(M) Limitations on Subcontracting.xls

XLS spreadsheet 40 KB Posted

Attached to
Building 518 Replace Chillers Federal contract opportunity
Solicitation number
5845871
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Building 518 Replace Chillers, newest first.
File Type Posted
part_3_statement_of_work_R1.pdf PDF
RFP 5845871 Amendment 0003.pdf PDF
BASE MAP 09-14-2017 (1).pdf PDF
B518 Architectural Record Drawings.pdf PDF
B518 Electrical Record Drawings.pdf PDF
RFP 5845871 Amendment 0002.pdf PDF
RFP 5845871 Amendment 0001.pdf PDF
RFP 5845871 B518 Replace Chillers.pdf PDF
(A) B518 Replace Chillers Specs.pdf PDF
(B) Price Proposal Form.pdf PDF
(D) Base Access Pass Request.pdf PDF
(C) Wages CT20210024.pdf PDF
(G) General Req Revised -9 2018.pdf PDF
(K) 2016-R-0149.pdf PDF
(E) NAVFAC RFI form.pdf PDF
(F) 01 31 23.13 20 ECMS Spec.pdf PDF
(H) BASE MAP BLDG 135.pdf PDF
(I) 52.204-24.pdf PDF
(J) Building Contractors Guide to Taxes.pdf PDF
(L) CERT-141.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

POST-AWARD CONTRACTOR'S LIMITATIONS
ON SUBCONTRACTING CERTIFICATION
From:Contractor
To:Mike Giangregorio
PWD New London
Naval Facilities Engineering Systems Command, Mid-Atlantic
Subj:Contract No.
1. Prime contractor is to complete and submit the following for each reporting period (6 months) for each performance period (Base Year and Options).
Block 1Block 2Block 3Block 4Block 5Block 6Block 7
Period of PerformanceFFP &
Task Order # (list TO#)Prime
Labor CostSub
Labor CostTotal FFP or Task Order Labor Cost% Cost Performed by Prime% Cost Performed by Sub
FFP$0.00$0.00$0.000%0%
CLIN 0001$0.00$0.000%0%
CLIN 0002$0.000%0%
CLIN0003$0.000%0%
TOTAL FOR CURRENT REPORTING PERIOD$0.00$0.00$0.000%0%
TO XXXX$0.000%0%
TO XXXX$0.000%0%
Etc.$0.000%0%
** add rows here$0.000%0%
TOTAL FOR PREVIOUS REPORTING PERIOD$0.00$0.00$0.000%0%
Total$0.000%0%
Total$0.000%0%
Total$0.000%0%
Total$0.000%0%
Total$0.000%0%
CONTRACT TOTAL$0.00$0.00$0.000%0%
2. Furthermore, in accordance with the provisions of FAR 52.219-14, Limitations on Subcontracting (Nov 2011), 13 CFR 124.510 and 13 CFR 125.6, in the performance of this contract,
In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees.
In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products Contractor has performed at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials).
In the case of a contract for general construction, Cambridge Marine Construction has performed at least 15 percent of the cost of the contract with its own employees (not including the costs of materials).
In the case of a contract for construction by special trade contractors, contractor has performed at least 25 percent of the cost of the contract with its own employees (not including the cost of materials).
I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report.
CONTRACTOR:
SIGNATUREDATE
NAME AND TITLE

&CPage &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .