IDIQ for mutli-year aton structures replacement for columbia & snake river system

Award Notice Posted

Solicitation number
HSCG88-16-B-PQQ039
Agency
Awarded
to Bergerson Construction Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
HSCG88-16-D-PQQ039 Federal IDV award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

This soliciation is set aside for small businesses.

Update #2 ·

Title: INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT FOR MUTLI-YEAR ATON STRUCTURES REPLACEMENT FOR COLUMBIA & SNAKE RIVER SYSTEM

**CORRECTION TO ASSIGNED DESIGNATED CONTRACTING OFFICE ADDRESS UNDER THIS SOLICITATION NOTICE:  1301 Clay Street 7th Floor Suite 700N, Oakland, CA 94612-5203.

Description: The purpose of this contract solicitation is to award a Indefinite Delivery, Indefinite Quantity Contract for Aid-To-Navigation (ATON) Structure Replacement for the following geographic Areas:


A. Geographic Area Number I: All ATON structures located in the Snake River from the Lower Monumental Dam to Lewiston, ID.


B. Geographic Area Number II: All ATON structures located in the Columbia River from the McNary Dam to Richland, WA and in the Snake River up to the Lower Monumental Dam.


C. Geographic Area Number III: All ATON structures located in the Columbia River from the John Day Dam to the McNary Dam.


D. Geographic Area Number IV: All ATON structures located in the Columbia River from the Bonneville Dam to the John Day Dam.


E. Geographic Area Number V: All ATON structures located in the Columbia River from the Lewis and Clark Bridge to the Bonneville Dam and in the Willamette River up to, and including, the Multnomah Channel and Wilsonville, OR.


F. Geographic Area Number VI: All ATON structures located in the Columbia River from Lewis and Clark Bridge to the Pacific Ocean including ATON structures within a 10-nautical mile radius west of the western most point of the northern entrance jetty.


Work includes:
(1) Standard ATON Maintenance work which includes removals, replacements, and repairs of damaged ATON structures;
(2) ATON parts fabrication.
(3) Emergency ATON Maintenance work which includes emergency removal of damaged ATON structures that present a hazard to navigation;
(4) Geodetic surveys conducted by a Professional Land Surveyor;
(5) Diving to reclaim knock-down structures and retrieve any lost batteries. Diving may also be performed to survey the underwater condition of ATON structures; and
(6) Environmental monitoring services as may be required for pile driving activities.


The maintenance work for this contract will be executed through task orders provided to the contractor by the Contracting Officer. The task orders will provide scopes of work for each individual ATON structure that requires maintenance. Task Orders will range from $3,000 to $1 million. The Government contemplates awarding a contract for a base year with four option years.


 

Update #1 ·

Title: INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT FOR MUTLI-YEAR ATON STRUCTURES REPLACEMENT FOR COLUMBIA & SNAKE RIVER SYSTEM

Description: The purpose of this contract solicitation is to award a Indefinite Delivery, Indefinite Quantity Contract for Aid-To-Navigation (ATON) Structure Replacement for the following geographic Areas:


A. Geographic Area Number I: All ATON structures located in the Snake River from the Lower Monumental Dam to Lewiston, ID.


B. Geographic Area Number II: All ATON structures located in the Columbia River from the McNary Dam to Richland, WA and in the Snake River up to the Lower Monumental Dam.


C. Geographic Area Number III: All ATON structures located in the Columbia River from the John Day Dam to the McNary Dam.


D. Geographic Area Number IV: All ATON structures located in the Columbia River from the Bonneville Dam to the John Day Dam.


E. Geographic Area Number V: All ATON structures located in the Columbia River from the Lewis and Clark Bridge to the Bonneville Dam and in the Willamette River up to, and including, the Multnomah Channel and Wilsonville, OR.


F. Geographic Area Number VI: All ATON structures located in the Columbia River from Lewis and Clark Bridge to the Pacific Ocean including ATON structures within a 10-nautical mile radius west of the western most point of the northern entrance jetty.


Work includes:
(1) Standard ATON Maintenance work which includes removals, replacements, and repairs of damaged ATON structures;
(2) ATON parts fabrication.
(3) Emergency ATON Maintenance work which includes emergency removal of damaged ATON structures that present a hazard to navigation;
(4) Geodetic surveys conducted by a Professional Land Surveyor;
(5) Diving to reclaim knock-down structures and retrieve any lost batteries. Diving may also be performed to survey the underwater condition of ATON structures; and
(6) Environmental monitoring services as may be required for pile driving activities.


The maintenance work for this contract will be executed through task orders provided to the contractor by the Contracting Officer. The task orders will provide scopes of work for each individual ATON structure that requires maintenance. Task Orders will range from $3,000 to $1 million. The Government contemplates awarding a contract for a base year with four option years.


 

Files

File Type Posted
PQQ039_SF1442-14a_Amendment_0006.pdf PDF
PQQ039_Amendment_0006.pdf PDF
PQQ039_Amendment_0005.pdf PDF
PQQ039_Amendment_0004.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Amdt4.pdf PDF
PQQ039_Amendment_0003.pdf PDF
Appendix_A.pdf PDF
Appendix_B.pdf PDF
PQQ039_Amendment_0002.pdf PDF
Appendix_A.pdf PDF
Appendix_B.pdf PDF
PQQ039_Amendment_0001.pdf PDF
OR59_Multnomah_OR.pdf PDF
WA92_Cowlitz_WA.pdf PDF
PQQ039_Contractor_Request_for_Clarification.pdf PDF
WA99_Skamania_WA.pdf PDF
ID70_Nez_Perce_ID.pdf PDF
WA84_Wahkiakum_WA.pdf PDF
WA89_Benton_WA.pdf PDF
ATON-STD_15_sheet_1_of_1_Subcable.tif TIF image
WA91_Clark_WA.pdf PDF
PQQ039_Forecast.pdf PDF
OR77_Umatilla_OR.pdf PDF
PQQ039_SF1442.pdf PDF
PQQ039_Contractor_Responsibility_Q.pdf PDF
PQQ039_Historical.pdf PDF
ATON_Standard_Drawings1.zip ZIP file
OR79_Wasco_OR.pdf PDF
WA75_Klickitat_WA.pdf PDF
OR80_Sherman_OR.pdf PDF
OR63_Clatsop_OR.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Final.pdf PDF
HSCG88-16-B-PQQ039_IFB_Solicitation.pdf PDF
WA94_Franklin_WA.pdf PDF
WA80_Pacific_WA.pdf PDF
WA85_Walla_Walla_WA.pdf PDF
ATON_Standard_Drawings.zip ZIP file
OR54_Columbia_OR.pdf PDF
OR68_Hood_River_OR.pdf PDF
Show all 39

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity