions Rpt_FINAL.pdf

FLOODPROOFING OF PIERS Technical Feasibility Assessment of Significant Intervention Flood Risk Mitigation Strategies

Jan-21

2022.01.19_Parsons_RJSD_Initial Southern Waterfront EQ Assessment_Final.pdf

INITIAL SOUTHERN WATERFRONT

EARTHQUAKE ASSESSMENT

Jan-22