Bid_Schedule.pdf
PDF 21 KB Posted
- Attached to
- Repair Storm Water System, Basewide
- Solicitation number
- FA6703-14-B-0003
About this file
Bid Schedule Use the attached document as Schedule B.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Repair Storm Water System Site A
FFP
FGWB 10-0030, Repair Storm Water System Basewide: Site A consists of the elimination of drainage and erosions issues on both sides of Gym Road on Dobbins ARB in accordance with attached Specifications, 14 Aug 2014, and drawings date 13 Dec 2013. Work under this project will require a NPDES permit. Governement has submitted Notice of Intent. Contractor shall submit Notice of termination at the end of the project completion..FOB: Destination
PURCHASE REQUEST NUMBER: F5B3234213A001
NET AMT
0002 1 Lot Repair Storm Water System Site B
FFP
FGWB 10-0030, Repair Storm Water System Basewide: Site B consists of the repair of an existing drainage feature to prevent drainage flow from entering Little Lake on Dobbins ARB in accordance with attached Specifications, 14 Aug 2014, and drawings date 13 Dec 2013. Work under this project will require a NPDES permit. Governement has submitted Notice of Intent. Contractor shall submit Notice of termination at the end of the project completion.
FOB: Destination
SIGNAL CODE: A
BID SCHEDULE
0003 1 Lot Repair Storm Water System Site C
FFP
FGWB 10-0030, Repair Storm Water System Basewide: Site C consists of the repair to the drainage channel alongside Spill Pone 3 on Dobbins ARB in accordance with attached Specifications, 14 Aug 2014, and drawings date 13 Dec 2013. Work under this project will require a NPDES permit. Governement has submitted Notice of Intent. Contractor shall submit Notice of termination at the end of the project completion.
FOB: Destination
0004 1 Lot Repair Storm Water System Site D
FFP
FGWB 10-0030, Repair Storm Water System Basewide: Site D consists of the constructing measure to prevent sediment from being discharge into a downstream wetland from the USAF Civil Engineering Training Site on Dobbins ARB in accordance with attached Specifications, 14 Aug 2014, and drawings date 13 Dec 2013. Work under this project will require a NPDES permit. Governement has submitted Notice of Intent. Contractor shall submit Notice of termination at the end of the project completion.
FOB: Destination
File details come from the government source that posted it. Updated .