Z2DA--666-21-704 -ehrm next GEN wifi

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25923R0060
Agency
Veterans Integrated Service Network 19 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2DA Repair Or Alteration Of Hospitals And Infirmaries

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to provide construction services supporting the installation of replacement and new WiFi access points at the Sheridan, Wyoming VA Medical Center campus and related clinics. The selected contractor will install conduit, raceways, seal wall penetrations, set up infection control barriers, and install fire stopping systems to support work by an AT&T contractor upgrading WiFi infrastructure from October 3rd to 28th, 2022. The work must be completed within 60 days of the notice to proceed, with proposals due by July 13, 2023. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Network Contracting Office 19.

The solicitation involves installing approximately 48 conduits, 11 mounting brackets, sealing over 2,560 wall and floor penetrations, and pulling 4,601 feet of category 6a cable across multiple buildings in Sheridan, Wyoming and surrounding clinics. There is no set-aside designation. The NAICS code is 238210 and PSC code is F049. Work must be finished by 60 days from the notice to proceed and is to be performed at locations in Sheridan, Wyoming including the VA Medical Center campus and associated clinics.

Notice text

6 versions

Update #6 · Latest ·

666-21-704 -EHRM NEXT GEN WIFI Sheridan VAMC

SDVOSB Set-aside

Update #5 ·

Page 2 of 2

666-21-704 -EHRM NEXT GEN WIFI Sheridan VAMC

SDVOSB Set-aside

Update #4 ·

Page 2 of 2

EHRM NEXT GEN WIFI at Sheridan VAMC

SDVOSB set-aside

Update #3 ·

EHRM NEXT GEN WIFI at Sheridan VAMC

SDVOSB set-aside

Update #2 ·

CONSTRUCTION SCOPE OF WORK (SOW) EHRM NEXT GEN WIFI Sheridan, WY 666-21-704 1. GENERAL INTENT: The Contractor shall furnish all labor, tools, materials, and equipment to support installation of replacement and new WiFi Access Points (AP) that is being done by another OIT contract at the Sheridan WY campus located at 1989 Fort Road, Sheridan WY 82801. There will also be work at the Sheridan VA Water Filtration Plant, Sheridan s Community Based Outpatient Clinics (CBOC s) and other Centers. The addresses follow: Water Filtration Plant: Soldier Creek Rd, Sheridan, WY 82801 Afton CBOC: 125 South Washington Street, Afton, WY 83110 Casper VetCenter: 1030 N Poplar St, Casper, WY 82601 Riverton CBOC: 2300 Rose Lane, Riverton, WY 82501 Worland PCTOC: 510 South 15th Street, Worland, WY 82401 The AT&T NextGen WiFi Contractor is the OIT contractor and is responsible for the bulk of the cabling and Access Point Device installation work under a separate OI&T contract. Please note that the scope of this work is limited and specifically as listed below and in SOW Attachment 1. 2. STATEMENT OF WORK: Provide and install conduit, raceways, seal horizontal and vertical penetrations, set up infection control to meet the ICRA (Infection Control Risk Assessment), install fire stopping systems and other work to support NextGen WiFi Contractor s installation on the Sheridan WY, VA campus as shown and described in the project drawings, specifications, and this SOW. A list of required conduit paths and a description of work are provided in SOW Attachment 1. The drawings show the floor plans of the buildings, and the locations of APs. Work shall include: Installation of 48 conduit paths installed by the Contractor. This includes all components for a complete functioning system such as hangers, gang boxes for the mounting of Access Point (AP) devices, etc... All conduit ends shall be terminated so there are no rough edges. Installation of 11 Angle brackets for mounting of the Access AP devices. AP devices shall be provided by the VA or the NextGen WiFi Contractor, but the horizontal mounting brackets shall be provided and installed by the Contractor. Mounting Brackets shall be installed so that there is no exposed wire showing which may require minor modification of the Mounting Bracket. See Submittal Requirements in Paragraph 3.1. Other estimated quantities are in the Table below. The cumulative total of each column is considered accurate within +/- 20%. The Contractor shall field verify and notify the CO in writing with proof if quantities vary from what is shown below before the work is started. Any work done beyond what is shown by this SOW, Drawings and Specifications will be done at the Contractor own risk. No change in contract will be considered by the Government if the cumulative total of each column is within +/- 20%. Bldg No., Floor No., AP No. & Other Estimated No. of Penetrations Estimated Linear Ft of Conduit Estimated Linear Ft of Cat 6a Cable Total 627 2564 4601         B1, Bsmt, AP02 3 37 50 B1, Bsmt, AP03 2 15 30 B2, Bsmt, AP01 0 10 54 B2, Fl-1, AP04 3 25 36 B2, Fl-1, AP05 3 35 70 B3, Bsmt, AP01 3 30 55 B3, Bsmt, AP02 5 45 50 B5, Bsmt, AP06 3 45 65 B5, Bsmt,AP07 4 95 114 B5, Bsmt,AP08 3 60 70 B7, Bsmt,AP16 6 100 174 B7, Bsmt,AP17 5 125 135 B7, Bsmt,AP20 4 110 120 B7, Bsmt,AP21 3 80 95 B8, Bsmt,AP12 5 110 120 B8, Bsmt,AP13 4 50 60 B8, Bsmt,AP14 4 60 70 B8, Bsmt,AP15 2 55 65 B8, Bsmt,AP16 12 110 120 B8, Fl-2,AP09 4 71 81 B9, Fl-1,AP04 1 35 55 B9, Fl-1,AP06 3 61 80 B9, Fl-3,AP08 7 155 175 B11, Bsmt,AP01 0 10 35 B11, Bsmt,AP02 1 70 95 B11, Fl-1,AP05 2 140 165 B31, Fl-1,AP04 2 67 80 B31, Fl-1,AP05 4 155 170 B32, Fl-1,AP03 1 60 75 B35, Bsmt,AP05 0 48 75 B36, Fl-1,AP01 2 75 80 B36, Fl-1,AP02 1 50 55 B36, Fl-1,AP03 0 25 75 B55, Fl-1,AP01 1 70 210 B64, Fl-1,AP11 2 12 112 B64, Fl-1,AP12 2 12 102 B64, Fl-1,AP13 2 12 130 B64, Fl-1,AP14 2 20 150 B64, Fl-1,AP16 2 20 165 B64, Fl-1,AP17 2 12 25 B64, Fl-2,AP04 2 20 165 B64, Fl-2,AP05 2 12 122 B64, Fl-2,AP07 2 12 130 B64, Fl-2,AP08 2 25 165 B86, Fl-1,AP16 2 65 85 B86, Fl-1,AP46 2 20 40 B87, Fl-1,AP14 2 25 131 B90, Fl-1,AP01 0 8 20 Other Penetrations 498     2. The Contractor shall seal penetration caused by the installation of wire pathways and cabling of the AT&T NextGen WiFi Contractor. The Contractor shall seal all wall penetrations. Rated walls shall be sealed with fire stopping systems. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Note that tools and materials on the VA campus and buildings can never be left unattended and must be either in use or locked up. 3. The Contractor shall install 48 CAT 6A plenum rated cable runs from APs to nearest IT rooms and terminating in a patch panel. The AP side must have an RJ45 plug so that AT&T NextGen WiFi Contractor can mount the APs and just plug in. The Sheridan VA is planning to soon relocate wiring closets, so additional lengths of Cat 6a cable are in the contract to accommodate this future change. 4. There are 158 pathways at the Sheridan VAMC plus 51 at the CBOC s and the Water Filtration Plant that the AT&T NexGen WiFi will be installing. The Contractor will install infection dust control barriers, remove ceilings, provide negative air and other work in advance for AT&T NextGen WiFi Contractor according to the Infection Control Risk Assessment ICRAs shown in the matrix of Attachment 1. The AT&T NextGen WiFi Contractor will perform their work during the period of 10/3/22 10/28/22. The Contractor will coordinate with AT&T NextGen WiFi Contract Manager and make a schedule to prepare the work areas in advance, so the area is ready for the AT&T NextGen WiFi Contractor to install their cable and pathways. Upon completion of AT&T NextGen WiFi Contractor s work, then the Contractor will seal all wall and floor/ceiling penetrations, install Fire Stopping systems in fire rated walls, replace ceiling panels, reclip fire rated ceiling panels, paint and patch and other work needed to restore what the AT&T NextGen opened to do their work. Penetrations between floors in all buildings are to have Fire Stopping systems. Walls into Wire Closets are rated walls. Where cabling sags or touches ceiling panels, then the Contractor must install J-hooks to prevent this from happening. Each work area will be cleaned up by the Contractor in accordance with the IRCA requirements as well as remove barricades and equipment from work area. The Contractor shall also use Asbestos methods of construction as per specifications should asbestos be encountered in locations identified in the Sheridan VAMC - 2019 Asbestos Management Operations Plan as containing asbestos. The Sheridan VAMC - 2019 Asbestos Management Operations Plan has been included in the SOW Attachments. Any ceiling tile damaged by the Contractor or AT&T NextGen WiFi Contractor will be replaced by the Contractor. The Ceiling Type and Rated Wall documents have been included in the SOW Attachments. Recommend Offerors verify field conditions and make necessary measurements to confirm distances in a pre-bid site walk. Scales drawings are in the Ceiling Type documents for Sheridan. All work will be performed during business hours, Monday thru Friday, 7:30 AM to 4:00 PM unless written permission has been granted by the CO for special hours to accommodate Medical Center Operations or the AT&T NextGen WiFi Contractor. 3. PERIOD OF PERFORMANCE: 3.1 Work timelines and completion progress shall be communicated to the COR for tracking and coordinating purposes.   Work described in Section 2 shall be completed by 60 Days from issuance of notice to proceed.. The AT&T NextGen WiFi Contractor was scheduled for Oct 3rd through Oct 28th, 2022. The asbestos abatement, conduit work shall be completed prior to the AP install date.  4. REFERENCES: 4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 1.9  (Attachment 3). 4.2 Infrastructure Standards for Telecommunications Spaces Version 3.0 (dated August 21, 2020)  5. SPECIFICATIONS: DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 01 32 16.15 Project Schedule 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 74 19 Construction Waste Management DIVISION 02 EXISTING CONDITIONS 02 41 00 Demolition 02 82 13.13 Glovebag Asbestos Abatement DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 84 00 Firestopping DIVISION 27 COMMUNICATIONS 27 05 11 Requirements for Communications Installations 27 05 33 Raceways and Boxes for Communications Systems 27 15 00 Communications Structured Cabling 6. SUBMITTALS: The Contractor shall submit the following submittals for review: Product data and sample as required by each specification sections including conduits or raceways, J-hooks and other cable holding devices, cabling, cabling ends, all fasteners, protective bushings, fire stopping systems and brackets. Submit details for VA approval on how the brackets are to be installed and modified per each possible configuration. The brackets - wall are the ATS-APLBKT-COV-UNIV1. Submit details for VA approval on how the conduit will be terminated in Bldg 2, floor 1 to minimize damage to historical ceiling. Submit other installations details as called out in SOW Attachment 1. The exact mounting height of the horizontal bracket mount is to be determined by AT&T but can be assumed to be within 24 of the suspended ceiling. As-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements. End of SOW

Update #1 ·

CONSTRUCTION SCOPE OF WORK (SOW)

EHRM NEXT GEN WIFI Sheridan, WY

666-21-704

1. GENERAL INTENT:

The Contractor shall furnish all labor, tools, materials, and equipment to support installation of replacement and new WiFi Access Points (AP) that is being done by another OIT contract at the Sheridan WY campus located at 1989 Fort Road, Sheridan WY 82801. There will also be work at the Sheridan VA Water Filtration Plant, Sheridan s Community Based Outpatient Clinics (CBOC s) and other Centers. The addresses follow:

Water Filtration Plant: Soldier Creek Rd, Sheridan, WY 82801

Afton CBOC: 125 South Washington Street, Afton, WY 83110

Casper VetCenter: 1030 N Poplar St, Casper, WY 82601

Riverton CBOC: 2300 Rose Lane, Riverton, WY 82501

Worland PCTOC: 510 South 15th Street, Worland, WY 82401

The AT&T NextGen WiFi Contractor is the OIT contractor and is responsible for the bulk of the cabling and Access Point Device installation work under a separate OI&T contract. Please note that the scope of this work is limited and specifically as listed below and in SOW Attachment 1.

2. STATEMENT OF WORK:

Provide and install conduit, raceways, seal horizontal and vertical penetrations, set up infection control to meet the ICRA (Infection Control Risk Assessment), install fire stopping systems and other work to support NextGen WiFi Contractor s installation on the Sheridan WY, VA campus as shown and described in the project drawings, specifications, and this SOW. A list of required conduit paths and a description of work are provided in SOW Attachment 1. The drawings show the floor plans of the buildings, and the locations of APs.

Work shall include:

Installation of 48 conduit paths installed by the Contractor. This includes all components for a complete functioning system such as hangers, gang boxes for the mounting of Access Point (AP) devices, etc... All conduit ends shall be terminated so there are no rough edges.

Installation of 11 Angle brackets for mounting of the Access AP devices. AP devices shall be provided by the VA or the NextGen WiFi Contractor, but the horizontal mounting brackets shall be provided and installed by the Contractor. Mounting Brackets shall be installed so that there is no exposed wire showing which may require minor modification of the Mounting Bracket. See Submittal Requirements in Paragraph 3.1.

Other estimated quantities are in the Table below. The cumulative total of each column is considered accurate within +/- 20%. The Contractor shall field verify and notify the CO in writing with proof if quantities vary from what is shown below before the work is started. Any work done beyond what is shown by this SOW, Drawings and Specifications will be done at the Contractor own risk. No change in contract will be considered by the Government if the cumulative total of each column is within +/- 20%.

Bldg No., Floor No., AP No. & Other

Estimated No. of Penetrations

Estimated Linear Ft of Conduit

Estimated Linear Ft of Cat 6a Cable

Total

627

2564

4601

Â

Â

Â

Â

B1, Bsmt, AP02

3

37

50

B1, Bsmt, AP03

2

15

30

B2, Bsmt, AP01

0

10

54

B2, Fl-1, AP04

3

25

36

B2, Fl-1, AP05

3

35

70

B3, Bsmt, AP01

3

30

55

B3, Bsmt, AP02

5

45

50

B5, Bsmt, AP06

3

45

65

B5, Bsmt,AP07

4

95

114

B5, Bsmt,AP08

3

60

70

B7, Bsmt,AP16

6

100

174

B7, Bsmt,AP17

5

125

135

B7, Bsmt,AP20

4

110

120

B7, Bsmt,AP21

3

80

95

B8, Bsmt,AP12

5

110

120

B8, Bsmt,AP13

4

50

60

B8, Bsmt,AP14

4

60

70

B8, Bsmt,AP15

2

55

65

B8, Bsmt,AP16

12

110

120

B8, Fl-2,AP09

4

71

81

B9, Fl-1,AP04

1

35

55

B9, Fl-1,AP06

3

61

80

B9, Fl-3,AP08

7

155

175

B11, Bsmt,AP01

0

10

35

B11, Bsmt,AP02

1

70

95

B11, Fl-1,AP05

2

140

165

B31, Fl-1,AP04

2

67

80

B31, Fl-1,AP05

4

155

170

B32, Fl-1,AP03

1

60

75

B35, Bsmt,AP05

0

48

75

B36, Fl-1,AP01

2

75

80

B36, Fl-1,AP02

1

50

55

B36, Fl-1,AP03

0

25

75

B55, Fl-1,AP01

1

70

210

B64, Fl-1,AP11

2

12

112

B64, Fl-1,AP12

2

12

102

B64, Fl-1,AP13

2

12

130

B64, Fl-1,AP14

2

20

150

B64, Fl-1,AP16

2

20

165

B64, Fl-1,AP17

2

12

25

B64, Fl-2,AP04

2

20

165

B64, Fl-2,AP05

2

12

122

B64, Fl-2,AP07

2

12

130

B64, Fl-2,AP08

2

25

165

B86, Fl-1,AP16

2

65

85

B86, Fl-1,AP46

2

20

40

B87, Fl-1,AP14

2

25

131

B90, Fl-1,AP01

0

8

20

Other Penetrations

498

Â

Â

2. The Contractor shall seal penetration caused by the installation of wire pathways and cabling of the AT&T NextGen WiFi Contractor. The Contractor shall seal all wall penetrations. Rated walls shall be sealed with fire stopping systems. Existing conduit paths between floors/IT rooms will not have the capacity for more cable and new conduit paths will need to be created. Note that tools and materials on the VA campus and buildings can never be left unattended and must be either in use or locked up.

3. The Contractor shall install 48 CAT 6A plenum rated cable runs from APs to nearest IT rooms and terminating in a patch panel. The AP side must have an RJ45 plug so that AT&T NextGen WiFi Contractor can mount the APs and just plug in. The Sheridan VA is planning to soon relocate wiring closets, so additional lengths of Cat 6a cable are in the contract to accommodate this future change.

4. There are 158 pathways at the Sheridan VAMC plus 51 at the CBOC s and the Water Filtration Plant that the AT&T NexGen WiFi will be installing. The Contractor will install infection dust control barriers, remove ceilings, provide negative air and other work in advance for AT&T NextGen WiFi Contractor according to the Infection Control Risk Assessment ICRAs shown in the matrix of Attachment 1. The AT&T NextGen WiFi Contractor will perform their work during the period of 10/3/22 10/28/22. The Contractor will coordinate with AT&T NextGen WiFi Contract Manager and make a schedule to prepare the work areas in advance, so the area is ready for the AT&T NextGen WiFi Contractor to install their cable and pathways. Upon completion of AT&T NextGen WiFi Contractor s work, then the Contractor will seal all wall and floor/ceiling penetrations, install Fire Stopping systems in fire rated walls, replace ceiling panels, reclip fire rated ceiling panels, paint and patch and other work needed to restore what the AT&T NextGen opened to do their work. Penetrations between floors in all buildings are to have Fire Stopping systems. Walls into Wire Closets are rated walls. Where cabling sags or touches ceiling panels, then the Contractor must install J-hooks to prevent this from happening. Each work area will be cleaned up by the Contractor in accordance with the IRCA requirements as well as remove barricades and equipment from work area. The Contractor shall also use Asbestos methods of construction as per specifications should asbestos be encountered in locations identified in the Sheridan VAMC - 2019 Asbestos Management Operations Plan as containing asbestos. The Sheridan VAMC - 2019 Asbestos Management Operations Plan has been included in the SOW Attachments. Any ceiling tile damaged by the Contractor or AT&T NextGen WiFi Contractor will be replaced by the Contractor. The Ceiling Type and Rated Wall documents have been included in the SOW Attachments.

Recommend Offerors verify field conditions and make necessary measurements to confirm distances in a pre-bid site walk. Scales drawings are in the Ceiling Type documents for Sheridan.

All work will be performed during business hours, Monday thru Friday, 7:30 AM to 4:00 PM unless written permission has been granted by the CO for special hours to accommodate Medical Center Operations or the AT&T NextGen WiFi Contractor.

3. PERIOD OF PERFORMANCE:

3.1 Work timelines and completion progress shall be communicated to the COR for tracking and coordinating purposes.

Â

Work described in Section 2 shall be completed by 60 Days from issuance of notice to proceed.. The AT&T NextGen WiFi Contractor was scheduled for Oct 3rd through Oct 28th, 2022. The asbestos abatement, conduit work shall be completed prior to the AP install date.Â

4. REFERENCES:

4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 1.9Â (Attachment 3).

4.2 Infrastructure Standards for Telecommunications Spaces Version 3.0 (dated August 21, 2020)Â

5. SPECIFICATIONS:

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements

01 32 16.15 Project Schedule

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

01 74 19 Construction Waste Management

DIVISION 02 EXISTING CONDITIONS

02 41 00 Demolition

02 82 13.13 Glovebag Asbestos Abatement

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 84 00 Firestopping

DIVISION 27 COMMUNICATIONS

27 05 11 Requirements for Communications Installations

27 05 33 Raceways and Boxes for Communications Systems

27 15 00 Communications Structured Cabling

6. SUBMITTALS:

The Contractor shall submit the following submittals for review:

Product data and sample as required by each specification sections including conduits or raceways, J-hooks and other cable holding devices, cabling, cabling ends, all fasteners, protective bushings, fire stopping systems and brackets. Submit details for VA approval on how the brackets are to be installed and modified per each possible configuration. The brackets - wall are the ATS-APLBKT-COV-UNIV1. Submit details for VA approval on how the conduit will be terminated in Bldg 2, floor 1 to minimize damage to historical ceiling. Submit other installations details as called out in SOW Attachment 1. The exact mounting height of the horizontal bracket mount is to be determined by AT&T but can be assumed to be within 24 of the suspended ceiling.

As-built drawings for all data locations and labels. The Contractor shall provide the central drawing set to the Owner at the end of the project. The marked-up drawing set will accurately depict the as-built status of the system.

The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for this project. Contractor shall refer to drawings and specifications for comprehensive construction requirements.

End of SOW

Attachments

Files attached to this notice, newest first
File Type Posted
Gillette Hall.png PNG image
Worland.png PNG image
Afton Hall.docx DOCX document
36C25923R0060 0005.docx DOCX document
36C25923R0060 0004.docx DOCX document
36C25923R0060 0003.docx DOCX document
B35 photo.jpeg JPEG file
01 SOW- Attachment 01 - Access Point Work per device - new.pdf PDF
P01_ Construction SOW-Sheridan EHRM NextGen WiFi RFI 1 new.docx DOCX document
RFI 5.15 (002).docx DOCX document
36C25923R0060 0002.docx DOCX document
36C25923R0060 0001.docx DOCX document
15 SOW Attachment 15 - IRCA.NEXTGen WiFi Rock Springs.pdf PDF
08 SOW Attachment 08 -Sheridan VAMC - 2019 Asbestos Management Operations Plan_FINAL.pdf PDF
07 SOW Attachment 07 - Ceiling Types.pdf PDF
00 Construction SOW-Sheridan EHRM NextGen WiFi 11-23-22.pdf PDF
01 SOW- Attachment 01 - Access Point Work per device - 11-23-22.pdf PDF
36C25923R0060_1.docx DOCX document
16 SOW Attachment 16 - Rated Wall Locations Sheridan.pdf PDF
10 SOW Attachment 10 - IRCA.NEXTGen WiFi AFTON.pdf PDF
09 SOW Attachment 09 - IRCA.NEXTGen WiFi Worland.pdf PDF
04 SOW Attachment 04 - CBOC NextGen WiFi Access Point Location Drawings.pdf PDF
03_ Attachment 03 - VA OEHRM Site Infrastructure and EUD Requirements V2.pdf PDF
Past Performance Questionnaire.docx DOCX document
14 SOW Attachment 14 - IRCA.NEXTGen WiFi Riverton.pdf PDF
18 IGCE-704 EHRM nex gen wifi Estimate Nov 22.pdf PDF
17 SOW Attachment 17 - Sensitive Infrastructure Data Classification Memo.pdf PDF
06 Attachment 6 - EHRM Next Gen Wifi Specifications.pdf PDF
05 SOW Attachment 05 - Seasonal Influenza with Vaccines.pdf PDF
02 SOW Attachment 02 - Sheridan NextGen WiFi Access Point Location Drawings.pdf PDF
S22- 852.219-75 LOS Certificaiton.docx DOCX document
Show all 31

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z2DA--666-21-704 -ehrm next GEN wifi 666-C30161 Award Award Notice
Z2DA--666-21-704 -ehrm next GEN wifi This notice · Latest solicitation Solicitation
Z2DA--666-21-704 -ehrm next GEN wifi Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity