Sidewalk Examples.pdf
PDF 245 KB Posted
- Attached to
- 2025 - Berthoud Road Improvements Project
- Solicitation number
- 2025 - 06
- Issued by
- Larimer County, Colorado
About this file
The document is a technical specification file containing visual examples of sidewalk construction types for the 2025 Berthoud Road Improvements Project in Colorado. The images demonstrate four distinct sidewalk scenarios: flagstone removal and 4' sidewalk construction, new 4' attached or detached sidewalk construction (with no existing sidewalk or flagstone), attached 4' sidewalk with rollover curb, and rollover sidewalk replacement with a 1' driveway transition strip. These examples appear to be reference materials for contractors bidding on the project, which includes roadway improvements, alley reconstruction, and curb-gutter-sidewalk work.
The project specifications indicate that work must be completed before August 31, 2025, and contractors are instructed to follow Colorado Department of Transportation (CDOT) standard specifications for ADA ramps, sidewalks, and curbs. Local Community Utility and Arterial Street Standards (LCUASS) are to be used for rollover curbs, though many areas may need to match existing conditions. The documentation covers improvements on Spartan Avenue and includes a Mary's Farm Alley Reconstruction component, providing visual guidance on the expected construction standards and sidewalk configurations for potential bidders.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sidewalk Examples
Flagstone Removal and 4’ Sidewalk Construction
New 4’ Attach or detached Sidewalk Construction – No existing sidewalk or flagstone
Attached 4’ Sidewalk with Rollover Curb
Attached 4’ Sidewalk
Rollover Sidewalk Replacement with 1’ Driveway Transition Strip