Sidewalk Examples.pdf

PDF 245 KB Posted

Attached to
2025 - Berthoud Road Improvements Project
Solicitation number
2025 - 06
Issued by
Larimer County, Colorado

About this file

The document is a technical specification file containing visual examples of sidewalk construction types for the 2025 Berthoud Road Improvements Project in Colorado. The images demonstrate four distinct sidewalk scenarios: flagstone removal and 4' sidewalk construction, new 4' attached or detached sidewalk construction (with no existing sidewalk or flagstone), attached 4' sidewalk with rollover curb, and rollover sidewalk replacement with a 1' driveway transition strip. These examples appear to be reference materials for contractors bidding on the project, which includes roadway improvements, alley reconstruction, and curb-gutter-sidewalk work.

The project specifications indicate that work must be completed before August 31, 2025, and contractors are instructed to follow Colorado Department of Transportation (CDOT) standard specifications for ADA ramps, sidewalks, and curbs. Local Community Utility and Arterial Street Standards (LCUASS) are to be used for rollover curbs, though many areas may need to match existing conditions. The documentation covers improvements on Spartan Avenue and includes a Mary's Farm Alley Reconstruction component, providing visual guidance on the expected construction standards and sidewalk configurations for potential bidders.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sidewalk Examples

Flagstone Removal and 4’ Sidewalk Construction

New 4’ Attach or detached Sidewalk Construction – No existing sidewalk or flagstone

Attached 4’ Sidewalk with Rollover Curb

Attached 4’ Sidewalk

Rollover Sidewalk Replacement with 1’ Driveway Transition Strip

File details come from the government source that posted it. Updated .