Road Improvements - Relevant Questions.pdf
PDF 158 KB Posted
- Attached to
- 2025 - Berthoud Road Improvements Project
- Solicitation number
- 2025 - 06
- Issued by
- Larimer County, Colorado
About this file
This document is a pre-bid meeting and addendum file for the 2025 Berthoud Road Improvements Project in Colorado, which involves clarifying project details after initial bids were rejected for being over budget. The project encompasses multiple roadway improvements, including asphalt mill and overlay on various roads, alley reconstruction, and curb-gutter-sidewalk work, particularly on Spartan Ave. Key project specifications include requirements for railroad right-of-way (ROW) permits and insurance, millings disposal at 232 1st St., and specific traffic control guidelines that allow for "local access only" during construction, with full road closures permitted during work hours and flaggers required on S. Berthoud Parkway.
The document addresses specific bid items (A, C, and D) with technical details such as geotechnical requirements (compaction only) and confirmation of no additional pavement markings or crosswalks on Spartan Ave. The project is time-sensitive, with all work mandated to be completed before August 31, 2025. Bidders are advised to follow CDOT standard specifications for ADA ramps, sidewalks, and curbs, with some flexibility to match existing conditions. The project was re-posted for bidding after the initial round of submissions exceeded the budget, indicating a revised scope or cost constraints.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Relevant Project Questions
The following questions are from a pre-bid meeting and addendum after this project was originally posted on 3/13/2025. The project bids were rejected for all being over budget. The project was modified and now reposted for bid.
Bid Item A
1. Will ROW permit and Insurance be required for railroad?
Yes
2. Does the Town want millings? What is the millings dump location?
Yes we will take millings. To be delivered to 232 1st St.
3. What is construction access and traffic control requirements?
Roads can be set up for "Local access only". Residents should be able to be directed in and out of work areas.
Larger milling or asphalt install can fully close road during work hours, with re-opening everyday. S. Berthoud Pkwy will require flaggers. ROW permits are required.
Bid Item C
1. What type of Geotech is necessary Compaction only
Bid Item D
1. Spartan Ave: Will any pavement markings be requited? Crosswalk?
No