Attachment 4-HelicalTestPierReport.SilverLake.Final.10.30.2014.pdf
PDF 1 MB Posted
- Attached to
- GAOA Silver Lake Boardwalk Federal contract opportunity
- Solicitation number
- 1240LT22R0005
- Issued by
- Department of Agriculture Forest Service
About this file
This solicitation is for the reconstruction of the boardwalk and fishing pier improvements at Silver Lake on the Salt Lake Ranger District of the Uinta-Wasatch-Cache National Forest in Utah. The work includes removal of the existing structures, installation of a new boardwalk and fishing pier, salvage and reinstallation of interpretive signs and a kiosk, and installation of aggregate paths. The estimated value of construction is between $1,000,000 and $5,000,000. Questions regarding this opportunity are due by April 20, 2022 and responses are not anticipated. Interested parties must register in the System for Award Management and monitor the site for any amendments. Performance and payment bonds are required and bids are due under Solicitation Number 1240LT22R0005 by the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_Silver Lake Boardwalk 5-6-2022.pdf | ||
| SF30-amendment 2.pdf | ||
| Attachment 8-20210419_USACE_PCN_SilverLakeBoardwalk_signed.pdf | ||
| Questions and Answers_Silver Lake Boardwalk 5-6-2022.pdf | ||
| SF30-amendment 1.pdf | ||
| Questions and Answers_Silver Lake Boardwalk.pdf | ||
| DSC00220a.JPG | JPG image | |
| IMGP2000a.JPG | JPG image | |
| IMGP2099a.JPG | JPG image | |
| IMGP1989a.JPG | JPG image | |
| IMG_6484a.JPG | JPG image | |
| IMGP2110a.JPG | JPG image | |
| Attachment 2-SilverLake Drawings.Final.03.22.2021.Signed.pdf | ||
| Attachment 5-Dept of Army Verification-2021.07.16-NWP-Verify-202100364.pdf | ||
| Attachment 1-Specifications.pdf | ||
| 1240LT22R0005-GAOA-UWC Silver Lake Boardwalk-final.pdf | ||
| Attachment 7-Performance.Experience.Technical.Forms.pdf | ||
| Attachment 6-Dept of Army Enclosure 2021.07.16-NWP-Verify Encls-202100364.pdf | ||
| Attachment 3-GeotechStudyReport.SilverLake.Final.07.28.2014.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X X
X X
X
X
File details come from the government source that posted it. Updated .