GAOA Silver Lake Boardwalk

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LT22R0005
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Salt Lake City, Utah, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for the complete reconstruction of the boardwalk and fishing pier improvements at Silver Lake located on the Salt Lake Ranger District of the Uinta-Wasatch-Cache National Forest in Utah. Offerors are to remove the existing structures and install a new boardwalk, fishing pier, interpretive signs and aggregate paths. Proposals are due to the contracting officer at the USDA Forest Service by April 20, 2022. Offerors must be registered in SAM and provide separate technical and pricing proposals along with performance and payment bonds. The work is to begin no later than July 2022 through November 2022, with an estimated contract value between $1,000,000 to $5,000,000.

This is a total small business set-aside designated under NAICS code 237990. The place of performance is Salt Lake City, UT. Questions are due by April 20, 2022 and the solicitation is designated with an estimated construction value of $1,000,000 to $5,000,000 to be completed between July 2022 through November 2022. Amendments to the solicitation will be posted on the federal contracting website.

Notice text

3 versions

Update #3 · Latest ·

**Amendment 2

Provides additional questions, answers and clarifications for this opportunity. 

It aslo includes the US Army Corps of Engineers Pre-Construction Notification (PCN)

Closing date has been extended to May 19, 2022 at 1:00 PM Mountain Time (local time)

**Amendment 1

Provides questions and answers for this opportunity.

Closing date remains the same of May 12, 2022 at 1:00 PM Mountain Time (local time)

General Information

    Document Type:    Solicitation Notice
    Solicitation Type:    RFP
    Set-Aside                Total Small Business Set-Aside
    NAICS                     237990
    Solicitation No.:    1240LT22R0005

Description
This project includes the complete reconstruction of the boardwalk at Silver Lake. The work includes but is not limited to the removal of existing boardwalk and fishing pier improvements, installation of the new boardwalk and fishing pier improvements, salvage and reinstallation of existing interpretive signs and kiosk, and installation of aggregate paths.

The project is located on the Salt Lake Ranger District of the Uinta-Wasatch-Cache National Forest, Salt Lake County, Utah, in the Northwest corner of Section 35, Township 2 South, Range 3 East of the Salt Lake Meridian. Located 14.2 miles from the mouth of Big Cottonwood Canyon on State Highway 190 near Brighton Ski Resort.  The boardwalk begins at latitude 40.603558°, longitude 111.584622°.

The work anticipated under any contract resulting from the solicitation will begin no later than July of 2022 through November of 2022. 

In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.


Questions regarding this solicitation are due in writing to the CO, Chris Hansen, christine.m.hansen@usda.gov
By Wednesday, April, 20, 2022 at 1:00 PM (Mountain Time) Local Time.

Another formal site visit will NOT be held.


Keep Technical Proposal and Pricing Proposal as separate documents.


Performance and Payment Bonds are required
A Bid Bond is required

Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE.  If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.

All future information about this acquisition, including amendments, will be distributed solely through this site.  Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM). 


 

Update #2 ·

**Amendment 1

Provides questions and answers for this opportunity.

Closing date remains the same of May 12, 2022 at 1:00 PM Mountain Time (local time)

General Information

    Document Type:    Solicitation Notice
    Solicitation Type:    RFP
    Set-Aside                Total Small Business Set-Aside
    NAICS                     237990
    Solicitation No.:    1240LT22R0005

Description
This project includes the complete reconstruction of the boardwalk at Silver Lake. The work includes but is not limited to the removal of existing boardwalk and fishing pier improvements, installation of the new boardwalk and fishing pier improvements, salvage and reinstallation of existing interpretive signs and kiosk, and installation of aggregate paths.

The project is located on the Salt Lake Ranger District of the Uinta-Wasatch-Cache National Forest, Salt Lake County, Utah, in the Northwest corner of Section 35, Township 2 South, Range 3 East of the Salt Lake Meridian. Located 14.2 miles from the mouth of Big Cottonwood Canyon on State Highway 190 near Brighton Ski Resort.  The boardwalk begins at latitude 40.603558°, longitude 111.584622°.

The work anticipated under any contract resulting from the solicitation will begin no later than July of 2022 through November of 2022. 

In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.


Questions regarding this solicitation are due in writing to the CO, Chris Hansen, christine.m.hansen@usda.gov
By Wednesday, April, 20, 2022 at 1:00 PM (Mountain Time) Local Time.

Another formal site visit will NOT be held.


Keep Technical Proposal and Pricing Proposal as separate documents.


Performance and Payment Bonds are required
A Bid Bond is required

Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE.  If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.

All future information about this acquisition, including amendments, will be distributed solely through this site.  Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM). 


 

Update #1 ·

General Information

    Document Type:    Solicitation Notice
    Solicitation Type:    RFP
    Set-Aside                Total Small Business Set-Aside
    NAICS                     237990
    Solicitation No.:    1240LT22R0005

Description
This project includes the complete reconstruction of the boardwalk at Silver Lake. The work includes but is not limited to the removal of existing boardwalk and fishing pier improvements, installation of the new boardwalk and fishing pier improvements, salvage and reinstallation of existing interpretive signs and kiosk, and installation of aggregate paths.

The project is located on the Salt Lake Ranger District of the Uinta-Wasatch-Cache National Forest, Salt Lake County, Utah, in the Northwest corner of Section 35, Township 2 South, Range 3 East of the Salt Lake Meridian. Located 14.2 miles from the mouth of Big Cottonwood Canyon on State Highway 190 near Brighton Ski Resort.  The boardwalk begins at latitude 40.603558°, longitude 111.584622°.

The work anticipated under any contract resulting from the solicitation will begin no later than July of 2022 through November of 2022. 

In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.


Questions regarding this solicitation are due in writing to the CO, Chris Hansen, christine.m.hansen@usda.gov
By Wednesday, April, 20, 2022 at 1:00 PM (Mountain Time) Local Time.

Another formal site visit will NOT be held.


Keep Technical Proposal and Pricing Proposal as separate documents.


Performance and Payment Bonds are required
A Bid Bond is required

Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE.  If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.

All future information about this acquisition, including amendments, will be distributed solely through this site.  Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM). 


 

Attachments

Show all 20

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
GAOA Silver Lake Boardwalk Award Award Notice
GAOA Silver Lake Boardwalk This notice · Latest solicitation Solicitation
GAOA Silver Lake Boardwalk Pre-Solicitation
GAOA Silver Lake Boadwalk Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity