Repair Storm Water System, Basewide

Award Notice Posted

Solicitation number
FA6703-14-B-0003
Agency
Awarded
to Lewis Contracting Services, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
FA6703-14-C-0007 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
1538 Atlantic Ave Dobbins ARB, GA Marietta, Georgia 30069, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Aug 05, 2014 1:33 pm Modified: Sep 11, 2014 4:38 pmTrack Changes This is a Solicitation Notice.  This notice does constitute an Invitation for Bid.  Dobbins Air Reserve Base has a requirement to Repair Storm Water Drainage, Basewide at Dobbins ARB, GA.  This requirement is 100% Total Set-Aside for Small Business.  Set-aside is in accordance with FAR 19.502-2.

NOTICE TO OFFEROR: Funds are not presently available for this project.  No award will be made until funds are available to make payments under a contract.  The Government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing, with no obligation to the offeror by the Government.


Work consist of but is not limited to providing all materials, equipment, labor, supervision, and incidentals necessary to repair Dobbins ARB storm drain in accordance with the project's specifications and drawings.  The specifications and drawings will be posted as attachments to the solicitation.


The work under this project is separated into four different areas. Site A consists of the elimination of drainage and erosions issues on both sides of Gym Road. Site B consists of the repair of an existing drainage feature to prevent drainage flow from entering Little Lake. Site C consist of the repair to the drainage channel alongside Spill Pond 3. Site D consists of the constructing measure to prevent sediment from being discharged into a downstream wetland from the USAF Civil Engineering Training Site.


Contractor must be capable of being a Primary Permittee during the project per Clean Water Act (CWA) section 404 permits and Georgia Soil and Water Conversation.  Onsite Superintendent must be Georgia Soil and Water Conversation Commission (GSWCC) certified.


 


NAICS 237110, Water and Sewer Line and Related Structures Construction.
Small Business Size $36.5M
Magnitude $250K - $500K


Solicitation will be - Invitation for Bid (IFB)


Contract will be Firm-Fixed-Price


NOTE: All contractors must be registered in the System for Award Management (SAM) program in order to receive a contract award from any DOD activity. Contractors may access the Internet site at: https://www.sam.gov to register and/or obtain information about the SAM program.


NOTE: IAW FAR 52.236-1, Performance of Work by the Contractor, the contractor shall be required to perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract.


The solicitation will be available on or about 20 August 2014 on the Federal Business Opportunities web page at http://www.fbo.gov. Paper copies will not be available. The anticipated bid closing date/time is 22 September 2014 @ 02:00 p.m. Eastern Standard Time.  Bid opening is anticipated to occur thirty (30) minutes after bid closing time at the 94th Contracting Squadron, Bldg 812, 1538 Atlantic Ave., Dobbins ARB 30069


Once the solicitation is posted, it is incumbent upon the interested parties to visit this website frequently for any updates and/or amendments to all documents. Primary point of contact (POC): Patrina Sheffield, Contracting Officer, Phone (678) 655-5778, FAX (678) 655-5612, e-mail: patrina.sheffield@us.af.mil. Alternate POC: Mr. Thomas Milloy, Contracting Officer, Phone (678) 655-5783, e-mail: thomas.milloy@us.af.mil. Send all correspondence to: 94th Contracting Squadron, Attn: Patrina Sheffield, 1538 Atlantic Ave., Dobbins ARB 30069

Update #2 ·

Added: Aug 05, 2014 1:33 pm Modified: Aug 20, 2014 8:40 amTrack Changes This is a Solicitation Notice.  This notice does constitute an Invitation for Bid.  Dobbins Air Reserve Base has a requirement to Repair Storm Water Drainage, Basewide at Dobbins ARB, GA.  This requirement is 100% Total Set-Aside for Small Business.  Set-aside is in accordance with FAR 19.502-2.

NOTICE TO OFFEROR: Funds are not presently available for this project.  No award will be made until funds are available to make payments under a contract.  The Government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing, with no obligation to the offeror by the Government.


Work consist of but is not limited to providing all materials, equipment, labor, supervision, and incidentals necessary to repair Dobbins ARB storm drain in accordance with the project's specifications and drawings.  The specifications and drawings will be posted as attachments to the solicitation.


The work under this project is separated into four different areas. Site A consists of the elimination of drainage and erosions issues on both sides of Gym Road. Site B consists of the repair of an existing drainage feature to prevent drainage flow from entering Little Lake. Site C consist of the repair to the drainage channel alongside Spill Pond 3. Site D consists of the constructing measure to prevent sediment from being discharged into a downstream wetland from the USAF Civil Engineering Training Site.


Contractor must be capable of being a Primary Permittee during the project per Clean Water Act (CWA) section 404 permits and Georgia Soil and Water Conversation.  Onsite Superintendent must be Georgia Soil and Water Conversation Commission (GSWCC) certified.


 


NAICS 237110, Water and Sewer Line and Related Structures Construction.
Small Business Size $36.5M
Magnitude $250K - $500K


Solicitation will be - Invitation for Bid (IFB)


Contract will be Firm-Fixed-Price


NOTE: All contractors must be registered in the System for Award Management (SAM) program in order to receive a contract award from any DOD activity. Contractors may access the Internet site at: https://www.sam.gov to register and/or obtain information about the SAM program.


NOTE: IAW FAR 52.236-1, Performance of Work by the Contractor, the contractor shall be required to perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract.


The solicitation will be available on or about 20 August 2014 on the Federal Business Opportunities web page at http://www.fbo.gov. Paper copies will not be available. The anticipated bid closing date/time is 22 September 2014 @ 12:00 p.m. Eastern Standard Time.  Bid opening is anticipated to occur thirty (30) minutes after bid closing time at the 94th Contracting Squadron, Bldg 812, 1538 Atlantic Ave., Dobbins ARB 30069


Once the solicitation is posted, it is incumbent upon the interested parties to visit this website frequently for any updates and/or amendments to all documents. Primary point of contact (POC): Patrina Sheffield, Contracting Officer, Phone (678) 655-5778, FAX (678) 655-5612, e-mail: patrina.sheffield@us.af.mil. Alternate POC: Mr. Thomas Milloy, Contracting Officer, Phone (678) 655-5783, e-mail: thomas.milloy@us.af.mil. Send all correspondence to: 94th Contracting Squadron, Attn: Patrina Sheffield, 1538 Atlantic Ave., Dobbins ARB 30069

Update #1 ·

Added: Aug 05, 2014 1:33 pm  

This is a Pre-Solicitation Notice.  This notice does NOT constitute a request for proposal, request for quote or invitation for bid.  Dobbins Air Reserve Base has a requirement to Repair Storm Water Drainage, Basewide at Dobbins ARB, GA.  This requirement is 100% set-aside for Small Business.  Set-aside is in accordance with FAR 19.502-2.


 


NOTICE TO OFFEROR: Funds are not presently available for this project.  No award will be made until funds are available to make payments under a contract.  The Government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing, with no obligation to the offeror by the Government.


Work consist of but is not limited to providing all materials, equipment, labor, supervision, and incidentals necessary to repair Dobbins ARB storm drain in accordance with the project's specifications and drawings.  The specifications and drawings will be posted as attachments to the solicitation.


 


The work under this project is separated into four different areas. Site A consists of the elimination of drainage and erosions issues on both sides of Gym Road. Site B consists of the repair of an existing drainage feature


to prevent drainage flow from entering Little Lake. Site C consist of the repair to the drainage channel alongside Spill Pond 3. Site D consists of the constructing measure to prevent sediment from being discharged into a downstream wetland from the USAF Civil Engineering Training Site.


 


Contractor must be capable of being a Primary Permittee during the project per Clean Water Act (CWA) section 404 permits and Georgia Soil and Water Conversation.  Onsite Superintendent must be Georgia Soil and Water Conversation Commission (GSWCC) certified.



NAICS 237110, Water and Sewer Line and Related Structures Construction.
Small Business Size $36.5M
Magnitude $250K - $500K


Solicitation will be - Invitation for Bid (IFB)


Contract will be Firm-Fixed-Price


NOTE: All contractors must be registered in the System for Award Management (SAM) program in order to receive a contract award from any DOD activity. Contractors may access the Internet site at: https://www.sam.gov to register and/or obtain information about the SAM program.


 


NOTE: IAW FAR 52.236-1, Performance of Work by the Contractor, the contractor shall be required to perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract.


 The solicitation will be available on or about 20 August 2014 on the Federal Business Opportunities web page at http://www.fbo.gov. Paper copies will not be available. The anticipated bid closing date/time is 20 September 2014 @ 01:00 p.m. Eastern Standard Time.  Bid opening is anticipated to occur thirty (30) minutes after bid closing time at the 94th Contracting Squadron, Bldg 812, 1538 Atlantic Ave., Dobbins ARB 30069


 Once the solicitation is posted, it is incumbent upon the interested parties to visit this website frequently for any updates and/or amendments to all documents. Primary point of contact (POC): Ken Jacob, Contracting Officer, Phone (678) 655-5745, FAX (678) 655-5612, e-mail: kenneth.jacob.1@us.af.mil. Alternate POC: Mr. Thomas Milloy, Contracting Officer, Phone (678) 655-5783, e-mail: thomas.milloy@us.af.mil. Send all correspondence to: 94th Contracting Squadron, Attn: Ken Jacob, 1538 Atlantic Ave., Dobbins ARB 30069

Files

File Type Posted
Bid_Schedule.pdf PDF
FA6703-14-B-0003-0003.pdf PDF
Soils_Sediment_Testing.pdf PDF
FA6703-14-B-0003-0002.pdf PDF
Soils_Sediment_Testing.pdf PDF
FA6703-14-B-0003-0002.pdf PDF
Questions_ _answers.pdf PDF
Disposal_Facilities.pdf PDF
Inert_Facilities.pdf PDF
FA6703-14-B-0003-0001.pdf PDF
7._Wage_Determination.pdf PDF
5._GA_Erosion_and_Sedimentation_Control_Education_Program.pdf PDF
8._Financial_Worksheet.pdf PDF
3._Executive_SummaryRev01.pdf PDF
1._Drawings.pdf PDF
FA6703-14-B-0003.pdf PDF
4._Corrected_Final_Civil_Narrative.pdf PDF
9._Limitations_on_Subcontracting.pdf PDF
2._Specifications.pdf PDF
10._DARB4.pdf PDF
6._GA_EPD_NOI_StormWater_Primary_Permitee_Y2008.pdf PDF
Show all 21

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity