(E) NAVFAC RFI form.pdf

PDF 259 KB Posted

Attached to
Building 518 Replace Chillers Federal contract opportunity
Solicitation number
5845871
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Building 518 Replace Chillers, newest first.
File Type Posted
part_3_statement_of_work_R1.pdf PDF
RFP 5845871 Amendment 0003.pdf PDF
BASE MAP 09-14-2017 (1).pdf PDF
B518 Architectural Record Drawings.pdf PDF
B518 Electrical Record Drawings.pdf PDF
RFP 5845871 Amendment 0002.pdf PDF
RFP 5845871 Amendment 0001.pdf PDF
RFP 5845871 B518 Replace Chillers.pdf PDF
(A) B518 Replace Chillers Specs.pdf PDF
(B) Price Proposal Form.pdf PDF
(D) Base Access Pass Request.pdf PDF
(C) Wages CT20210024.pdf PDF
(G) General Req Revised -9 2018.pdf PDF
(K) 2016-R-0149.pdf PDF
(F) 01 31 23.13 20 ECMS Spec.pdf PDF
(H) BASE MAP BLDG 135.pdf PDF
(I) 52.204-24.pdf PDF
(J) Building Contractors Guide to Taxes.pdf PDF
(L) CERT-141.pdf PDF
(M) Limitations on Subcontracting.xls XLS spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

RFP 5845871

REQUEST FOR INFORMATION RFI NUMBER:

CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:

COST EFFECT: INCREASE: DECREASE: NONE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By: Date: Signature:

From:

To: Field Office Code

RECOMMENDATION:

Date: Signature:

From: Field Office To: Prime Contractor

REPLY:

Date: Signature:

This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.

Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT

CONSTITUTE AUTHORIZATION TO PROCEED.

copy to: File 2L

Supv Civil Engineer Construction Representative

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.

DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER