Appendix_A.pdf

PDF 73 KB Posted

Attached to
IDIQ FOR MUTLI-YEAR ATON STRUCTURES REPLACEMENT FOR COLUMBIA & SNAKE RIVER SYSTEM
Solicitation number
HSCG88-16-B-PQQ039
Issued by

About this file

Appendix A

View the file

Other files

File Type Posted
PQQ039_Amendment_0006.pdf PDF
PQQ039_SF1442-14a_Amendment_0006.pdf PDF
PQQ039_Amendment_0005.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Amdt4.pdf PDF
PQQ039_Amendment_0004.pdf PDF
PQQ039_Amendment_0003.pdf PDF
Appendix_B.pdf PDF
PQQ039_Amendment_0002.pdf PDF
PQQ039_Amendment_0001.pdf PDF
Appendix_B.pdf PDF
Appendix_A.pdf PDF
WA94_Franklin_WA.pdf PDF
OR68_Hood_River_OR.pdf PDF
WA85_Walla_Walla_WA.pdf PDF
WA80_Pacific_WA.pdf PDF
WA91_Clark_WA.pdf PDF
PQQ039_Forecast.pdf PDF
OR77_Umatilla_OR.pdf PDF
ATON_Standard_Drawings.zip ZIP file
PQQ039_SF1442.pdf PDF
PQQ039_Contractor_Responsibility_Q.pdf PDF
OR80_Sherman_OR.pdf PDF
WA75_Klickitat_WA.pdf PDF
PQQ039_Historical.pdf PDF
ATON_Standard_Drawings1.zip ZIP file
OR63_Clatsop_OR.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Final.pdf PDF
OR54_Columbia_OR.pdf PDF
HSCG88-16-B-PQQ039_IFB_Solicitation.pdf PDF
OR79_Wasco_OR.pdf PDF
OR59_Multnomah_OR.pdf PDF
ATON-STD_15_sheet_1_of_1_Subcable.tif TIF image
WA92_Cowlitz_WA.pdf PDF
WA99_Skamania_WA.pdf PDF
PQQ039_Contractor_Request_for_Clarification.pdf PDF
WA84_Wahkiakum_WA.pdf PDF
WA89_Benton_WA.pdf PDF
ID70_Nez_Perce_ID.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7350778 Page 64

APPENDIX A:

WASHINGTON AND OREGON IN-WATER WORK WINDOWS

APPROVED WORK WINDOWS FOR FISH PROTECTION FOR

FOR WATERS WITHIN NATIONAL PARK BOUNDARIES,

COLUMBIA RIVER, SNAKE RIVER, AND LAKES

BY WATERCOURSE

(1) The general work window is given by watercourse: Columbia River, Snake River, Lakes or waters within National Park Boundaries.

(2) The work window for a listed watercourse applies to the mainstem. For approved work windows for tributaries or other freshwater areas, refer to Table 1.

(3) Where a tributary is listed as a boundary, that boundary shall be the line perpendicular to the receiving stream and which is projected from the most upstream point of the tributary mouth to the opposite bank of the receiving stream. (See Figure 1)

Figure 1. Stream boundary line

(4) Work within two hundred (200) feet landward of the State’s ordinary high water line in waters of the U.S. listed as "submit application" or "closed" is not authorized by the Washington Department of Fish and Wildlife (WDFW). Site review and a specific written authorization (and State HPA) are required for these state waters.

(5) Lakes do not include impoundments of the Columbia or Snake Rivers.

(6) These “approved work windows” are based on best available information as of the date of the Services’ concurrence with this informal consultation. They may be amended or deleted in the future as new information is obtained. The Corps will use the most current version of these windows when the authorizing projects for which conformance with the ESA is in part based on the windows in this programmatic consultation.

WATERCOURSE GENERAL WORK

WINDOW

SPECIFIC LAKE WORK WINDOW

Columbia River

--mouth to Snake River November 1 – February 28 --Snake River to Priest

Rapids Dam August 1 – August 31

--above Priest Rapids Dam

July 1 – August 31

Snake River August 1 – August 31 All Lakes (except Lake Washington system and Lake Chelan)

July 1 – August 15

Lake Washington Ship Canal (upstream of the Chittenden Locks to the east end of the Mountlake Cut)

October 1-April 15

Lake Washington South of I-90 --within 1 mile of Mercer

Slough or Cedar River July 16-July 31 and November 16-December 31

--further than 1 mile from Mercer Slough or Cedar River

July 16-December 31

Between I-90 & SR 520 July 16-April 30 North of SR 520 --Between SR 520 & a line drawn due west from Arrowhead Point

July 16-March 15

--North of a line drawn due west from Arrowhead Point

July 16-July 31 and November 16-February 1

Sammamish River July 16-July 31 and November 16-February 1

Lake Sammamish --further than 1/2 mile of

Issaquah Creek July 16-December 31

--within 1/2 mile of Issaquah Creek

July 16-July 31 and November 16-December 31

Lake Chelan December 1-May 15 [if the work is done in-the-dry and the lake level is lower than 1,094 feet (NGVD) when the work is performed] and July 1-August 15

All watercourses, including tributaries, within National Park boundaries

Submit Application

TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00 - GENERAL PARAGRAPHS
SECTION 01 33 00 - SUBMITTALS
SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION
SECTION 01 71 23 – FIELD ENGINEERING
DIVISION 02 – SITE CONSTRUCTION
SECTION 02 01 00 – MAINTENANCE OF EXISTING CONDITIONS
DIVISION 03 – CONCRETE
SECTION 03 31 00 – STRUCTURAL CAST IN PLACE CONCRETE
DIVISION 05 – METALS
SECTION 05 12 00 – STRUCTURAL STEEL
SECTION 05 50 00 – METAL FABRICATIONS
DIVISION 6 – WOOD AND PLASTICS
SECTION 06 71 00 – STRUCTURAL COMPOSITE SHAPES AND PLATES
DIVISION 31 - EARTHWORK
SECTION 31 62 16 – STEEL PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 31 00 - FENCES AND GATES
APPENDIX A:
WASHINGTON AND OREGON IN-WATER WORK WINDOWS
APPENDIX B:
MARINE MAMMAL MONITORING PLAN
Appendix A & B.pdf
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00 - GENERAL PARAGRAPHS
SECTION 01 33 00 - SUBMITTALS
SECTION 01 35 29 - SAFETY, HEALTH, AND ENVIRONMENTAL PROTECTION
SECTION 01 71 23 – FIELD ENGINEERING
DIVISION 02 – SITE CONSTRUCTION
SECTION 02 01 00 – MAINTENANCE OF EXISTING CONDITIONS
DIVISION 03 – CONCRETE
SECTION 03 31 00 – STRUCTURAL CAST IN PLACE CONCRETE
DIVISION 05 – METALS
SECTION 05 12 00 – STRUCTURAL STEEL
SECTION 05 50 00 – METAL FABRICATIONS
DIVISION 6 – WOOD AND PLASTICS
SECTION 06 71 00 – STRUCTURAL COMPOSITE SHAPES AND PLATES
DIVISION 31 - EARTHWORK
SECTION 31 62 16 – STEEL PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 31 00 - FENCES AND GATES
APPENDIX A:
OREGON IN-WATER WORK WINDOWS
APPENDIX B:
MARINE MAMMAL MONITORING PLAN
Appendix A_References C-2e Corps NWP Regional Permit Conditions.pdf
ALL NWPs –
NATIONWIDE SPECIFIC CONDITIONS:
NWP 3 – Maintenance
NWP 5 – Scientific Measurement Devices
NWP 6 – Survey Activities
NWP 12 – Utility Line Activities
NWP 13 – Bank Stabilization
NWP 23 – Approved Categorical Exclusions
NWP 29 – Residential Developments
NWP 41 – Reshaping Existing Drainage Ditches
1. All in-water work shall be isolated from the active stream channel or conducted during low seasonal stream flows.
NWP 43- Stormwater Management Facilities
NWP 44 - Mining Activities
1. Reclamation, when required, must be achieved within 24 months of completing the mining activity.
2. In-stream mining including bar scalping is not authorized by this NWP.
Appendix B_Marine Mammal Monitoring.pdf
MMMP_USCG Aids to Navigation Structure_revAug 26 2013.pdf
Enclosure (1) CONTRACTOR AND BIOLOGICAL MONITOR PROTOCOLS.pdf
Marine Mammal Sighting Form

File details come from the government source that posted it. Updated .