FA6703-14-B-0003
Repair Storm Water Drainage, Basewide
FGWB 10-0030
Questions & Answers
9 Sep 2014
Q1. Specification section 01 11 00-1.8, indicates “Scan the construction site with Ground Penetrating Radar and electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered.” Please clarify the requirements since we cannot determine what utilities are expected in the area.
Known utilities are shown on the plans. Exact depths are unknown.
Q2. What record documents/as built surveys are required?
Per Section 01 78 00
Q3. Sheet 30 of 31, Plate No C-127 refers to designated waste or spoil areas to be provided by the Government. Please provide location of the waste site(s) for this project.
See attached spreadsheet
Q4. Re: Sheet 9 of 31, Plate C-106; Does the area need to be dewatered prior to installation of the geotextile and rip rap? The outlet pipe area appears to be constantly wet. Please also clarify what the clearing and grubbing requirements for this area.
Dewatering is a ‘means and method’ way to complete the requirement of this area. If the contractor proposes to dewater this area (or any other areas) then a dewatering plan will be required per the specifications.
Clearing and Grubbing as shown on plans within the limits of disturbance.