Soils_Sediment_Testing.pdf

PDF 11 KB Posted

Attached to
Repair Storm Water System, Basewide
Solicitation number
FA6703-14-B-0003
Issued by

About this file

Attahcment 11 Soils/Sediment Testing Requirement

View the file

Other files

File Type Posted
Bid_Schedule.pdf PDF
FA6703-14-B-0003-0003.pdf PDF
Soils_Sediment_Testing.pdf PDF
FA6703-14-B-0003-0002.pdf PDF
FA6703-14-B-0003-0002.pdf PDF
Questions_ _answers.pdf PDF
Disposal_Facilities.pdf PDF
Inert_Facilities.pdf PDF
FA6703-14-B-0003-0001.pdf PDF
7._Wage_Determination.pdf PDF
5._GA_Erosion_and_Sedimentation_Control_Education_Program.pdf PDF
8._Financial_Worksheet.pdf PDF
3._Executive_SummaryRev01.pdf PDF
1._Drawings.pdf PDF
FA6703-14-B-0003.pdf PDF
4._Corrected_Final_Civil_Narrative.pdf PDF
9._Limitations_on_Subcontracting.pdf PDF
2._Specifications.pdf PDF
10._DARB4.pdf PDF
6._GA_EPD_NOI_StormWater_Primary_Permitee_Y2008.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Soils/Sediments Testing Requirement

The soils/sediments to be removed from the stream adjacent to Spill Pond 3 shall be tested prior to excavation and disposal off-base. See below:

1. The soils/sediments are sampled prior to excavation for Polychlorinated Biphenyls (PCBs), metals and Chlorinated Pesticides (DDT, etc.).

2. A total of four (4) samples, equal distance apart along the excavation area, be collected.

3. Each sample should be collect using a clean, decontaminated soil auger and should include the soil layer from 0”-6” deep.

4. Analysis of the samples should be completed and returned to DARB-CEV for review prior to start of excavation.

11 September 2014

File details come from the government source that posted it. Updated .