01 SOW- Attachment 01 - Access Point Work per device - new.pdf

PDF 120 KB Posted

Attached to
Z2DA--666-21-704 -EHRM NEXT GEN WIFI Federal contract opportunity
Solicitation number
36C25923R0060
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This scope of work document outlines requirements for a federal construction contract to support WiFi access point installation at various Department of Veterans Affairs medical facilities in Sheridan, Wyoming. The contractor will be responsible for installing 48 conduit paths, 11 mounting brackets, sealing penetrations, installing fire stopping systems, and supporting infection control requirements to allow for a separate contractor to install WiFi access points. Additional responsibilities include installing cable runs and terminating connections. Work must be completed within 60 days of the notice to proceed. The access point installation work by the separate contractor is scheduled for October 3rd through 28th, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--666-21-704 -EHRM NEXT GEN WIFI, newest first.
File Type Posted
Gillette Hall.png PNG image
Worland.png PNG image
Afton Hall.docx DOCX document
36C25923R0060 0005.docx DOCX document
36C25923R0060 0004.docx DOCX document
36C25923R0060 0003.docx DOCX document
B35 photo.jpeg JPEG file
RFI 5.15 (002).docx DOCX document
36C25923R0060 0002.docx DOCX document
P01_ Construction SOW-Sheridan EHRM NextGen WiFi RFI 1 new.docx DOCX document
36C25923R0060 0001.docx DOCX document
15 SOW Attachment 15 - IRCA.NEXTGen WiFi Rock Springs.pdf PDF
08 SOW Attachment 08 -Sheridan VAMC - 2019 Asbestos Management Operations Plan_FINAL.pdf PDF
07 SOW Attachment 07 - Ceiling Types.pdf PDF
18 IGCE-704 EHRM nex gen wifi Estimate Nov 22.pdf PDF
17 SOW Attachment 17 - Sensitive Infrastructure Data Classification Memo.pdf PDF
06 Attachment 6 - EHRM Next Gen Wifi Specifications.pdf PDF
05 SOW Attachment 05 - Seasonal Influenza with Vaccines.pdf PDF
02 SOW Attachment 02 - Sheridan NextGen WiFi Access Point Location Drawings.pdf PDF
S22- 852.219-75 LOS Certificaiton.docx DOCX document
16 SOW Attachment 16 - Rated Wall Locations Sheridan.pdf PDF
10 SOW Attachment 10 - IRCA.NEXTGen WiFi AFTON.pdf PDF
09 SOW Attachment 09 - IRCA.NEXTGen WiFi Worland.pdf PDF
04 SOW Attachment 04 - CBOC NextGen WiFi Access Point Location Drawings.pdf PDF
03_ Attachment 03 - VA OEHRM Site Infrastructure and EUD Requirements V2.pdf PDF
Past Performance Questionnaire.docx DOCX document
14 SOW Attachment 14 - IRCA.NEXTGen WiFi Riverton.pdf PDF
00 Construction SOW-Sheridan EHRM NextGen WiFi 11-23-22.pdf PDF
01 SOW- Attachment 01 - Access Point Work per device - 11-23-22.pdf PDF
36C25923R0060_1.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bldg Fl AP No. No. of Cable runs

Conduit Required

AP

Bracket

ICRA Class required

53 9

1 B AP03 1 Yes I

AP03 is additional and requires a new conduit path from AP to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus provide and pull new Cat6a cabling. Paint conduit to match ceiling color.

Provide cable service loop. Add 8' of extra cable for future move. Ceiling is hard pan -concrete and plaster. Follow infection control as per IRCA

2 B AP01 1 Yes I

Provide new conduit path and cabling from AP01 to Wiring Closet. Provide 3/4", 4 11/16" Dual Gang Box for path plus pull new Cat6a. Provide service loop with enough cable length for future move to B2, room 102. Ceiling hard pan - plaster. Follow infection control as per IRCA.

2 1 AP05 1 Yes 1 I

3 B AP02 1 Yes I

5 B AP06 1 Yes I

Provide new conduit path and cabling from AP06 to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster. Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

Comments

Provide new conduit path and cabling from AP05 to Wiring Closet. Provide 3/4" conduit thru attic for path plus pull new Cat6a. Provide service loop with enough cable length for future move to B2, room 102. Provide and install horizontal Bracket for AP and wire mold equivalent to 3/4" conduit size from ceiling to bracket. Ceiling is a metal pan historic ceiling. Submit details for VA approval on installation to minimize damage to ceiling and path to horizontal bracket.

Provide new conduit path and cabling from AP02 to Wiring Closet. Provide 3/4" conduit for path plus pull new Cat6a. Submit details for VA approval on conduit path such as snaking in conduit thru floor joists or cutting and finishing ceiling. Provide service loop plus and additional 10' for a future move. Ceiling is hard pan dry wall. Follow infection control as per IRCA.

Total

5 B AP07 1 Yes I

Provide new conduit path and cabling from AP07 to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster. Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

5 B AP08 1 Yes I

Provide new conduit path and cabling from AP08 to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster. Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

5 1 AP11 1 No I

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed.

Ceiling is suspended. Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

5 2 AP10 1 No I

5 2 AP11 1 No I

5 2 AP12 1 No I

5 2 AP13 1 No I

7 B AP16 1 Yes 1 I

Provide new conduit path and cabling from AP16 to Data Closet 001. Provide 3/4" conduit plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed. Provide service loop . Add 6' of extra cable for future move.

Ceiling is hard pan plaster or drywall. Follow infection control as per IRCA.

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed. Ceiling is suspended.

Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed. Ceiling is suspended.

Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed. Ceiling is suspended.

Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed. Ceiling is suspended.

Provide enough cable length for future move to Bldg 5, room 114A. Follow infection control as per IRCA.

7 B AP17 1 Yes 1 I

Provide new conduit path and cabling from AP17 to Data Closet 001. Provide 3/4" conduit plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed. Provide service loop. Add 6' of extra cable for future move.

Ceiling is hard pan plaster or daywall. Follow infection control as per IRCA.

7 B AP20 1 Yes I

Provide new conduit path and cabling from AP20 to Data Closet 001. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop. Follow infection control as per IRCA.

7 B AP21 1 Yes I

Provide new conduit path and cabling from AP21 to Data Closet 001. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Paint conduit to match ceiling color. Provide service loop. Add 6' of extra cable for future move. Follow infection control as per IRCA.

8 B AP12 1 Yes I

Provide new conduit path and cabling from AP12 to Switch Closet 001. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move.

Follow infection control as per IRCA.

8 B AP13 1 Yes I

Provide new conduit path and cabling from AP13 to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move.

Follow infection control as per IRCA.

8 AP14 1 Yes I

Provide new conduit path and cabling from AP14 to Data Closet 001. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move.

Follow infection control as per IRCA.

8 B AP15 1 Yes I

Provide new conduit path and cabling from AP15 to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move.

Follow infection control as per IRCA.

8 B AP16 1 Yes I

Provide new conduit path and cabling from AP16 to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move.

Follow infection control as per IRCA.

9 1 AP06 1 Yes I

Provide new conduit path and cabling from AP06 to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Paint conduit to match ceiling color. Ceiling is Hard pan - plaster or dry wall. Provide service loop plus an addtional 6' of cable for future move. Follow infection control as per IRCA.

11 B AP01 1 Yes I

Provide new conduit path and cabling from AP01 new location to Switch Closet.

Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan - plaster or dry wall. Provide service loop plus additional cable length for future move to B11, room 109. Follow infection control as per IRCA.

11 B AP02 1 Yes I

Provide new conduit path and cabling from AP02 new location to Switch Closet.

Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan - plaster or dry wall. Provide service loop plus additional cable length for future move to B11, room 109. Follow infection control as per IRCA.

11 1 AP03 1 Yes I

Provide extend existing conduit path and install new Cat6A cabling from AP03 new location to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan - plaster or dry wall. Provide service loop plus additional cable length for future move to B11, room 109. Follow infection control as per IRCA.

11 1 AP05 1 Yes I

Provide extend existing conduit path and install new Cat6A cabling from AP05 new location to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan - plaster or dry wall. Provide service loop. Follow infection control as per IRCA.

31 1 AP04 1 Yes 1 I

Provide new conduit path and cabling from AP04 to Wiring Closet. Provide 3/4" conduit for path plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed. Provide service loop. Follow infection control as per IRCA.

31 AP05 1 Yes I

Provide new conduit path and cabling from AP05 to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. . Provide service loop.

Ceiling is hard pan concrete. Follow infection control as per IRCA.

32 1 AP03 1 Yes I

Provide new 3/4" conduit path and cabling from AP05 to Switch Closet. On finished ceiling provide wire mold equivalent to 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan - Tile glued to drywall. Provide service loop. Follow infection control as per IRCA.

35 B AP05 1 Yes I

Provide new conduit path and cabling from AP05 to Switch Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Ceiling is Hard pan -plaster. Provide 15' service loop. Follow infection control as per IRCA.

36 1 AP01 1 Yes 1 I

Provide new conduit path and cabling from AP01 to Wiring Closet. Provide 3/4" conduit for path plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed to bracket. Provide service loop. Ceiling is hard pan-plaster and wood. Follow infection control as per IRCA.

36 1 AP02 1 Yes 1 I

Provide new conduit path and cabling from AP02 to Wiring Closet. Provide 3/4" conduit for path plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed to bracket. Provide service loop. Ceiling is hard pan-plaster and wood. Follow infection control as per IRCA.

36 1 AP03 1 Yes 1 I

Provide new conduit path and cabling from AP03 to Wiring Closet. Provide 3/4" conduit for path plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed to bracket. Provide service loop plus add addtional length for a future move to B36 room 102. Ceiling is hard pan-plaster and wood.

Follow infection control as per IRCA.

55 1 AP01 1 Yes I

Provide new conduit path and cabling from AP01 to Wiring Closet located in B36.

Provide 3/4" conduit for path to gang box in the SW lower corner of B55 plus pull new Cat6a to the Wiring Closet in B36 thru the existing 1" buried conduit system.

Provide and install a 4 11/16" Dual Gang box for AP. Provide service loop plus additional cable length for a future move to B36 room 102. Ceiling is hard pan-plaster and wood. Follow infection control as per IRCA.

61 1 AP08 1 No I

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed.

Ceiling is suspended. Provide enough cable length for future move to new racks within the wiring closet i.e. 30' of loop. Follow infection control as per IRCA. Note:

Work will require working in autormium ceiling witch is 16' high. Walking planks will have to be temporarly extended, fall protection used and other safety protection used as required.

61 AP09 1 No I

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed.

Ceiling is suspended. Provide enough cable length for future move to new racks within the wiring closet i.e. 30' of loop. Follow infection control as per IRCA. Note:

Work will require working in autormium ceiling witch is 16' high. Walking planks will have to be temporarly extended, fall protection used and other safety protection used as required

90 1 AP01 1 Yes 1 I

Provide new conduit path and cabling from AP01 to Wiring Closet. Provide 3/4" conduit, 4 11/16" Dual Gang Box for path plus pull new Cat6a. Provide and install a Horizontal mounting bracket -wall for AP. Submit details for VA approval on path to horizontal bracket and any modification needed to bracket. Provide service loop and additional 10' of cable length for future move. Ceiling is hard pan concrete. Follow infection control as per IRCA.

AftonCBOC 1 AP01 1 No 1 See SOW

Provide new Cat 6a and J-hooks pathway from AP to Wiring Closet. J-hooks must attach to deck or wall. Attaching to ceiling grid or other utilities will not be allowed.

Provide enough 8' servoce loop. Follow infection control as per IRCA. Submit details for VA approval on path to horizontal bracket and any modification needed to bracket.

AftonCBOC 1 AP02 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

AftonCBOC 1 AP03 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

AftonCBOC 1 AP04 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

AftonCBOC 1 AP05 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP01 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP02 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP03 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP04 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP06 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP07 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP08 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

RivertonCBOC 1 AP09 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

Rock Springs CBOC 1 AP01 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

Worland PCTOC 1 AP01 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

Worland PCTOC 1 AP02 1 Yes See SOW

Provide new conduit path and new Cat6A cabling from AP to Wiring Closet. Provide 3/4" conduit for path. Provide 8' service loop. Follow infection control as per IRCA.

Seal all pentrations,and use fire stop systems thru attic penetrations.

vhashereichc Cross-Out