2025 - Berthoud Road Improvements Project
Closed State & local contract opportunity Posted
- Solicitation number
- 2025 - 06
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 150 Builder's Supplies
- 745 Road And Highway Building Materials, Asphaltic
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 914 Construction Services, Trades, New Construction
- 961 Miscellaneous Services, No. 1 (Not Otherwise Classified)
- 968 Public Works And Related Services
- UNSPSC codes
- 90000000 Travel and Food and Lodging and Entertainment Services
- 71100000 Mining services
- 73140000 Fibers and textiles and fabric industries
- 93150000 Public administration and finance services
- 72121603 Offshore wind farm geotechnical survey
- 72121604 Offshore wind farm installation and commissioning
- 72154062 Hot tapping service
- 70170000 Water resources development and oversight
- 30171515 Inspection door
- 80150000 Trade policy and services
Show all 28
- 82110000 Writing and translations
- 72154063 Stopple or line stopping service
- 83000000 Public Utilities and Public Sector Related Services
- 73130000 Food and beverage industries
- 78140000 Transport services
- 90120000 Travel facilitation
- 72121602 Offshore wind farm environmental survey
- 30110000 Concrete and cement and plaster
- 30170000 Doors and windows and glass
- 72140000 Heavy construction services
- 78120000 Material packing and handling
- 81120000 Economics
- 90140000 Commercial sports
- 93170000 Trade policy and regulation
- 72121600 Offshore wind farm service
- 72121601 Offshore wind farm development and project management
- 72121605 Offshore wind farm operation, maintenance and service
- 72121606 Offshore wind farm decommissioning
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Berthoud, located in Larimer County, Colorado, is soliciting bids for the 2025 Berthoud Road Improvements Project, a comprehensive infrastructure enhancement initiative. The procurement involves multiple bid items including asphalt mill and overlay of multiple roadways, alley reconstruction, and a curb-gutter-sidewalk project on Spartan Avenue. The project requires contractors to follow Colorado Department of Transportation (CDOT) standard specifications for ADA ramps, sidewalks, and curbs, with some areas potentially matching existing conditions. Bid documents are available through the Rocky Mountain E-Purchasing System (BidNet), with sealed bids due by 12:00 noon on Monday, April 28, 2025, and bid opening immediately thereafter at 12:01 p.m. All work must be completed by August 31, 2025, with liquidated damages of $500 per calendar day for work not finished by the contract deadline. Bidders are required to submit a 5% bid security and must provide unit prices for four distinct bid items: Mill & Overlay, Concrete Work, Spartan Ave. Improvements, and Alley Improvement. All requests for information must be submitted by Friday, April 18th.
The procurement does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. Contractors must comply with the Keep Jobs in Colorado Act by employing at least 80% Colorado labor and are required to provide performance and payment bonds, each for half the contract price. The project will require contractors to maintain liability insurance with a combined single limit of $1 million per occurrence. While specific budget details are not explicitly stated, the comprehensive nature of the project suggests a significant municipal infrastructure investment. The Town of Berthoud is exempt from Colorado State Sales and Use Taxes on materials and equipment incorporated into the work. The project includes various specific tasks such as pavement milling, asphalt overlay, concrete work, sidewalk construction, ADA ramp installation, and traffic control, with the town reserving the right to reject any or all bids and waive informalities not involving price, time, or changes in the work.
Opportunity text
The 2025 Berthoud Road Improvements Project consists of asphalt mill and overlay of multiple roadways, one alley reconstruction, and a curb-gutter-sidewalk project at Spartan Ave. Additional curb, gutter, drain pan, and sidewalk work adjacent to roadway improvements is also included in the project. Bidders should follow CDOT standard specifications for ADA ramps, sidewalks, and curbs. LCUASS standards included for rollover curbs but many areas may match existing conditions. *Construction documents are included for the Spartan Ave improvements and the Mary's Farm Alley Reconstruction Contract documents require that all work is completed before August 31, 2025