APPENDIX A:
WASHINGTON AND OREGON IN-WATER WORK WINDOWS
OREGON GUIDELINES
FOR
TIMING OF IN-WATER WORK
TO PROTECT FISH AND WILDLIFE RESOURCES
June, 2008
Purpose of Guidelines - The Oregon Department of Fish and Wildlife, (ODFW), under its authority to manage Oregon’s fish and wildlife resources has updated the following guidelines for timing of in-water work. The guidelines are to assist the public in minimizing potential impacts to important fish, wildlife and habitat resources.
“The guidelines are to assist the public in minimizing potential impacts...”.
Developing the Guidelines - The guidelines are based on ODFW district fish biologists’ recommendations. Primary considerations were given to important fish species including anadromous and other game fish and threatened, endangered, or sensitive species (coded list of species included in the guidelines). Time periods were established to avoid the vulnerable life stages of these fish including migration, spawning and rearing. The preferred work period applies to the listed streams, unlisted upstream tributaries, and associated reservoirs and lakes.
“The guidelines are based on ODFW district fish biologists’ recommendations”.
Using the Guidelines - These guidelines provide the public a way of planning in-water work during periods of time that would have the least impact on important fish, wildlife, and habitat resources. ODFW will use the guidelines as a basis for commenting on planning and regulatory processes. There are some circumstances where it may be appropriate to perform in-water work outside of the preferred work period indicated in the guidelines. ODFW, on a project by project basis, may consider variations in climate, location, and category of work that would allow more specific in-water work timing recommendations. These more specific timing recommendations will be made by the appropriate ODFW district office through the established planning and regulatory processes.
“These guidelines provide the public a way of planning in-water work during periods of time that would have the least impact on important fish, wildlife and habitat resources”.
Modification of Guidelines - There may be limited situations where minor modification of the timing guidelines is warranted. ODFW may consider new information, the need for greater detail, or other factors that would generally improve the quality and usefulness of these guidelines. ODFW through the appropriate district office may modify or clarify timing guidelines within the district as needed. Statewide updates to guidelines will occur on a periodic basis.
“ODFW through the appropriate district office may modify or clarify timing guidelines within the district as needed”.
Public Comments - A limited technical public review of these updated guidelines was conducted. A few responses provided specific biological information and recommendations for changing in-water work periods. Applicable ODFW districts reevaluated their timing recommendations based on this public response. Other comments concerned format and application of the timing guidelines. Some responses stated that different types of in-water activities should have different timing guidelines.
ODFW recognizes there will be occasions that more specific timing guidelines may need to be established for specific activities. The established planning and regulatory processes can accommodate that need.
“A limited technical public review of these updated guidelines was conducted”.
Northwest Region North Coast Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless otherwise indicated.
Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife Resources – June, 2008
Columbia River Management (971) 673-6000 Columbia River Estuary (Mouth to Tongue Pt.) November 1 – February 28
(MAR,SHL,CHF,CHS,SS,CO,STW,STS,CT*)
Columbia River (Tongue Pt. to Bonneville Dam) November 1 – February 28
(CHF,CHS,SS,CO,STW,CS,CHR,CT,STS*)
Northwest Region
North Coast Watershed District
Tillamook Office - (503) 842-2741 Pacific
Columbia River (See Columbia River Management) Youngs River July 15 - September 30 (CO,STW *) Young’s Bay Tributaries July 1 – September 15 (CO,CT,STW) Wallooskee River June 1 - September 30 (CO,CT*) Other Columbia R. Est. Tribs. (Mouth to Tongue Pt.) July 1 - September 15 (CHF,STW*) Other Columbia R. Est. Tribs (Tongue Pt. to Hunt Creek) July 15 - September 15 ( CHF, STW*)
Necanicum Necanicum River & tributaries July 1 - September 15 (CO,CHF,STW*) Necanicum and Neawanna Estuary November 1-February 15
(MAR,SHL,CO,CHF,STW)
Ecola Creek and Tributaries July 1-September 15 (CO,CT,STW) Nehalem
Nehalem Estuary November 1 - February 15
(MAR,SHL,CHS,CHF,CO,STW,*)
Lower Nehalem River (below Hwy 26 at Elsie) July 1 - September 15 (CHF*) N. Fk. Nehalem River July 1 - September 15 (CHF,STW*) Cook Creek July 1 - September 15 (CHF,STW*) Salmonberry River August 15 - September 15 (CHS,STW*) Other Lower Nehalem River Tributaries July 1 - September 15 (CHF,CO,STW*)
Upper Nehalem River and Tribs. (above Hwy 26 at Elsie) July 1 - August 31 (CHS,STW*)
Tillamook Tillamook Estuary November 1 - February 15
(MAR,SHL,CHF,CHS,STW,CO,CS*)
Miami,Kilchis,Wilson,Trask,Tillamook Rivers & Tribs. July 1 - September 15
(CHF,CHS,STW,CO,CS*)
Other Tillamook Bay Tributaries July 1 – September 15 (CO,CT)
Netarts Bay November 1 - February 15
(MAR,SHL,CHF,STW,CO,CS*)
Sand Lake November 1 - February 15
(MAR,SHL,CHF,STW,CO,CS*)
Nestucca Nestucca Estuary November 1 - February 15
(MAR,SHL,CHF,CHS,STW,CO,CS*)
Northwest Region North Coast Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless otherwise indicated.
Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife Resources - June, 2008
Nestucca River & Tributaries July 1 - September 15
(CO,CHS,CHF,CS,STW*)
Little Nestucca River & Tributaries July 1 – September 15 (CO,CHS,CHF,CS,STW) Neskowin Creek and Tributaries July 1 - September 15 (CO,CS,STW*) Other North Coastal Tributaries (Columbia River to Neskowin Cr.) July 1 – September 15 (CO,CT) Coastal Lakes October 1 – February 15 (CT)
Coastal lake Tributaries July 1 – September 15 (CT)
Newport Office - (541)-867-4741 Pacific
Salmon Salmon River Estuary November 1 - February 15 (MAR,SHL*) Salmon River July 1 - September 15 (CHF,CO,CS,STW,CT*)
Siletz Siletz River Estuary November 1 - February 15 (MAR,SHL*) Siletz River July 1 - August 31(CHF,CHS,CO,CS,STW,STS,CT*)
Yaquina Yaquina River Estuary November 1 - February 15 (MAR,SHL*) Yaquina River July 1 - September 15 (CHF,CO,STW,CT*)
Alsea Alsea River Estuary November 1 - February 15 (MAR,SHL*) Alsea River July 1 - August 31 (CHF,CHS,CO,STW,CT*)
Yachats River July 1 - September 15 (CHF,CO,STW,CT*) Siuslaw
Siuslaw River Estuary November 1 - February 15
(MAR,SHL,CHF,CO,STW,CT*)
Siuslaw River July 1 - September 15 ( CHF,CO,STW,CT*) Other Coastal Tributaries July 1 - September 15 (CO,STW,CT*) Coastal Lakes October 1 – February 15 (STW,CO,CT) Coastal Lake Tributaries July 1 – September 15 (STW,CO,CT)
North Willamette Watershed District
Clackamas Office (971) 673-6000 Columbia
Columbia River ( Hunt Creek to Bonneville Dam) See Columbia River Management Columbia River ( Within District above Bonneville Dam) November 15 - March 15
(CHF,CHS,CHR,SS,CO,CS,STW,STS,CT*)
Columbia R. Tribs. (Hunt Creek to St. Helens) July 15 - September 15 (CHF,STW*) Clatskanie River July 15 - September 15 (CHF,STW*) tatem Line tatem Line
Northwest Region North Willamette Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
2 Winter window only for activities below -20’Columbia River Datum 3 Winter window only for activities below -20’ National Geodetic Vertical Datum 1947
Willamette Multnomah Channel (including Scappoose Bay) July 1 - October 31 & December 1 - January 312
(CHF,CHS,CO,STW,STS,CT,WW *)
Milton Cr. & Scappoose Cr. July 15 - August 31 (CO,STW,JUV,WW*)
Willamette River (mouth to Willamette Falls) July 1 - October 31 & December 1 - January 313
(CHF ,CHS,CO,STW,STS,CT,WW *)
Columbia Slough June 15 - September 15 (JUV,WW)
Johnson Johnson Creek July 15 - August 31 (STW,CO,CT,CHF*)
Johnson Cr. Tribs. July 15 - August 31 (CT,STW,CHF,CO*) Kellogg Creek July 15 - September 30 (STW,CO,CT*) Tryon Creek July 15 - September 30 (STW,CO,CT*) Clackamas River July 15 - August 31
(CHF,CHS,STW,CO,STS,CT*)
Abernethy Creek July 15 - September 30 (CO,STW,CT*) Other Willamette River tribs. July 15 – September 30 (CT*)
Willamette River (Will. Falls to Newberg ) June 1 - October 31 & December 1 - January 31
(CHS,STW*)
Tualatin All Tualatin River Tributaries July 15 - September 30 (CO,STW,CT,WW*) Tualatin River (below Scoggins Cr.) June 1 - September 30 (CO,STW,CT,WW*) Tualatin River (above Scoggins Cr.) July 15 - September 30 (CO,STW,CT,WW*)
Beaver Creek July 15 - September 30 (CT*) Molalla/Pudding River
Molalla River (below Hwy 213) June 1 – September 30 (STW,CT*) Other Molalla River Tributaries (below Hwy 213) July 15 - September 30 (CT*)
Molalla River (above Hwy 213) July 15 - August 31 (CHS,STW,CT,RB*) N. Fk & M. Fk Molalla July 15 - August 31 (CHS,STW,CT,RB*)
Other Molalla River Tributaries (above Hwy 213) July 15 - September 30 (STW,CT*) Pudding River June 1 - September 15 (CHS,STW,CT*)
Butte Creek July 15 - September 30 (STW,CT*) Abiqua Creek July 15 - August 31 (CHS,STW,CT,RB*) Silver Creek July 15 - September 30 (STW,CT*) Other Pudding River Tributaries June 1 - September 30,STW,CT,RB*)
Other Willamette River tribs. July 15 – October 15 (CT*) Willamette River (Newberg to Yamhill River) June 1 – September 30 (CHS,STW,CT,RB*)
Chehalem Creek July 15 - September 30 (CT*) Yamhill River July 15 - September 30 (STW,CT*) Other Willamette River tribs. July 15 – September 30 (CT*)
Fairview Cr.,Arata Cr., Salmon Cr. June 15 - September 15 (CT,WW*) Sandy River July 15 - August 31 (CHS,CHF,CO,STW*) Tanner Creek July 15 - August 15 (CHF,CHS,CO,STW*) Columbia River Tributaries (St. Helens to Sandy River) July 15 - August 31 (CHF,CO,STW,CT *) Columbia River Tributaries (Sandy River to Herman Cr.) July 15 - August 31 (CO,STW,STS,CT *)
Northwest Region South Willamette Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
South Willamette Watershed District
Corvallis Office - (541) 757-4186 Willamette Willamette River (Yamhill River to McKenzie River) June 1 – October 15 (CHS,STW,CT,RB*) Spring Valley Creek July 1 - October 15 (CT*) Glenn Creek July 1 - October 15 (CT*) Mill Creek June 1 – October 15 (CT,RB*) Rickreall Creek July 1 – October 15 (STW,CT*) Luckiamute River July 1 - October 15 (STW,CT*) Santiam River June 1 – October 15 (CT*) North Santiam River (below Big Cliff Dam) July 15 - August 31 (CHS,STW,CT,RB*) Stout Cr., Rock Cr., & Mad Cr. July 15 - October 15 (STW,CT,RB*) Lt. N. Fk. Santiam River July 15 - August 31 (CHS,STW,CT,RB*) Sinker, Elkhorn Cedar Creeks & tributaries July 15 - October 15 (STW,CT,RB*) Other Tributaries June 1 - October 15 (CT*) Other Santiam River Tributaries (below Big Cliff Dam) June 1 - October 15 (CT*) North Santiam River (above Detroit Dam) June 1 - August 31 (CHS, K,CT,RB*) Breitenbush River June 1 - August 31 (CHS, K,CT,RB*) South Santiam River (below Foster Dam) July 15 - August 31 (CHS,STW,CT,RB*) Crabtree Cr.,Thomas Cr. & Wiley Cr. July 15 - August 31 (CHS,STW,CT,RB*) McDowell Cr. July 15 - October 15 (STW,CT*) Other South Santiam River Tributaries (below Foster Dam) June 1 - October 15 ( CT*) South Santiam River (above Foster Dam) July 15 - August 31 (CHS,STW,CT,RB*) Middle Santiam River & Quartzville Creek June 1 - October 15*(K,CT,RB*) Marys River July 1 - October 15 (CT*) Long Tom River July 1 - October 15( CT*) Other West Bank Will. R. Tribs. (Will. Falls to McKenzie R.) July 1 - October 15 (CT*) Calapooia Calapooia River (below Holley) June 1 - October 15 (CT*) Calapooia River (above Holley) July 15 - August 31 (CHS,STW,CT,RB*) Other East Bank Will. R. Tribs. (Will. Falls to Harrisburg) June 1 - October 15 (CT*)
Springfield Office - (541) 726-3515
Willamette Willamette River (above McKenzie River) June 1 - October 31(CHS,RB*) McKenzie River Basin McKenzie River (below Leaburg Dam) by specific arrangement (CHS,CT,RB,BUT,OC*)
Tributaries of McKenzie River (below Leaburg Dam) June 1 - October 31 (CT,RB, OC*) McKenzie River (above Leaburg Dam) July 1 - August 15 (CHS,BUT,CT,RB*) Blue River (above Blue River Dam) June 1 - October 31 (CT,RB*) Middle Fork Willamette River Basin Middle Fork Willamette River (Confluence with the Coast Fork Willamette to Dexter Dam) by specific arrangement (CHS,STW,CT,RB,OC*)
Fall Creek & Little Fall Creek July 1 - August 31 (CHS,STW,CT,RB*) Lost Creek July 1 - August 31 (CHS,STW,CT,RB*)
Rattlesnake Creek by specific arrangement (STW,CT,RB,OC*)
Northwest Region South Willamette Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
Other Middle Fork Willamette River tributaries June 1 – October 31 (CT,RB*) (Confluence with the Coast Fork Willamette to Dexter Dam)
Middle Fork Willamette River Basin (Dexter Dam to Hills Creek Dam) by specific arrangement (CHS,CT,RB,OC*) North Fork Middle Fork Willamette River July 1 – August 31 (CHS, CT,RB*) Salmon Creek July 1 – August 31 (CHS, CT,RB*) Salt Creek July 1 – August 31 (CHS, CT,RB, OC*) Middle Fork Willamette River (above Hills Creek Dam) July 1 - August 15 (CHS,BUT,CT,RB*) Coast Fork Willamette River Basin Coast Fork Willamette River by specific arrangement (CHS,RB,OC*) (Confluence with the Middle Fork Willamette to Cottage Grove Dam) Coast Fork Willamette River (above Cottage Grove Dam) May 15 – November 30 (CT*) Row River (below Dorena Dam) June 1 - October 31(CHS,CT,RB*) Row River (above Dorena Dam) May 15 – November 30 (CT*)
Southwest Region
Umpqua Watershed District
Roseburg Office - (541) 440-3353 Pacific Umpqua River
Umpqua River Estuary & Smith Est. November 1 –January 31
(MAR,SHL,CHS,CHF,CO,STW,STS,,CT*)
Umpqua River (Scottsburg and above) July 1 - August 31(CHS,CHF,CO,STW,STS,CT*) Umpqua River Tribs. July 1 - September 15 (CHF,CO,STW,CT*) North Umpqua North Umpqua River (below Soda Springs Dam) by specific arrangement
(CHF,CHS,CO,STW,STS,CT*)
Tribs. North Umpqua (below Soda Springs) July 1 - September 15 (CHS,CO,STW,STS,CT*) North Umpqua River (above Soda Springs Dam) June 15 - October 15 (RB,BT,BR*) South Umpqua South Umpqua River July 1 - August 31(CHF,CHS,CO,STW,CT*) South Umpqua Tribs. July 1 - September 15 ( CHF,CO,STW,CT*)
Charleston Office - (541) 888-5515
Pacific Coos Coos Bay Estuary and River (to Millicoma R./S. Coos R. confluence) October 1 - February 15
(MAR,SHL,JUV,CHF,CO,STW,CT *)
Millicoma River, S. Coos R. and tribs. July 1 – September 15 (CHF,CO,STW,CT,MD*) Coquille Coquille River Estuary (Mouth to Bear Creek) October 1 – February15
(MAR,SHL,JUV,CHF,CO,STW,CT *)
Coquille River and tribs. (Bear Creek and above) July 1 - September 15 (CHF,CO,STW,CT*) Other Coastal Tributaries July 1- September 15 (CHF,CO,STW,CT*) Coastal Lakes July 1 – September 15 (CO,STW,CT*) Coastal Lake Tributaries July 1 - September 15 (CO,STW,CT*)
Southwest Region Rogue Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
Rogue Watershed District
Gold Beach Field Office – (541) 247-7605
Pacific
New New River October 1- May 31 (JUV CHF*) New River Tributaries July 15 - September 30 (CO,STW,CT*) Floras Creek Estuary October 1- May 31 (JUV CHF*) Floras Creek (above Hwy 101 bridge) July 15 - September 30 (CHF,CO,STW,CT*) Sixes Sixes River Estuary October 1- May 31 (JUV CHF*) Sixes River (above Hwy 101 bridge) July 15 - September 30 (CHF,CO,STW,CT*) Elk Elk River Estuary October 1- May 31 (JUV CHF*) Elk River (above Hwy 101 bridge) July 15 - September 30 (CHF,CO,STW,CT*) Euchre/Coastal Tributaries Euchre Creek Estuary November 1 - May 31 (JUV CHF*) Euchre Creek (above County bridge) July 15 - September 30 (CHF,CO,STW,CT*) Hubbard Cr., Brush Cr. July 15 - September 30 (CO,STW,CT*) Mussel Cr. July 15 - October 31 (STW,CT*) Rogue Rogue River Estuary October 1 - May 31 (JUV CHF*) Rogue River (Elephant Rock to Marial) May 1 - September 30 (CHF*) Rogue River Tributaries (below Marial) July 15 - September 30 (CHF,CO,STW,CT*) Hunter Hunter Creek Estuary November 1 - May 31 (JUV CHF*)
Hunter Creek (above County bridge) July 15 - September 30 (CHF,CO,STW,CT*) Pistol Pistol River Estuary November 1 - May 31 (JUV CHF*) Pistol River (above County bridge) July 15 - September 30 (CHF,CO,STW,CT*)
Chetco/Coastal Tributaries Chetco River Estuary Oc tober 1 - May 31 (JUV CHF*) Chetco River (above Tide Rock) July 15 - September 30 (CHF,CO,STW,CT*)
Meyers Cr., Thomas Cr., Whalehead Cr. July 15 - October 31 (STW,CT*) Winchuck Winchuck River Estuary October 1 - May 31 (JUV CHF*) Winchuck River (above South Fork) July 15 - September 30 (CHF,CO,STW,CT*) Other Coastal Tributaries July 15 - October 31 (CT*)
Central Point Office (541) 826-8774 Rogue Rogue River ( Marial to William Jess Dam) June 15 - August 31 (CHS,STW*) Illinois River June 15 - September 15 (CHF,STW*) Applegate River July 1 - September 15 (CHF,STW*) Other Rogue River Tributaries (above Marial). June 15 - September 15 (CHS,STW*) Rogue River (above William Jess Dam) June 15 - September 15 (BT,CT*)
High Desert Region Deschutes Watershed District
WATERWAY PREFERRED WORK PERIOD
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
High Desert Region
Deschutes Watershed District
The Dalles Office - (541) 296-4628 Columbia Columbia River (Within District Bonneville to John Day Dam) November 15 - March 15
(CHF,CHS,SS,CO,STW,STS*)
Columbia River Tributaries July 15 - September 30 (STW,CO,RB*)
Fifteenmile Creek July 15 - October 31 (STW,RB*) Hood River
Hood River July 15 - August 31 (CHF,CHS,CO,STS,STW*) East Fork Hood River & Tribs. July 15 – August 31 (CHF,CO,STS,STW*) Middle Fork Hood River & Tribs. July 15 – August 15 (STW,CHS,BUT*) West Fork Hood River & Tribs. July 15 – August 15 (CHS,STS,STW*)
Deschutes Deschutes River (below Pelton Dam) February 1 - March 15 (CHF,STS,RB*)
White River July 1 - October 31 (RB*) Buckhollow Cr. July 1 - October 31 (STS,RB*) Bakeoven Cr. July 1 - October 31 (STS,RB*) Trout Cr. July 1 - October 31 (STS,RB*)
Bend Office - (541) 388-6363
Deschutes Metolius Metolius River by specific arrangement (K,RB,BR,BUT*)
Spring Creek by specific arrangement(K,RB*,BUT) Lake Creek by specific arrangement (K,RB)
Deschutes River (Pelton Dam through Lake Billy Chinook) July 1 - September 30 ( RB,BR*) Crooked River
Crooked River (below Prineville Dam) July 1 - October 31 (RT*) Prineville Reservoir Ju ly 1 - October 31 (RT*) Crooked River (above Prineville Dam) July 1 - October 31 (RT*) N.Fk. Crooked River (above Big Summit Prairie) July 1 - September 30 (RT*)
Deschutes River (Lake Billy Chinook to Bend) July 1 - September 30 (RB,BR,BUT,K*) Whycus Creek July 1 - October 15 (RB,BR,BUT*) Tumalo July 1 - October 15 (RB,BR*) Deschutes River (Bend-North Canal Dam to Benham Falls) July 1 - October 15 (RB,BR*) Deschutes River (Benham Falls to Wickiup Dam) July 1 - October 15 ( RB,BR*) Little Deschutes River July 1 - October 15 (RB,BR*) Fall River July 1 - October 15 (RB,BR*) Deschutes River(Wickiup Reservoir to Crane Prairie Dam) July 1 - August 31 (RB,BR,K *) Deschutes River (Crane Prairie Reservoir to Little Lava Lake) July 1 - August 31 (RB,BT,K*) Odell/Davis Lake and Tributaries by specific arrangement (K,RB,BUT*)
Klamath Watershed District Klamath Falls Office - (541) 883-5732 Klamath
Klamath River (below Keno) July 1 - September 30 ( RB*,SUSP,RB,RT) Cottonwood Creek July 1 – September 30 (STW*) Jenny Creek July 1 – January 31 (SCRT,JCS*)
Klamath River (above Keno) July 1 – January 31 (SNS,BCHUB,RT*) Lost River above Bonanza July 1 – January 31 (RT,SNS
Lost River below Bonanza July 1 - March 31 (RT*) Williamson River August 1 - September 30 (BT,BR,RT,SNS,LRS,KLS*) tatem Line tatem Line
High Desert Region Klamath Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
Klamath River (above Keno) July 1 – January 31 (SNS,BCHUB,RT*) Lost River above Bonanza July 1 – January 31 (RT,SNS*)
Lost River below Bonanza July 1 - March 31 (RT*) Williamson River August 1 - September 30
(BT,BR,RT,SNS,LRS,KLS*)
Sprague River August 1 - September 30
(BUT,LRS,SNS,RT,BT,BR *)
Sycan River August 1 - September 30
(RT,BT,BR,BUT,LRS,SNS*)
Wood River A ugust 1 - September 30 (RT,BR,BUT,SNS*) Sevenmile Creek August 1 - September 30 (RT,BR*) Klamath Lake and Agency Lake July 1 - January 31 (RT,LRS,SNS,BCHUB*) Silver Lake tributaries Jul y 15 - September 30 (RT,BT*) Summer Lake and tributaries July 15 - September 30 ( TCHUB,RT *) Chewaucan River Jul y 15 - September 30 (RT*) Goose Lake tributaries July 15 - September 30
(GRT,GLAM,SSUC,GCB,PRCH,PSCL,MSUC*)
Warner Valley tributaries Ju ly 15 - September 30 (WSUC,FD,RT*)
Malheur Watershed District
Hines Office - (541) 573-6582 Columbia Snake
Snake River (Malheur County) Open Malheur Malheur River (below Namorf Dam) Open Willow Cr. (below Malheur Res.) Open Willow Cr. (above Malheur Res.) October 1 - March 31 (RB,RT*) Cottonwood, Cr., Squaw Cr October 1 - March 31 (RB,RT*) vvvvOther Tributaries vvvivvvvvvOctober 1 - March 31 (RB,RT*)
Malheur River (Namorf Dam to Wolf Creek ) November 1 - March 31 (RT*) North Fork Malheur (mouth to Beulah Res.) November 1 - March 31 (RT,RB*) North Fork Malheur (above Beulah Res.) July 1 - August 31 (BUT,RT,BT*) South Fork Malheur October 1 - March 31 (RT*)
Malheur River (Including Wolf Creek and above) July 1 - August 31 (BUT,RT,BT*) Owyhee River
Owyhee River (below dam) November 1 - March 31 (RB,BT*) Owyhee River (above dam) October 1 - March 31 (RB,RT*)
Succor Creek October 1 - March 31 (RT*) Silvies River (above 5mi dam) October 1 - March 31 (RT,*) Silver Creek (above Hwy 45) October 1 - March 31 (RT*) Donner Blitzen River (Steen Mtns) October 1 - March 31 (RT*) vvvAlvord Basin vvvvOctober1-March31 (LCT,AC*) Catlow Valley tributaries October 1 - March 31 (LCT,CTC,RT*) Trout Creek Mountains streams October 1 - March 31 (LCT,AC,RB,CT*) vvvQuinn River vvOctober 1 - March 31 (LCT,RB,CT*)
Northeast Region John Day Watershed District
WATERWAY PREFERRED WORK PERIOD 1
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless otherwise indicated.
Northeast Region
John Day Watershed District John Day Office - (541) 575-1167 Columbia River Lower John Day John Day River (below John Day) July 15 - August 31 (STS,RT*) Rock Creek Rock Creek (Gilliam Co.) July 15 - September 30 (STS,RT*) North Fork John Day North Fork John Day River (below U.S. 395) July 15 - August 31 (STS,RT*) Middle Fork John Day Middle Fork John Day River (below US 395) July 15 - August 31 (STS,RT*) Middle Fork John Day River (above US 395) July 15 - August 15 (CHS,STS,RT,BUT*) North Fork John Day River (above U.S. 395) July 15 - August 15 (CHS,STS,BUT*) Upper John Day South Fork John Day River South Fork John Day River July 15 - August 31 (STS,RT*) John Day River (above John Day) July 15 - August 15 (CHS,STS,BUT,RT,CT*) Canyon Creek July 15 - August 31 (STS,RB,CT*)
Pendleton Office - (541) 276-2344 Columbia Columbia River (John Day Dam upstream) December 1 – March 31 (CHF,CHS,CO,STS*) Willow Creek July 1 - December 31 (RT, STS*) Umatilla Umatilla River (below Cayuse) July 15 - September 30 (CHF,CHS,CO,STS,RT, BUT*) Butter Creek July 1 - December 31 (RT*) Birch Creek July 1 - October 31 (STS,RT*) McKay Creek McKay Creek (below reservoir) December 1 - March 31 (CHF,CHS,CO,STS,RT,BUT*) McKay Creek (above reservoir) July 1 - December 31 (RT*) Wildhorse Creek July 1 - October 31 (CHF,CHS,CO,STS,RT*) Umatilla River (above Cayuse) July 1 - August 15 (CHS,CHF,STS,RT,CO,BUT,WF*) Meacham Creek
Meacham Creek (below north fork) July 1 - August 15 (CHS,STS,RT,BUT, WF*) zxxzMeacham Creek (above north fork) July 1 - October 31 (STS,RT,BUT,WF*) Cold Spring Creek June 1 - December 31 Walla Walla
Walla Walla River (below forks) July 1 - September 30 (CHS,STS,RT,BUT,WF*) Pine Creek July 1 - October 31 (STS,RT*) Little Walla Walla Distributary System Little Walla Walla (above Ferndale Rd) December 1 – March 31(STS,RT,BUT*)
Little Walla Walla (below Ferndale Rd) July 1 - October 31 (STS,RT,BUT*) tatem Line tatem Line
Northeast Region John Day Watershed District
1WATERWAY PREFERRED WORK PERIOD
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless
Mill Creek July 1 - August 15 (CHS,STS,RT,BUT,WF*) Cottonwood Creek July 1 - October 31 (STS,RT*) Birch Creek July 1 - October 31 (STS,RT*) Couse Creek July 1 - October 31 (STS,RT*)
South Fork Walla Walla River July 1 - August 15 (CHS,STS,RT,BUT,WF*) North Fork Walla Walla River
NF Walla Walla River (below Little Meadows Cyn) July 15 - September 30 (STS,RT,BUT,WF) NF Walla Walla River (above Little Meadows Cyn) July 1 - August 31 (STS,RT,BUT,WF)
Grande Ronde Watershed District
Enterprise Office - (541) 426-3279 Columbia Snake River (state line to Hells Canyon Dam) July 1 - October 15 (CHF,CHS,SS,STS*) Grande RondeGrande Ronde River (below Wallowa River) July 1 - September 15 (CHF,STS*)
Wenaha River Ju ly 1 - August 15 (CHS,STS,BUT*) Joseph Creek Jul y 1 - March 31 (STS*) Wallowa River Ju ly 15 - August 15 (CHS,STS,RB,BT,BUT *)
Imnaha River (above Big Sheep Creek) July 15 - August 15 (CHS,STS,BUT*) Imnaha River (below Big Sheep Creek) July 1 – October 15 (CHF,STS*)
La Grande Office - (541) 963-2138 Columbia Snake Grande Ronde Grande Ronde River (Wallowa River to Highway 244 Bridge) July 1 - October 15 (CHS,STS,RB,BUT*) Minam River July 1 – August 15 (CHS,STS,RB,BUT*) Lookingglass Creek July 1 - August 15 (CHS,STS,RB,BUT*) Catherine Creek Catherine Creek (to, and including Little Creek) July 1 - October 15 (CHS,STS,RB,BUT*) Catherine Creek (above Little Creek) July 1 – August 15 (CHS,STS,RB,BUT* Grande Ronde River (above highway 244 bridge) July 1 - July 31 (CHS,STS,RB,BUT*) Snake River Reservoir July 1 - November 30 (WW*) Snake River Reservoir Tributaries July 1 - October 31 (RB*) Burnt River July 1 - October 31 (RB,BT*) Pine Creek July 1 – August 31 (RB,BUT *)
Powder River (mouth to Phillips Reservoir) July 1 - October 31 (RB*) Anthony Creek July 1 – August 31 (RB,BUT*) North Powder R. (above Dutch Flat Cr.) July 1 – August 31 (RB,BUT*) Wolf Creek (above Wolf Creek Res.) July 1 – August 31 (RB,BUT*) Big Muddy Creek (above Foothill Rd.) July 1 – August 31 (RB,BUT*) Pine Creek (above North Fork Pine Cr.) July 1 – August 31 (RB,BUT*) Salmon Creek (above Pocahontas Road) July 1 – August 31 (RB,BUT*)
Powder River (above Phillips Reservoir) July 1 – August 31 (RB,BUT*) Deer Creek (above Phillips Reservoir) July 1 – August 31 (RB,BUT*)
1 Work period is established for named stream, all upstream tributaries, and associated lakes within the watershed unless otherwise indicated.
*Coded fish species defined below provide the primary basis for timing guidelines. The species list should be considered general information and is not necessarily comprehensive nor accurate.
AC - Alford chub BCHUB – blue chub BR - brown trout BT - brook trout BUT - bull trout CR – crappie CHF - Chinook salmon, fall CHR - Chinook salmon, summer CHS - Chinook salmon, spring CO - coho salmon CS - chum salmon CT - cutthroat trout (includes sea run) CTC - Catlow tui chub GCB - goose lake chub FD – Foskett speckled dace GLAM - Goose Lake lamprey GSUC - Goose Lake sucker JCRT – Jenny Creek red band trout JCS – Jenny Creek sucker JUV - juvenile salmonids K – kokanee KLS – Klamath largescale sucker
LCT - Lahontan cutthroat trout LRS – Lost River sucker MAR - various marine species of fish MD – Millicoma dace MMS - Malheur mottled sculpin MSUC – Modoc sucker OC – Oregon sucker PRCH - pit roach PSCL - pit sculpin RB - rainbow trout RT - red band trout SHL - various marine shell fish SNS shortnose sucker SS - sockeye salmon SSUC – Sacramento sucker STS - steelhead summer STW - steelhead winter SUSP – sucker species TCHUB – tui chub WF – mountain white fish WSUC – Warner sucker WW - various warm water game fish
2012 Nationwide (NWP) Regional Permit Conditions
Portland District
The following Nationwide Permit (NWP) regional conditions are for the Portland District Regulatory Branch boundary.
Regional conditions are placed on NWPs to ensure projects result in less than minimal adverse impacts to the aquatic environment and to address local resource concerns.
ALL NWPs –
1. High Value Aquatic Resources: Except for NWPs 3, 20, 27, 32, 38, and 48, any activity that would result in a loss of waters of the United States (U.S.) in a high value aquatic resource is not authorized by NWP.
High value aquatic resources in Oregon include bogs, fens, wetlands in dunal systems along the Oregon coast, native eel grass (Zostera marina) beds, kelp beds, rocky substrate in tidal waters, marine reserves, marine gardens, vernal pools, alkali wetlands, and Willamette Valley wet prairie wetlands.
NOTE: There are other types of wetlands in Oregon, such as mature wooded wetlands and tidal swamps, which are also considered as providing high value and functions to the State’s aquatic ecosystems. Impacts to these waters will be evaluated on a case-by-case basis for potential authorization under a Nationwide Permit. For more information about the State’s Wetlands of Conservation Concern” please visit http://oregonstatelands.us/DSL/PERMITS/forms.shtml#Permit_Forms
2. Cultural Resources and Human Burials-Inadvertent Discovery Plan: In addition to the requirements in
NWP General Conditions 20 and 21 permittee shall immediately notify the Portland District Engineer if at any time during the course of the work authorized, human burials, cultural items, or historic properties, as identified by the National Historic Preservation Act and Native American Graves and Repatriation Act, are discovered. The permittee shall implement the following procedures:
a. Immediately cease all ground disturbing activities.
b. Project Located in Oregon: Notify the Oregon State Historic Preservation Office (503-986-0674).
c. Project Located in Washington: Notify the Washington Department of Archaeology and Historic
Preservation (360-586-3077).
d. Notify the Portland District Engineer. Notification shall be made by fax (503-808-4375) as soon as possible following discovery but in no case later than 24 hours. The fax shall clearly specify the purpose is to report a cultural resource discovery. Follow up the fax notification by contacting the Portland District Engineer representative (by email and telephone) identified in the verification letter.
e. Failure to stop work immediately and until such time as the Portland District Engineer has coordinated with all appropriate agencies and Native American tribes, and complied with the provisions of 33 CFR 325 (Appendix C), the National Historic Preservation Act, Native American Graves and Repatriation Act, and other pertinent regulations could result in violation of state and federal laws. Violators are subject to civil and criminal penalties.
http://oregonstatelands.us/DSL/PERMITS/forms.shtml#Permit_Forms� ktarnow Typewritten Text ktarnow Typewritten Text
ATTACHMENT 4
3. In-water Work: In order to minimize potential impacts to water quality, aquatic species and habitat, in-water work will be limited by the following timing considerations:
a. Permittee shall complete all in-water work within the preferred work window specified in Oregon
Department of Fish and Wildlife’s (ODFW) “Oregon Guidelines for Timing of In-Water Work to Protect Fish and Wildlife Resources,” June 2008, or most current version, available at:
http://www.dfw.state.or.us/lands/inwater/Oregon_Guidelines_for_Timing_of_%20InWater_Work2008.pdf.
b. If work cannot be completed within the preferred timing window, despite every attempt to do so, permittee shall submit a request to work out side of the preferred window to the Portland District Engineer in writing. Permittee shall not begin any in-water work outside of the preferred window until they have received written approval from the District Engineer. The District Engineer will coordinate with the appropriate agencies prior to finalizing a decision.
4. Fish and Aquatic Life passage: In addition to the requirements of NWP General Conditions 2 and 9, all activities authorized by a NWP shall not restrict passage of aquatic life temporarily or permanently. Aquatic life shall be interpreted to include amphibians, reptiles, and mammals whose natural habitat includes waters of the United States and which are generally present in and/or around waters of the United States.
a. Activities such as the installation of culvert, intake structures, diversion structures, or other modifications to stream channel morphology must conform to fish passage standards developed by the ODFW and the National Marine Fisheries Service (NMFS). ODFW’s standards can be found at OAR 635- 412-0035; ODFW provides an overview at http://www.dfw.state.or.us/fish/passage/ and NMFS provides an overview at http://www.nwr.noaa.gov/Salmon-Hydropower/FERC/upload/Fish-Passage-Design.pdf.
5. Fish Screening: The permittee shall ensure that all intake pipes utilize fish screening that complies with standards developed by NMFS and ODFW (”Anadromous Salmonid Passage Facility Design”, February 2008). http://www.nwr.noaa.gov/Salmon-Hydropower/FERC/upload/Fish-Passage-Design.pdf or the most current version.
6. Work Area Isolation and Dewatering: Appropriate best management practices shall be implemented to prevent erosion and sediments from entering wetlands or waterways.
a. All in-water work shall be isolated from the active channel or conducted during low seasonal stream flows.
b. Permittee shall provide for fish passage upstream and downstream of the worksite.
c. Cofferdams shall be constructed of non-erosive material, such as concrete jersey barriers, sand and gravel bag dams, or water bladders. Constructing a cofferdam by pushing material from the streambed or sloughing material from the streambanks is not authorized.
d. Sand and gravel bag dams shall be lined with a plastic liner or geotextile fabric to reduce permeability and prevent sediments and/or construction materials from entering the active stream channel.
e. Upstream and downstream flows shall be maintained by routing flows around the construction site with a pump, bypass pipe, or diversion channel.
http://www.dfw.state.or.us/lands/inwater/Oregon_Guidelines_for_Timing_of_%20InWater_Work2008.pdf� http://www.dfw.state.or.us/fish/passage/� http://www.nwr.noaa.gov/Salmon-Hydropower/FERC/upload/Fish-Passage-Design.pdf� http://www.nwr.noaa.gov/Salmon-Hydropower/FERC/upload/Fish-Passage-Design.pdf� apunton Highlight
RELove Highlight
f. A sediment basin shall be used to settle sediments in return water prior to release back into the waterbody. Settled water shall be returned to the waterbody in such a manner as to avoid erosion of the streambank. Settlement basins shall be placed in uplands.
g. Fish and other aquatic species must be salvaged prior to dewatering. The State of Oregon requires a
Scientific Take Permit be obtained to salvage fish and wildlife. Permittee is advised to contact the nearest ODFW office. For further information contact ODFW at http://www.dfw.state.or.us.
7. Dredging: For any NWP-authorized activities, including but not limited to NWP 1, 3, 12, 13, 19, 27, 28, 35, 36, 40, and 41 that involve removal of sediment from waters of the United States permittee shall ensure that:
a. Prior to dredging, appropriate sediment characterization as to size composition and potential contaminants has been undertaken and the material is suitable for in-water disposal per the Sediment Evaluation Framework for the Pacific Northwest, 2009 (available at:
http://www.nwp.usace.army.mil/environment/sediment.asp) or the most current version.
b. Permittee shall use the least impactful methodology and activity sequencing to ensure impacts to the aquatic system are minimized to the maximum extent practicable. Examples include using a hydraulic, closed-lipped clamshell bucket, toothed clamshell bucket, dragline and/or excavator.
c. Dredged or excavated material is placed where sediment-laden water cannot enter waterways or wetlands in an uncontrolled manner. The discharge associated with the return of sediment-laden water into a water of the United States from an upland disposal site requires separate authorization from the District Engineer under NWP 16.
8. Chemically Treated Wood: Permittee shall not allow wood products treated with biologically harmful leachable chemical components (e.g. copper, arsenic, zinc, creosote, chromium, chloride, fluoride, and pentachlorophenol) to be placed over or come in contact with waters or wetlands.
a. New structures: Wood may be permanently or temporarily sealed with non-toxic products such as water-based silica or soy-based water repellants or sealers to prevent or limit leaching. Acceptable alternatives to chemically treated wood include untreated wood, steel (painted, unpainted or coated with epoxy-petroleum compound or plastic), concrete and plastic lumber.
b. Removal of existing chemically treated wood: Permittee shall prevent chemically treated wood debris from entering any waters or wetlands. In the event chemically treated wood debris inadvertently enters a water or wetland, permittee shall remove the material as soon as practicable and dispose of the material at an approved upland facility.
1) Permittee shall make every practicable effort to remove chemically treated wood piles in their entirety using a vibratory hammer.
i) In uncontaminated sediment, piling that breaks off during extraction shall be cut off at least three
(3) feet below the surface of the sediment.
ii) In contaminated sediment, piling that breaks off above the surface shall be cut off at the sediment line. If the break occurs within contaminated sediment, no further effort shall be made to remove the pile. Any resulting hole shall be filled with clean, native substrate.
http://www.dfw.state.or.us/� http://www.nwp.usace.army.mil/environment/sediment.asp�
9. Mechanized Equipment: In addition to the requirements in NWP General Condition 11, permittee shall implement the following to prevent or limit aquatic impacts from mechanized equipment:
a. In all events use the type of equipment that minimizes aquatic impacts spatially and temporally.
b. Use existing roads, paths, and drilling pads where available. Temporarily place mats or pads onto wetlands or tidal flats to provide site access. Temporary mats or pads shall be removed upon completion of the authorized work.
c. Operate equipment from the top of a streambank and conduct work outside of the active stream channel, unless specifically authorized by the District Engineer.
d. Isolate storage, staging, and fueling areas, and operate and maintain equipment in isolation from waters, wetlands, and riparian areas.
e. Maintain spill prevention and containment materials with ready access at vehicle staging areas.
Permittee and staff shall be trained to effectively deploy the measures. Spill response materials include straw matting/bales, geotextiles, booms, diapers, and other absorbent materials, shovels, brooms, and containment bags. In the event of a spill of petroleum products or other chemicals with potential to affect waters or wetlands, permittee shall immediately report the spill to the Oregon Emergency Response Service (OERS) at 1-800-452-0311 and shall implement containment and cleanup measures, as directed.
10. Deleterious Waste: In addition to the requirements in NWP General Condition 6, permittee shall not dispose of biologically harmful or waste materials into waters or wetlands. These materials include but are not limited to the following:
a. Petroleum products, chemicals, cement cured less than 24 hours, welding slag and grindings, concrete saw cutting by-products, sandblasted materials, chipped paint, tires, wire, steel posts, asphalt and waste concrete.
b. Discharge water created during construction activities (such as but not limited to concrete wash out, pumping for work area isolation, vehicle wash water, drilling fluids, dredging return flows, and sediment laden runoff) shall be treated to remove debris, sediment, petroleum products, metals, and other pollutants and discharged in a controlled fashion to avoid erosion. A separate Department of the Army permit and/or a National Pollutant Discharge Elimination System (NPDES) permit from Oregon Department of Environmental Quality’s (DEQ) may be required prior to discharge. Permittee is directed to contact the nearest DEQ office (http://www.deq.state.or.us/about/locations.htm) for more information about the NPDES program.
11. Stormwater Discharge Pollution Prevention: Activities that result in stormwater runoff passing over disturbed areas and impervious surfaces must include reduction measures, controls, treatment techniques and management practices to avoid discharge of soil, debris, toxics and other pollutants to waterways and wetlands.
a. Erosion Control: During construction and until the site is stabilized, the permittee shall ensure all practicable measures are implemented and maintained to prevent erosion and runoff. For proper erosion control measure selection and implementation, the permittee is referred to DEQ “Oregon Sediment and Erosion Control Manual,” April 2005, available at:
http://www.deq.state.or.us/wq/stormwater/escmanual.htm. Appropriate control measures and maintenance include, but are not limited to the following:
http://www.deq.state.or.us/about/locations.htm� http://www.deq.state.or.us/wq/stormwater/escmanual.htm� apunton Highlight
1) Permittee shall inspect and maintain control measures in good condition throughout construction and until permanent measures are well established. Permittee shall repair or replace any damages such as rips, broken stakes that result in loss of intended function. Permittee shall install additional control measures and reseed or replant with native and/or non-competitive species as necessary to achieve stabilization of the site. Spray-on mulches imbedded with benign sterile species may be used to temporarily stabilize the area until permanent controls are in place.
2) Once soils or slopes have been stabilized, permittee shall completely remove and properly dispose of or re-use all components of installed control measures.
b. Post-Construction Stormwater Management: If the activity will result in creation of new impervious surfaces and federally listed aquatic species or their habitat may be affected by the proposed activity permittee shall forward a copy of the post-construction stormwater management plan (SWMP) to the Portland District Engineer for our consultation under the Endangered Species Act. A copy of the SWMP must be submitted to the DEQ for their review and approval prior to initiating construction.
1) Submittal of the post-construction stormwater management plan to DEQ at the same time the application is submitted to the Corps will streamline the project review. DEQ’s Stormwater Management Plan Submission Guidelines for Removal/Fill Permit Applications which involve impervious surfaces can be found at http://www.deq.state.or.us/wq/sec401cert/docs/stormwaterGuidlines.pdf. This document provides information to determine the level of detail required for the plan based on project type, scope, location, and other factors, as well as references to assist in designing the plan and a checklist for a complete submission.
12. Upland Disposal: Material disposed of in uplands shall be placed in a location and manner that prevents discharge of the material and/or return water into waters or wetlands unless otherwise authorized by the Portland District Engineer.
a. Final disposition of materials removed from waters and wetlands to uplands may require separate approvals under Oregon State Solid Waste Rules. For more information please visit DEQ’s Solid Waste program at http://www.deq.state.or.us/lq/sw/index.htm.
b. Temporary upland stockpiles of excavated or dredged materials shall be isolated from waterways, wetlands, and floodwaters; stabilized prior to wet weather; and maintained using best management practices unless specifically authorized by the District Engineer.
13. Restoration of Temporary Impacts: To minimize temporal losses of waters of the U. S. construction activities within areas identified as temporary impacts shall not exceed two construction seasons or 24 months, whichever is less. For all temporary impacts, permittee shall provide the Portland District Engineer a description, photos, and any other documentation which demonstrates pre-project conditions with the Preconstruction Notification.
a. Site restoration of temporarily disturbed areas shall include returning the area to pre-project ground surface contours. Permittee shall revegetate temporarily disturbed areas with native, noninvasive herbs, shrubs, and tree species sufficient in number, spacing, and diversity to replace affected aquatic functions.
b. Site restoration shall be completed within 24 months of the initiation of impacts (unless otherwise required by the specific NWP). However, if the temporary impact requires only one construction season, site restoration shall be completed within that same construction season before the onset of seasonal rains.
http://www.deq.state.or.us/wq/sec401cert/docs/stormwaterGuidlines.pdf� http://www.deq.state.or.us/lq/sw/index.htm�
14. Permittee-responsible Compensatory Mitigation: When permittee-responsible compensatory mitigation is required by the Portland District Engineer to replace lost or adversely affected aquatic functions, the permittee shall provide long-term protection for the mitigation site through real estate instruments (e.g., deed restriction or conservation easement) or other available mechanisms. The appropriate long-term protection mechanism will be determined by the Portland District Engineer based on project-specific review and must be in place prior to initiating the permitted activity.
15. Inspection of the Project Site: The permittee shall allow representatives of the Portland District Engineer and/or DEQ to inspect the authorized activity to confirm compliance with nationwide permit terms and conditions. A request for access to the site will normally be made sufficiently in advance to allow a property owner or representative to be on site with the agency representative making the inspection.
16. Sale of Property/Transfer of Permit: Permittee shall obtain the signature(s) of the new owner(s) and transfer this permit in the event the permittee sells the property associated with this permit. To validate the transfer of this permit authorization, a copy of this permit with the new owner(s) signature shall be sent to the Portland District Engineer at the letterhead address on the verification letter.
NATIONWIDE SPECIFIC CONDITIONS:
NWP 3 – Maintenance
1. Permittee shall implement measures necessary to prevent streambed gradient alterations and streambank erosion.
NWP 5 – Scientific Measurement Devices
1. Permittee shall remove all scientific measurement devices including all associated structures and fills including anchoring devices, buoys, and cable within 30 days after research is completed.
NWP 6 – Survey Activities
1. Use of in-water explosives is not authorized.
2. Permittee shall isolate all in-stream exploratory trenching from the active channel.
NWP 12 – Utility Line Activities
1. Permittee shall install trench-blockers of a type and design sufficient to prevent the drainage of the wetland areas (e.g. bentonite clay plugs, compacted sand bags, etc.) where utility lines are buried within or immediately adjacent to wetlands and other waters.
2. Permittee shall remove and separately reserve the topsoil from the subsurface soils during trenching.
Permittee shall place the reserved topsoil as the final surface layer in backfilling the trench.
3. Agency coordination, per Nationwide Permit General Condition 31 (d), is required where utility lines are proposed in estuaries to ensure there are no impacts to native shellfish beds.
4. Manholes placed in streams or other waterways require specific approval by the District Engineer.
NWP 13 – Bank Stabilization
1. Permittee shall include the use of bioengineering techniques and natural products (e.g. vegetation and organic material such as root wads) in the project design to the maximum extent practicable and shall minimize the use of rock, except when it is anchoring large woody debris. Non-biodegradable materials, such as plastic netting, that may entrap wildlife or pose a safety concern shall not be used for soil stabilization. Riparian plantings shall be included in all project designs unless the permittee can demonstrate that such plantings are not practicable.
2. Riprap shall be clean (i.e. free of toxic contaminants and invasive species), durable, angular rock.
NWP 23 – Approved Categorical Exclusions
1. Pre-construction notification or other Corps-approved documentation is required for all activities which require a permit from the Portland District Engineer.
NWP 29 – Residential Developments
1. Wetland impacts associated with the construction or expansion of a single residence including attendant features (utility lines, roads, yards, etc) shall not exceed one-fourth (¼) acre.
NWP 41 – Reshaping Existing Drainage Ditches
1. All in-water work shall be isolated from the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .