Crack Fill and Seal
Open State & local contract opportunity Posted
- Solicitation number
- P27-0015
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 76596 Recycled Road And Highway Equipment And Supplies (Not Otherwise Classified)
- 74502 Asphalt, Ac (Asphalt/Cement)
- 750 Road And Highway Building Materials, Non Asphaltic
- 59540 Nursery, Greenhouse And Floral Supplies: Labels, Planters, Pots, Tags, Trellises, Etc.
- 33575 Soil Stabilizers And Penetrants, Liquid And Solid
- 91327 Construction, Highway And Road
- 75570 Concrete Finishers, Power Driven
- 21010 Blocks, Hollow And Solid, Lightweight
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91364 Maintenance And Repair: Airport Roadway, Runway And Taxiway
- UNSPSC codes
- 30120000 Roads and landscape
- 30121600 Asphalts
- 30121700 Road and railroad construction materials
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 30121900 Soil stabilizers and reinforcing materials
- 30131514 Reinforced concrete built up culvert block
- 72141104 Highway and road resurfacing service
- 30121800 Landscape architecture materials
- 72141003 Highway and road maintenance service
Opportunity details come from peoriaaz.bonfirehub.com. Updated .
About this opportunity
The City of Peoria, Arizona is soliciting proposals for crack fill and seal services on an ongoing basis, with proposals due October 30, 2026. The estimated annual expenditure is $400,000 to $600,000 per fiscal year (July 1 to June 30).
The contractor shall provide all labor and equipment to clean cracks in existing bituminous pavement and apply asphalt-rubber sealant product supplied by the City. Work excludes pothole and alligator-crack patching. The contractor must furnish traffic control. The City supplies the asphalt-rubber sealant in approximately 35-pound blocks; the contractor is accountable for all material used and subject to audit of material usage by the Public Works Operations Manager or designee. Work must comply with the City's technical specifications.
Opportunity text
The City of Peoria has an ongoing requirement for crack fill services. It is the City's intent to contract for these services. Estimated Annual Expenditures on Crack Fill services for the City of Peoria per fiscal year (July 1 - June 30) is $400,000.00 - $600,000.00. Description: The contractor shall provide all necessary labor and equipment for cleaning cracks in the existing bituminous pavement and applying an asphalt-rubber sealant product supplied by the City of Peoria. The work does not include the patching of potholes or alligator cracks. Traffic control is necessary to accomplish the work and shall be provided by the contractor. The City of Peoria will provide the asphalt-rubber sealant product, furnished in approximately 35-pound blocks. The contractor is accountable for all material used and the Public Works Operations Manager or designee will audit material usage. The work shall be accomplished in accordance with the requirements of these specifications.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity