PQQ039_Historical.pdf

PDF 24 KB Posted

Attached to
IDIQ FOR MUTLI-YEAR ATON STRUCTURES REPLACEMENT FOR COLUMBIA & SNAKE RIVER SYSTEM
Solicitation number
HSCG88-16-B-PQQ039
Issued by

About this file

Historical Reference

View the file

Other files

File Type Posted
PQQ039_Amendment_0006.pdf PDF
PQQ039_SF1442-14a_Amendment_0006.pdf PDF
PQQ039_Amendment_0005.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Amdt4.pdf PDF
PQQ039_Amendment_0004.pdf PDF
PQQ039_Amendment_0003.pdf PDF
Appendix_B.pdf PDF
PQQ039_Amendment_0002.pdf PDF
Appendix_A.pdf PDF
PQQ039_Amendment_0001.pdf PDF
Appendix_B.pdf PDF
Appendix_A.pdf PDF
WA94_Franklin_WA.pdf PDF
OR68_Hood_River_OR.pdf PDF
WA85_Walla_Walla_WA.pdf PDF
WA80_Pacific_WA.pdf PDF
WA91_Clark_WA.pdf PDF
PQQ039_Forecast.pdf PDF
OR77_Umatilla_OR.pdf PDF
ATON_Standard_Drawings.zip ZIP file
PQQ039_SF1442.pdf PDF
PQQ039_Contractor_Responsibility_Q.pdf PDF
OR80_Sherman_OR.pdf PDF
WA75_Klickitat_WA.pdf PDF
ATON_Standard_Drawings1.zip ZIP file
OR63_Clatsop_OR.pdf PDF
7350778_Columbia_ _Snake_River_Multi_Year_ATON_Contract_Final.pdf PDF
OR54_Columbia_OR.pdf PDF
HSCG88-16-B-PQQ039_IFB_Solicitation.pdf PDF
OR79_Wasco_OR.pdf PDF
OR59_Multnomah_OR.pdf PDF
ATON-STD_15_sheet_1_of_1_Subcable.tif TIF image
WA92_Cowlitz_WA.pdf PDF
WA99_Skamania_WA.pdf PDF
PQQ039_Contractor_Request_for_Clarification.pdf PDF
WA84_Wahkiakum_WA.pdf PDF
WA89_Benton_WA.pdf PDF
ID70_Nez_Perce_ID.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG88-08-D-623052

Historical Information

PIID fication Nu Date Signed Completion Date Description of Requirement Vendor Name ber of Act Action Obligation and Exercised Optionsase and All Options Val HSCG8808D623052 0 06/13/2008 COLUMBIA RIVER MULTI-YEAR ATON TERM PILE CONTRACT, BASE CONTRACT GUARANTEE, GE BERGERSON CONSTRUCTION 1 $25,000.00 $0.00 $1,560,131.00 HSCG8808D623052 P00001 07/30/2008 COLUMBIA RIVER MULTI-YEAR ATON TERM PILE CONTRACT, BASE CONTRACT GUARANTEE, GE BERGERSON CONSTRUCTION 1 -$25,000.00 $0.00 -$25,000.00 HSCG8808D623052 P00002 06/12/2009 COLUMBIA RIVER MULTI-YEAR ATON TERM PILE CONTRACT, BASE CONTRACT GUARANTEE, OF $25,000.00 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $0.00 HSCG8808D623052 P00003 07/14/2009 COLUMBIA RIVER MULTI-YEAR ATON TERM PILE CONTRACT, BASE CONTRACT GUARANTEE, OF $25,000.00 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $5,153.00 HSCG8808D623052 P00004 08/02/2010 EXERCISE OPT YEAR 2: ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $806,581.00 HSCG8808D623052 P00005 09/24/2010 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $1,006,000.00 HSCG8808D623052 P00006 09/24/2010 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $9,000.00 HSCG8808D623052 P00007 06/17/2011 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $790,577.00 HSCG8808D623052 P00008 06/15/2012 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $25,000.00 $0.00 $799,197.00 HSCG8808D623052 P00009 09/20/2012 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $0.00 HSCG8808D623052 P00010 02/08/2013 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $9,671.00 HSCG8808D623052 P00011 02/14/2013 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 $0.00 $0.00 $0.00 HSCG8808D623052 P00012 04/29/2014 ATON STRUCTURES REPLACEMENT FOR COLUMBIA RIVER SYSTEM PSN 431867 BERGERSON CONSTRUCTION 1 -$25,000.00 $0.00 $0.00 HSCG8808J623051 0 07/24/2008 06/14/2013 ATON REPAIRS BERGERSON CONSTRUCTION 1 $89,200.00 $89,200.00 $89,200.00 HSCG8808J623051 1 07/10/2009 06/14/2013 TO ADD GEODETIC PRE-SURVEY TO BE PERFORM AT TANSY PIER REAR RANGE AND WARRIOR ROCK FRONT RANGE BERGERSON CONSTRUCTION 1 $5,153.00 $5,153.00 $5,153.00 HSCG8808J623243 0 09/10/2008 06/14/2013 AIDS TO NAVIGATION FOR COLUMBIA RIVER, ASTORIA, OR BERGERSON CONSTRUCTION 1 $599,780.00 $599,780.00 $599,780.00 HSCG8809J623233 0 06/25/2009 06/14/2013 MAINTENANCE AND REPAIR OF ATONS BERGERSON CONSTRUCTION 1 $600,531.00 $600,531.00 $600,531.00 HSCG8809J623233 P00001 07/14/2009 06/14/2013 COLUMBIA RIVER ATON WORK BERGERSON CONSTRUCTION 1 -$69,363.00 -$69,363.00 -$69,363.00 HSCG8809J623233 P00002 07/27/2009 06/14/2013 REPAIR AIDS TO NAVIGATION BERGERSON CONSTRUCTION 1 -$30,955.00 -$30,955.00 -$30,955.00 HSCG8809J623233 P00003 02/22/2010 06/14/2013 FABRICATE LONGER PILE FOR WALKER ISLAND LIGHT 12 DUE TO INCORRECT WATER DEPTH LISTED FOR STRUCTURE. FURNISH ADDITIONAL 70 LF 18" DIAMETER STEEL P BERGERSON CONSTRUCTION 1 $11,962.00 $11,962.00 $11,962.00 HSCG8809J623233 P00004 09/27/2011 06/14/2013 ATON WORK, COLUMBIA RIVER BERGERSON CONSTRUCTION 1 -$6,250.00 -$6,250.00 -$6,250.00 HSCG8810JPQQ005 0 12/16/2009 06/14/2013 DELIVERY ORDER: #O1-02 ON COLUMBIA RIVER MYACREBUILD 12 STRUCTURESGE: $683,983 BERGERSON CONSTRUCTION 1 $653,326.00 $653,326.00 $653,326.00 HSCG8810JPQQ005 P00001 04/01/2013 06/14/2013 DELIVERY ORDER: #O1-02 ON COLUMBIA RIVER MYACREBUILD 12 STRUCTURESGE: $683,983 BERGERSON CONSTRUCTION 1 -$2,500.00 -$2,500.00 -$2,500.00 HSCG8810JPQQ006 0 10/26/2009 06/14/2013 EXECUTE A DELIVERY ORDER AGAINST COLUMBIA RIVER MYAC CONTRACT HSCG88-08-D-623052, OPTION YEAR ONE FOR A 3RD ORDER SURVEY AT ANT KENNEWICK. LINE ITEBERGERSON CONSTRUCTION 1 $5,000.00 $5,000.00 $5,000.00 HSCG8810JPQQ244 0 09/27/2010 11/02/2010 EMERGENCY DELIVER ORDER AGAINST COLUMBIA RIVER MYAC #O2-01. NEED TO RELOCATE TWO AIDS TO NAVIGATION FROM CURRENT POSITION TO POSITION IN 18' OF WABERGERSON CONSTRUCTION 1 $223,970.00 $223,970.00 $223,970.00 HSCG8811JPQQ002 0 11/05/2010 06/14/2011 CONTRACT NO. HSCG88-08-D-623052; TASK ORDER NO. HSCG88-11-J-PQQ002; COLUMBIA RIVER MULTI YEAR ATON CONTRACT DLIVERY ORDER NUMBER 02-02 (OPTION YEAR BERGERSON CONSTRUCTION 1 $258,524.00 $258,524.00 $258,524.00 HSCG8811JPQQ002 P00001 12/07/2010 06/14/2011 CONTRACT NO. HSCG88-08-D-623052; TASK ORDER NO. HSCG88-11-J-PQQ002; COLUMBIA RIVER MULTI YEAR ATON CONTRACT DLIVERY ORDER NUMBER 02-02 (OPTION YEABERGERSON CONSTRUCTION 1 -$1,304.00 -$1,304.00 -$1,304.00 HSCG8811JPQQ002 P00002 12/20/2011 06/14/2011 CONTRACT NO. HSCG88-08-D-623052; TASK ORDER NO. HSCG88-11-J-PQQ002; COLUMBIA RIVER MULTI YEAR ATON CONTRACT DLIVERY ORDER NUMBER 02-02 (OPTION YEABERGERSON CONSTRUCTION 1 -$2,500.00 -$2,500.00 -$2,500.00 HSCG8811JPQQ002 P00003 05/17/2013 06/14/2011 CONTRACT NO. HSCG88-08-D-623052; TASK ORDER NO. HSCG88-11-J-PQQ002; COLUMBIA RIVER MULTI YEAR ATON CONTRACT DLIVERY ORDER NUMBER 02-02 (OPTION YEABERGERSON CONSTRUCTION 1 -$0.30 -$0.30 -$0.30 HSCG8811JPQQ038 0 11/03/2010 06/14/2011 COLUMBIA RIVER MULTI YEAR ATON CONTRACTDELIVERY ORDER NUMBER 02-03 (OPTION YEAR 2)CASUALTY RESPONSE TO WAUNA REAR RANGE (LLNR 10435) BERGERSON CONSTRUCTION 1 $106,208.00 $106,208.00 $106,208.00 HSCG8811JPQQ038 P00001 12/07/2010 06/14/2011 COLUMBIA RIVER MULTI YEAR ATON CONTRACTDELIVERY ORDER NUMBER 02-03 (OPTION YEAR 2)CASUALTY RESPONSE TO WAUNA REAR RANGE (LLNR 10435) BERGERSON CONSTRUCTION 1 $6,560.00 $6,560.00 $6,560.00 HSCG8811JPQQ069 0 12/23/2010 06/14/2011 CASREP: COLUMBIA RIVER MULTI-YEAR ATON CONTRACT DELIVERY ORDER #02-04 BERGERSON CONSTRUCTION 1 $152,475.00 $152,475.00 $152,475.00 HSCG8811JPQQ069 P00001 02/04/2011 06/14/2011 CASREP: COLUMBIA RIVER MULTI-YEAR ATON CONTRACT DELIVERY ORDER #02-04 BERGERSON CONSTRUCTION 1 -$7,440.00 -$7,440.00 -$7,440.00 HSCG8812JPQQ019 0 12/08/2011 06/14/2012 DEMOLITION OF FAILED TAMSY PT. REAR RANGE - EMERGENCY DELEVERY ORDER BERGERSON CONSTRUCTION 1 $15,000.00 $15,000.00 $15,000.00 HSCG8812JPQQ023 0 01/26/2012 06/14/2012 AIDS-TO-NAVIGATION REBUILD TANSY POINT RR (LLNR10035) PSN 4375253 BERGERSON CONSTRUCTION 1 $67,750.00 $67,750.00 $67,750.00 HSCG8813JPQQ052 0 01/18/2013 04/08/2013 MATERIALS FOR COLUMBIA RIVER MYAC DELIVERY ORDER O4-01IGF::OT::IGF BERGERSON CONSTRUCTION 1 $100,509.00 $100,509.00 $100,509.00 HSCG8813JPQQ053 0 02/14/2013 02/28/2013 PROVIDE LABOR AND EQUIPMENT FOR COLUMBIA RIVER MYAC DELIVERY ORDER O4-02 CONSTRUCTIONIGF::OT::IGF BERGERSON CONSTRUCTION 1 $67,763.00 $67,763.00 $67,763.00 HSCG8813JPQQ053 P00001 03/15/2013 03/18/2013 PROVIDE LABOR AND EQUIPMENT FOR COLUMBIA RIVER MYAC DELIVERY ORDER O4-02 CONSTRUCTIONIGF::OT::IGF BERGERSON CONSTRUCTION 1 $25,750.00 $25,750.00 $25,750.00

38 $2,869,148.70 $2,869,148.70 $7,830,458.70

Reference Only -

File details come from the government source that posted it. Updated .