Building 518 Replace Chillers
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 5845871
- Agency
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Z2CA Repair Or Alteration Of Schools
- Place of performance
- Groton CT 06349 USA
Notice details come from SAM.gov. Updated .
Notice text
** Only those Contractors listed in the RFP MACC solicitation below will be allowed to bid on this requirement.
1. The Oak Group Inc.
2. Pontiac Drywall Systems, Inc.
3. QBS, Inc.
4. Smart ATI/KMK Joint Venture
The scope of this project is to provide and commission two new chillers with associated chilled water and condenser water pumps for Building 518 located at SUBASE New London in Groton, CT. The chilled water plant was originally designed for three chillers and three roof mounted cooling towers. The current system uses two chillers and two roof mounted cooling towers.
The base bid for this project must replace one of the existing chillers, associated pumps, and provide a new third chiller with associated pumps; resulting in three chillers total for the facility. Replacement of the other existing chiller is detailed as part of Option #1 below.
The existing cooling towers were installed in 2019. See Part 6 – Attachments of the SOW for detailed information regarding original system configuration and equipment information. Reuse existing equipment pads to the greatest extent possible.
New equipment must be selected based on efficiency, capacity and features (not manufacturer). A cooling load analysis is not required; however, a sequence of operation detailing the staging of the chillers must be provided.
New equipment must meet or exceed the energy efficiency ratings of ASHRAE 90.1-2013 as specified in UFC 1-200-02. New equipment must be fully integrated into the buildings DDC system. Equipment and controls must be commissioned by a first-tier commissioning subcontractor. The list of equipment for the Base Bid is detailed in Table 1 below. B518 is a secure facility. Project will require escorts (Government provided) for work inside the building. Refer to Part 6 – Attachments of SOW for record drawings, system diagrams and sequences of operation. (Attachment A)
BID OPTIONS
Option #1: Replace existing chiller (Chiller – 1) and associated pumps.
Option #2: Provide temporary chiller(s) to maintain chilled water service to the building for a duration of three months. Total capacity of temporary chiller(s) must not exceed 300 tons.
Attachments
| File | Type | Posted |
|---|---|---|
| RFP 5845871 Amendment 0003.pdf | ||
| BASE MAP 09-14-2017 (1).pdf | ||
| B518 Architectural Record Drawings.pdf | ||
| part_3_statement_of_work_R1.pdf | ||
| B518 Electrical Record Drawings.pdf | ||
| RFP 5845871 Amendment 0002.pdf | ||
| RFP 5845871 Amendment 0001.pdf | ||
| (C) Wages CT20210024.pdf | ||
| (G) General Req Revised -9 2018.pdf | ||
| (K) 2016-R-0149.pdf | ||
| (B) Price Proposal Form.pdf | ||
| (D) Base Access Pass Request.pdf | ||
| RFP 5845871 B518 Replace Chillers.pdf | ||
| (A) B518 Replace Chillers Specs.pdf | ||
| (E) NAVFAC RFI form.pdf | ||
| (F) 01 31 23.13 20 ECMS Spec.pdf | ||
| (H) BASE MAP BLDG 135.pdf | ||
| (I) 52.204-24.pdf | ||
| (J) Building Contractors Guide to Taxes.pdf | ||
| (L) CERT-141.pdf | ||
| (M) Limitations on Subcontracting.xls | XLS spreadsheet |
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| Building 518 Replace Chillers | Award Notice | |
| Building 518 Replace Chillers | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity