RFP 5845871 Amendment 0001.pdf

PDF 1 MB Posted

Attached to
Building 518 Replace Chillers Federal contract opportunity
Solicitation number
5845871
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Building 518 Replace Chillers, newest first.
File Type Posted
RFP 5845871 Amendment 0003.pdf PDF
BASE MAP 09-14-2017 (1).pdf PDF
B518 Architectural Record Drawings.pdf PDF
part_3_statement_of_work_R1.pdf PDF
B518 Electrical Record Drawings.pdf PDF
RFP 5845871 Amendment 0002.pdf PDF
(B) Price Proposal Form.pdf PDF
(D) Base Access Pass Request.pdf PDF
(E) NAVFAC RFI form.pdf PDF
(F) 01 31 23.13 20 ECMS Spec.pdf PDF
(H) BASE MAP BLDG 135.pdf PDF
(I) 52.204-24.pdf PDF
(J) Building Contractors Guide to Taxes.pdf PDF
(L) CERT-141.pdf PDF
(M) Limitations on Subcontracting.xls XLS spreadsheet
(C) Wages CT20210024.pdf PDF
(G) General Req Revised -9 2018.pdf PDF
(K) 2016-R-0149.pdf PDF
RFP 5845871 B518 Replace Chillers.pdf PDF
(A) B518 Replace Chillers Specs.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(SEE ITEM 13)

RFI 001

Can you please confirm that this project is Design Build and Not Design Bid Build? If so can you please clarify what the Govt would like to see in a design?

Response

The RFP is in the standard NAVFAC 6-Part DB RFP format.

For design effort, Contractor’s should refer to RFP Part 2, Section 01 33 10.05 20 Design Submittal Procedures. As indicated in subparagraph “i” of section 1.3, Contractors are encouraged to prepare design drawings more like shop drawings to minimize construction submittals. However, at minimum, the Contractor’s design should include:

Basis of Design narrative; shop drawings indicating new equipment, electrical connections, piping layouts, equipment schedules and control sequences; specifications.

A cooling load analysis/calculation is not required as new chiller sizes were provided in the RFP.