Bank Stabilization on Big River - St. Louis District USACE
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P920R0060
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Dittmer MO 63023 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for a bank stabilization project along the Big River to be implemented by the U.S. Army Corps of Engineers St. Louis District in conjunction with the U.S. Environmental Protection Agency and U.S. Fish and Wildlife Service. The project objectives are to provide stability to the bankline and stream channel through stabilization methods including bank stabilization, in-stream structures, pilot channel creation and riparian planting to reduce terrestrial lead contamination entering the aquatic system. Proposals will be evaluated based on resource plan, company experience, past performance, and price using best value tradeoff procedures. A mandatory site visit was held on October 19th and questions are due by October 23, 2020.
The total small business set-aside has a NAICS code of 237990. The estimated value is between $1,000,000 to $3,000,000 for a 180-day performance period to take place in Dittmer, Missouri. Proposals are due by November 10, 2020 and the contract will be awarded based on a subjective tradeoff of technical and price factors. Representatives from various construction and environmental firms attended the mandatory pre-bid site visit.
Notice text
3 versions
Update #3 · Latest ·
Bank Stabilization Project on the Big River
This Bank Stabilization Project is being implemented for USACE in conjunction w ith the Environmental Protection Agency (EPA) and the U.S. Fish and Wildlife Service (USFWS). The overall goal of the project is to reduce terrestrial lead contamination from entering the aquatic system and further contaminating dow nstream areas. This w ill be accomplished by providing stability to bankline and stream channel alignment through bank stabilization, in-stream stone structures, pilot channel creation, and riparian tree planting.
The contract duration is 180 days. The Estimated Range (in accordance w ith FAR 36.204) is between $1,000,000 and $3,000,000.
A selection w ill be made based on Best Value using the Subjective Trade-Off method.
Site Visit is scheduled and mandatory. Please see Solicitation Clause FAR 52.236-27 for full details.
Questions pertaining to this solicitation are due by 10:00am CST, 23 October 2020 to Contract Specialist, Whitney Dee, via email at whitney.r.dee@usace.army.mil.
AMENDMENT 0001 - adds Attachment 5 - PreBid Questions & Government Answers and Attachment 5 - PreBid Site Visit Attendance Sheet.
AMENDMENT 0002 - updates Plans (G-002.1 and C-100.1) and Specifications (paragraph 1.23 (b)(2) and 1.25) and extends the proposal due date. See the following attachments: Solicitation - Amendment 0002, Attachment 3 - Plans - Amendment 0002, and Attachment 4 - Specifications - Amendment 0002.
Update #2 ·
Bank Stabilization Project on the Big River
This Bank Stabilization Project is being implemented for USACE in conjunction w ith the Environmental Protection Agency (EPA) and the U.S. Fish and Wildlife Service (USFWS). The overall goal of the project is to reduce terrestrial lead contamination from entering the aquatic system and further contaminating dow nstream areas. This w ill be accomplished by providing stability to bankline and stream channel alignment through bank stabilization, in-stream stone structures, pilot channel creation, and riparian tree planting.
The contract duration is 180 days. The Estimated Range (in accordance w ith FAR 36.204) is between $1,000,000 and $3,000,000.
A selection w ill be made based on Best Value using the Subjective Trade-Off method.
Site Visit is scheduled and mandatory. Please see Solicitation Clause FAR 52.236-27 for full details.
Questions pertaining to this solicitation are due by 10:00am CST, 23 October 2020 to Contract Specialist, Whitney Dee, via email at whitney.r.dee@usace.army.mil.
AMENDMENT 0001 - adds Attachment 5 - PreBid Questions & Government Answers and Attachment 5 - PreBid Site Visit Attendance Sheet.
Update #1 ·
Bank Stabilization Project on the Big River
This Bank Stabilization Project is being implemented for USACE in conjunction w ith the Environmental Protection Agency (EPA) and the U.S. Fish and Wildlife Service (USFWS). The overall goal of the project is to reduce terrestrial lead contamination from entering the aquatic system and further contaminating dow nstream areas. This w ill be accomplished by providing stability to bankline and stream channel alignment through bank stabilization, in-stream stone structures, pilot channel creation, and riparian tree planting.
The contract duration is 180 days. The Estimated Range (in accordance w ith FAR 36.204) is between $1,000,000 and $3,000,000.
A selection w ill be made based on Best Value using the Subjective Trade-Off method.
Site Visit is scheduled and mandatory. Please see Solicitation Clause FAR 52.236-27 for full details.
Questions pertaining to this solicitation are due by 10:00am CST, 23 October 2020 to Contract Specialist, Whitney Dee, via email at whitney.r.dee@usace.army.mil.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bank Stabilization on Big River - St. Louis District USACE | Award Notice | |
| This notice | Solicitation | |
| Bank Stabilization on Big River - St. Louis District USACE | Pre-Solicitation | |
| Bank Stabilization on Big River - St. Louis District USACE | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Belle Fountain Ditch Cleanout Phase 2 | ENDIST Memphis | Service-Disabled Veteran-Owned Small Business | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| Region 7 Southeast Mines Superfund Site | ENDIST St Louis | No set-aside | |
| Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (nesp) | ENDIST St Louis | No set-aside | |
| Joe Pool Dam Slide Repairs | ENDIST Fort Worth | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity