Wittman airport control tower chiller replacement

Closed State & local contract opportunity

Solicitation number
ITB-089-2025
State
Wisconsin
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Winnebago County is soliciting sealed bids for the Wittman Airport Control Tower Chiller Replacement project, seeking a comprehensive solution to replace the existing chiller system at the airport. The procurement requires contractors to provide all necessary labor, equipment, and materials to upgrade the airport tower's cooling infrastructure. Specifically, the project involves removing the existing chiller (CH-1) and installing a new chiller (CH-001) with a 33.3 kW capacity, four compressors, and precise electrical and mechanical system modifications. A mandatory pre-bid meeting is scheduled for November 18, 2025, at 10:00 am at Gate #33, with sealed bids due on December 2, 2025, at 3:00 pm Central Time through the County's OpenGov Procurement portal. Contractors must submit a bid bond of 5% of the total bid amount and maintain bid validity for 60 calendar days. Evaluation criteria will likely include compliance with technical specifications detailed in the 23WINN03.00_BD_SPEC.pdf document, which outlines rigorous requirements for materials, installation methods, system testing, and performance standards.

The procurement does not explicitly indicate specific set-aside designations for disadvantaged enterprises. Contractors must meet comprehensive insurance requirements, including Workers' Compensation ($100,000 per accident), Commercial General Liability ($1,000,000 per occurrence), and Automobile Liability ($1,000,000 per occurrence). While no incumbent vendors are identified, the project requires integration with existing airport infrastructure, specifically electrical systems in rooms 110, 111, and 114 of the control tower. Contractors must provide a Certificate of Insurance and a Public Improvement Performance/Labor and Material Payment Bond. Although a specific budget is not disclosed, the detailed technical specifications and comprehensive requirements suggest a significant infrastructure investment. The county will retain 5% from each partial payment until 50% project completion, and invoices will be processed net 30, with Winnebago County maintaining a tax-exempt status for materials purchased.

Opportunity text

Winnebago County is requesting sealed bids to provide all labor, equipment and materials to replace the Wittman Airport Tower chiller.

Files

File Type Posted
WITTMAN_AIRPORT_CONTROL_TOWER_CHILLER_REPLACEMENT_(Addendum_#3_Revision).pdf PDF
WITTMAN_AIRPORT_CONTROL_TOWER_CHILLER_REPLACEMENT_(Addendum_#2_Revision).pdf PDF
WITTMAN_AIRPORT_CONTROL_TOWER_CHILLER_REPLACEMENT_(Addendum_#1_Revision).pdf PDF
WITTMAN_AIRPORT_CONTROL_TOWER_CHILLER_UPGRADE_REPLACEMENT.pdf PDF
Gate_33_Map.docx DOCX document
Gate_33_Map.docx DOCX document
Gate_33_Map.docx DOCX document
Gate_33_Map.docx DOCX document
23WINN03.00_BD_DWG.pdf PDF
23WINN03.00_BD_DWG.pdf PDF
23WINN03.00_BD_DWG.pdf PDF
23WINN0300_BD_SPEC.pdf PDF
23WINN0300_BD_SPEC.pdf PDF
23WINN0300_BD_SPEC.pdf PDF
23WINN03.00_BD_DWG.pdf PDF
23WINN0300_BD_SPEC.pdf PDF
GENERAL_CONDITIONS_for_Public_Works-MR.docx DOCX document
Insurance_Exhibit.pdf PDF
Insurance_Exhibit.pdf PDF
Subcontractor_List.pdf PDF
Insurance_Exhibit.pdf PDF
SAMPLE-PSA_CONTRACTOR.docx DOCX document
GENERAL_CONDITIONS_for_Public_Works-MR.docx DOCX document
Insurance_Exhibit.pdf PDF
SAMPLE-PSA_CONTRACTOR.docx DOCX document
Subcontractor_List.pdf PDF
GENERAL_CONDITIONS_for_Public_Works-MR.docx DOCX document
Subcontractor_List.pdf PDF
Subcontractor_List.pdf PDF
SAMPLE-PSA_CONTRACTOR.docx DOCX document
GENERAL_CONDITIONS_for_Public_Works-MR.docx DOCX document
SAMPLE-PSA_CONTRACTOR.docx DOCX document
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity