HSCG88-16-B-PQQ039_IFB_Solicitation.pdf

PDF 397 KB Posted

Attached to
IDIQ FOR MUTLI-YEAR ATON STRUCTURES REPLACEMENT FOR COLUMBIA & SNAKE RIVER SYSTEM
Solicitation number
HSCG88-16-B-PQQ039
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
PQQ039_Amendment_0006.pdf PDF
PQQ039_SF1442-14a_Amendment_0006.pdf PDF
PQQ039_Amendment_0005.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Amdt4.pdf PDF
PQQ039_Amendment_0004.pdf PDF
PQQ039_Amendment_0003.pdf PDF
Appendix_B.pdf PDF
PQQ039_Amendment_0002.pdf PDF
Appendix_A.pdf PDF
PQQ039_Amendment_0001.pdf PDF
Appendix_B.pdf PDF
Appendix_A.pdf PDF
WA94_Franklin_WA.pdf PDF
OR68_Hood_River_OR.pdf PDF
WA85_Walla_Walla_WA.pdf PDF
WA80_Pacific_WA.pdf PDF
WA91_Clark_WA.pdf PDF
PQQ039_Forecast.pdf PDF
OR77_Umatilla_OR.pdf PDF
ATON_Standard_Drawings.zip ZIP file
PQQ039_SF1442.pdf PDF
PQQ039_Contractor_Responsibility_Q.pdf PDF
OR80_Sherman_OR.pdf PDF
WA75_Klickitat_WA.pdf PDF
PQQ039_Historical.pdf PDF
ATON_Standard_Drawings1.zip ZIP file
OR63_Clatsop_OR.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Final.pdf PDF
OR54_Columbia_OR.pdf PDF
OR79_Wasco_OR.pdf PDF
OR59_Multnomah_OR.pdf PDF
ATON-STD_15_sheet_1_of_1_Subcable.tif TIF image
WA92_Cowlitz_WA.pdf PDF
WA99_Skamania_WA.pdf PDF
PQQ039_Contractor_Request_for_Clarification.pdf PDF
WA84_Wahkiakum_WA.pdf PDF
WA89_Benton_WA.pdf PDF
ID70_Nez_Perce_ID.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PQQ039 SF1442.doc

To access pages 1 & 2 of Standard Form (SF) 1442, double-click on the above icon.

After obtaining the SF 1442, close the document and continue scrolling down from this point to obtain the remainder of the Invitation For Bid (IFB).

YOU MUST RETURN THE FOLLOWING. FAILURE TO DO SO

MAY DEEM YOUR BID NON-RESPONSIVE.

A. ONE (1) COMPLETE COPY OF THE STANDARD FORM 1442

(SOLICITATION OFFER AND AWARD) AND ALL AMENDMENTS.

B. SECTION B (SCHEDULE OF PRICES).

C. SECTION J (CONTRACTOR’S RESPONSIBILITY

QUESTIONNAIRE).

D. SECTION K (REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFEROR’S).

E. SECTION L (BID BOND (STANDARD FORM 24) IN THE AMOUNT

OF $2,000.

PLEASE MAIL YOUR BID TO THE FOLLOWING ADDRESS:

CONTRACTING OFFICER

Attn: Lilian Librodo

IFB HSCG88-16-B-PQQ039

USCG Civil Engineering Unit 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

Please do not call to inquire about the status of your bid, as this information will not be released.

Invitation For Bid Number: HSCG88-16-B-PQQ039

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested parties are encouraged to contact the Coast U.S. Coast Guard Ombudsman for Agency Protests.

Under this informal process, the agency is not required to suspend contract award performance.

Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest either to the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.

Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protestor agrees not to file a protest with the GAO or other external forum. If the protest is file with an external forum, the agency protest will be dismissed.

The Ombudsman Hotline telephone number is 202.372.3695.

SECTION B

SCHEDUL OF PRICES

B.1 ATTACHMENTS

The following listed attachments are a part of this solicitation and any resulting contract:

1. Schedule of Prices, (Base Year and Option Years 1, 2, 3, and 4), Items 000001 through 492004

ITEM

NO.

DESCRIPTION EST.

QTY UNIT UNIT PRICE EST TOTAL

000001

Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the Columbia River, WA and OR and the Snake River, WA and ID for US Coast Guard for the Base Period from April 1, 2016 to March 31, 2017.

010000 IMPROPER CHARACTERISTIC TASK ORDER

011000 MOBILIZATION / DEMOBILIZATION:

011001 Mobilize for Improper Characteristic Task Order in Area No. 1. 1 per Task Order.

1 EA

011002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.

1 EA

011003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

011004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

011005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

011006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

011007

No. 4. 1 Per Task Order.

1 EA

011008 Demobilize for Improper Characteristic Task Order in Area No. 4. 1 Per Task Order.

1 EA

011009 Mobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

1 EA

011010 Demobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

1 EA

011011 Mobilize for Improper Characteristic Task Order in Area No. 6. 1 Per Task Order.

1 EA

011012 Demobilize for Improper Characteristic Task Order in Area No. 6. 1 Per Task Order.

1 EA

011013

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

011014

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

011015

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

011016

Mobilize and Demobilize from one site in Area No. 4 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

011017

Mobilize and Demobilize from one site in Area No.5 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

011018

Mobilize and Demobilize from one site in Area No. 6 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

012000 REMOVALS – IN WATER CONSTRUCTION

012001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02.

1 EA

012002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

1 EA

012003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.

1 EA

012004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

1 EA

012005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.

1 EA

012006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

012007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials.

1 EA

012008 Remove and dispose of one NON ATON piling using vibratory method

012500 Removals - Shore Construction

012501

Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

1 EA

012502

Remove sectional tower assembly and disassemble.

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.

1 EA

012503 Remove concrete foundation up to 6 Cubic Yards.

Contractor shall dispose of all other materials.

1 EA

012504 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials.

1 CY

013000 INSTALLATIONS

013100 IN WATER CONSTRUCTION - INSTALLATIONS

013101

Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

Remove and return temporary buoy.

1 EA

013102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

013103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.

1 EA

013104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

1 EA

013105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.

1 EA

013106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08.

1 EA

013107

Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08.

1 EA

013108 Install a concrete pedestal foundation on a break wall.

Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.

1 EA

013109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.

1 CY

013110

Install a submerged obstruction concrete foundation.

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .

1 EA

013111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.

013112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.

1 EA

013113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.

1 EA

013114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD 06,

ATON STD 09, ATON STD 10 and ATON STD 11.

1 EA

013115 Install one (1) NON ATON steel pile using the vibratory method

013500 SHORE CONSTRUCTION - INSTALLATION

013501 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.

1 EA

013502 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07.

1 EA

013503 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing

ATON STD 07.

1 EA

013504 Install a concrete pedestal foundation on a land location.

As per drawing ATON STD 05.

1 EA

013505

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD 06,

ATON STD 09, ATON STD 10 and ATON STD 11.

013506 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire

1 EA

013507 Provide and install an additional 4 linier feet of fence.

020000 EMERGENCY TASK ORDERS

021000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

021001 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 1. 1 per Task Order.

1 EA

021002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order.

1 EA

021003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order.

1 EA

021004 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 4. 1 per Task Order.

1 EA

021005 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 5. 1 Per Task Order.

1 EA

021006 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 6. 1 Per Task Order.

022000 REMOVALS

022001 including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.

1 EA

022002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

1 EA

022003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

Contractor shall dispose of all other materials.

022004

Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

1 EA

022005

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

030000 TRANSIT COSTS

030001 A. Transit from one in water work location to another in water work location on the same Task Order per nautical mile (NM).

1 NM

040000 REPAIRS

040001

Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON

STD 12, ATON STD 13 and ATON STD 14.

1 EA

040002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.

1 EA

040003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD

02, ATON STD 03, ATON STD 04, ATON STD 05,

ATON STD 06, and ATON STD 11.

050000 MATERIALS

050001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF).

1 LF

050002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.

050003

Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.

1 EA

050004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing

ATON STD 05.

1 EA

050005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD

06. 1 LFT

050006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.

1 EA

050007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.

1 EA

050008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.

1 EA

050009

Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.

1 Set

050010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.

1 EA

050011

Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

1 EA

050012

Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

1 EA

050013

Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

050014

Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 08.

1 EA

050015

Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10.

1 EA

050016

Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10.

1 EA

050017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.

1 SET

050018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.

1 SET

050019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.

1 EA

050020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.

1 EA

050021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing

ATON STD 12.

1 EA

050022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing

ATON STD 12.

1 EA

050023 Provide a manufactured cable type Safety Climb Device.

In accordance with drawing ATON STD 14.

060000 RETURN OF GOVERNMENT MATERIALS

060001

At the completion of a Task Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order.

070000 AS-BUILT PHOTOGRAPHS

070001

Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Task Order may be combined on one CD.)

080000 DIVING SERVICES

080001

Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.

1 EA

080002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.

090000 FIELD ENGINEERING

090001 Perform a geodetic survey as per the requirements of VERTICAL and HORIZONTAL methods.

091000 MARINE MAMMAL MONITORING

091001

Geographical Area 1 (Snake River from Lower Monumental Dam to Lewiston, ID): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

091002

Geographical Area 2 (Columbia River from McNary Dam to Richland, WA and Snake River up to Lower Monumental Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

091003

Geographical Area 3 (Columbia River from John Day Dam to McNary Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

091004

Geographical Area 4 (Columbia River from Bonneville Dam to Joh Day Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

091005

Geographical Area 5 (Columbia River from Lewis and Clark Bridge to Bonneville Dam and Willamette River up to, and including, Multnomah Channel and Wilsonville, OR): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

091006

Geographical Area 6 (Columbia River from Lewis and Clark Bridge to Pacific Ocean including structures within a 10NM radius west of western most point of northern entrance jetty)): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

091007

Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform monitoring services on the ATON site for one 8-hour day. Applies to Geographical Areas 1, 2, 3, 4, 5, and 6.

1 DY

091008

Standby for Marine Mammal(s): Includes labor and equipment for the construction crew to standby while waiting for a marine mammal to vacate the construction area.

1 HR

092000 EELGRASS SURVEY

092001

Geographical Area 1 (South of Seaside, OR to the waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

092002

Geographical Area 2 (South of Yaquina Head, OR to the waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

092003

Geographical Area 3 (South of Coquille Point, OR to the waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

092004

Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform eelgrass surveys on the ATON site for one 8-hour day. Applies to Geographical Areas 1,2 and 3.

1 DY

Total Base Year $ ________________________

100001

Option Year 1: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the Columbia River, WA and OR and the

Base Period from April 1, 2017 to March 31, 2018.

110000 IMPROPER CHARACTERISTIC TASK ORDER

111000 MOBILIZATION / DEMOBILIZATION:

111001

No. 1. 1 per Task Order.

1 EA

111002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.

1 EA

111003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

111004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

111005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

111006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

111007 Mobilize for Improper Characteristic Task Order in Area No. 4. 1 Per Task Order.

1 EA

111008 Demobilize for Improper Characteristic Task Order in Area No. 4. 1 Per Task Order.

1 EA

111009 Mobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

111010 Demobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

1 EA

111011 Mobilize for Improper Characteristic Task Order in Area No. 6. 1 Per Task Order.

1 EA

111012 Demobilize for Improper Characteristic Task Order in Area No. 6. 1 Per Task Order.

1 EA

111013

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

111014

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

111015

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

111016

Mobilize and Demobilize from one site in Area No. 4 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

111017

Mobilize and Demobilize from one site in Area No.5 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

111018

Mobilize and Demobilize from one site in Area No. 6 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

112000 REMOVALS – IN WATER CONSTRUCTION

112001 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02.

112002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

1 EA

112003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.

1 EA

112004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

1 EA

112005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.

1 EA

112006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

1 EA

112007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials.

1 EA

112008 Remove and dispose of one NON ATON piling using vibratory method

112500 Removals - Shore Construction

112501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

112502

Remove sectional tower assembly and disassemble.

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.

1 EA

112503 Remove concrete foundation up to 6 Cubic Yards.

Contractor shall dispose of all other materials.

1 EA

112504 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other materials.

113000 INSTALLATIONS

113100 IN WATER CONSTRUCTION - INSTALLATIONS

113101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

Remove and return temporary buoy.

1 EA

113102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

1 EA

113103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.

1 EA

113104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

1 EA

113105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.

113106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD 08.

1 EA

113107

Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD 08.

1 EA

113108 Install a concrete pedestal foundation on a break wall.

Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.

1 EA

113109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.

1 CY

113110

Install a submerged obstruction concrete foundation.

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .

1 EA

113111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.

1 EA

113112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.

1 EA

113113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.

1 EA

113114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD 06,

ATON STD 09, ATON STD 10 and ATON STD 11.

1 EA

113115 Install one (1) NON ATON steel pile using the vibratory method

113500 SHORE CONSTRUCTION - INSTALLATION

113501 assembly. In accordance with drawing ATON STD 07.

1 EA

113502 Install a concrete foundation to receive a sectional tower assembly. In accordance with drawing ATON STD 07.

1 EA

113503 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing

ATON STD 07.

1 EA

113504 Install a concrete pedestal foundation on a land location.

As per drawing ATON STD 05.

1 EA

113505

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD 06,

ATON STD 09, ATON STD 10 and ATON STD 11.

1 EA

113506 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire

1 EA

113507 Provide and install an additional 4 linier feet of fence.

120000 EMERGENCY TASK ORDERS

121000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

121001 in Area No. 1. 1 per Task Order.

1 EA

121002 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 2. 1 Per Task Order.

1 EA

121003 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 3. 1 Per Task Order.

1 EA

121004 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 4. 1 per Task Order.

1 EA

121005 Mobilize and Demobilize for EMERGENCY Task Order in Area No. 5. 1 Per Task Order.

1 EA

121006 Mobilize and Demobilize or EMERGENCY Task Order in Area No. 6. 1 Per Task Order.

122000 REMOVALS

122001 including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.

1 EA

122002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions under EMERGENCY Task Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

1 EA

122003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Task Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

Contractor shall dispose of all other materials.

1 EA

122004

Remove damaged wood pile channel marking structure consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Task Order.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

1 EA

122005

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Task Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

130000 TRANSIT COSTS

130001 water work location on the same Task Order per nautical mile (NM).

140000 REPAIRS

140001 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON

STD 12, ATON STD 13 and ATON STD 14.

140002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.

1 EA

140003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD

02, ATON STD 03, ATON STD 04, ATON STD 05,

ATON STD 06, and ATON STD 11.

150000 MATERIALS

150001 strait seam steel pipe, priced per linear foot (LF).

1 LF

150002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.

1 EA

150003

Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.

1 EA

150004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing

ATON STD 05.

1 EA

150005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD

06. 1 LFT

150006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.

1 EA

150007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.

1 EA

150008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.

1 EA

150009

Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.

1 Set

150010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.

150011 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

1 EA

150012

Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

1 EA

150013

Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

1 EA

150014

Provide a fabricated unassembled 5 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 08.

1 EA

150015

Provide a fabricated unassembled 10 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10.

1 EA

150016

Provide a fabricated unassembled 15 foot section of sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10.

1 EA

150017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.

1 SET

150018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.

1 SET

150019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.

1 EA

150020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.

1 EA

150021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing

ATON STD 12.

150022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing

ATON STD 12.

1 EA

150023 Provide a manufactured cable type Safety Climb Device.

In accordance with drawing ATON STD 14.

160000 RETURN OF GOVERNMENT MATERIALS

160001 materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this Task order.

170000 AS-BUILT PHOTOGRAPHS

170001 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Task Order may be combined on one CD.)

180000 DIVING SERVICES

180001 position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.

1 EA

180002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.

190000 FIELD ENGINEERING

190001

VERTICAL and HORIZONTAL methods.

191000 MARINE MAMMAL MONITORING

191001

Monumental Dam to Lewiston, ID): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

191002

Geographical Area 2 (Columbia River from McNary Dam to Richland, WA and Snake River up to Lower Monumental Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

191003

Geographical Area 3 (Columbia River from John Day Dam to McNary Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

191004

Geographical Area 4 (Columbia River from Bonneville Dam to Joh Day Dam): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

191005

Geographical Area 5 (Columbia River from Lewis and Clark Bridge to Bonneville Dam and Willamette River up to, and including, Multnomah Channel and Wilsonville, OR): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

191006

Geographical Area 6 (Columbia River from Lewis and Clark Bridge to Pacific Ocean including structures within a 10NM radius west of western most point of northern entrance jetty)): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

191007

Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform monitoring services on the ATON site for one 8-hour day. Applies to Geographical Areas 1, 2, 3, 4, 5, and 6.

1 DY

191008

Standby for Marine Mammal(s): Includes labor and equipment for the construction crew to standby while waiting for a marine mammal to vacate the construction area.

192000 EELGRASS SURVEY

192001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of

192002

Geographical Area 2 (South of Yaquina Head, OR to the waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

192003

Geographical Area 3 (South of Coquille Point, OR to the waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary reporting for one ATON structure within/per body of water.

1 EA

192004

Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform eelgrass surveys on the ATON site for one 8-

Total Option Year One $ ______________________

200001

Option Year 2: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in the Columbia River, WA and OR and the

Base Period from April 1, 2018 to March 31, 2019.

210000 IMPROPER CHARACTERISTIC TASK ORDER

211000 MOBILIZATION / DEMOBILIZATION:

211001

No. 1. 1 per Task Order.

1 EA

211002 Demobilize for Improper Characteristic Task Order in Area No. 1. 1 Per Task Order.

1 EA

211003 Mobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

211004 Demobilize for Improper Characteristic Task Order in Area No. 2. 1 Per Task Order.

1 EA

211005 Mobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

211006 Demobilize for Improper Characteristic Task Order in Area No. 3. 1 Per Task Order.

1 EA

211007 Mobilize for Improper Characteristic Task Order in Area No. 4. 1 Per Task Order.

1 EA

211008 Demobilize for Improper Characteristic Task Order in Area No. 4. 1 Per Task Order.

1 EA

211009 Mobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

1 EA

211010 Demobilize for Improper Characteristic Task Order in Area No. 5. 1 Per Task Order.

211011

No. 6. 1 Per Task Order.

1 EA

211012 Demobilize for Improper Characteristic Task Order in Area No. 6. 1 Per Task Order.

1 EA

211013

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

211014

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

211015

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

211016

Mobilize and Demobilize from one site in Area No. 4 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

211017

Mobilize and Demobilize from one site in Area No.5 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

1 EA

211018

Mobilize and Demobilize from one site in Area No. 6 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

212000 REMOVALS – IN WATER CONSTRUCTION

212001 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

212002 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

1 EA

212003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.

1 EA

212004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

1 EA

212005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.

1 EA

212006

Remove damaged wood pile range structure consisting of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials.

1 EA

212007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials.

1 EA

212008 Remove and dispose of one NON ATON piling using vibratory method

212500 Removals - Shore Construction

212501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

212502

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.

1 EA

212503 Remove concrete foundation up to 6 Cubic Yards.

Contractor shall dispose of all other materials.

1 EA

212…