Bank Stabilization on Big River - St. Louis District USACE
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912P920R0060
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, St. Louis District is seeking capability statements from businesses for a bank stabilization project along 4,000 linear feet of the Big River in Missouri. The project aims to reduce terrestrial lead contamination entering the aquatic system through bank stabilization, in-stream structures, pilot channel creation, and riparian planting. Interested parties must demonstrate experience as a prime contractor performing excavation, grading, embankment construction, and biotechnical bank stabilization. Capability statements must include evidence of bondability up to $3 million and will be evaluated based on relevant past performance and experience. Statements are due by August 14, 2020.
There is no set-aside designation for this project. The estimated contract value ranges from $1-3 million to be performed under NAICS codes 237110 and 237310. The U.S. Army Corps of Engineers, St. Louis District will implement the project in conjunction with the Environmental Protection Agency and U.S. Fish and Wildlife Service.
Notice text
This Bank Stabilization Project is being implemented for the USACE in conjunction with the Environmental Protection Agency (EPA) and the U.S. Fish and Wildlife Service (USFWS). The overall goal of the project is to reduce terrestrial lead contamination from entering the aquatic system and further contaminating downstream areas. This will be accomplished by providing stability to bankline and stream channel alignment through bank stabilization, in-stream stone structures, pilot channel creation, and riparian tree planting.
Please read attached Sources Sought Notice for all details, and response submittal requirements.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - Bank Stabilization Big River.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bank Stabilization on Big River - St. Louis District USACE | Award Notice | |
| Bank Stabilization on Big River - St. Louis District USACE | Solicitation | |
| Bank Stabilization on Big River - St. Louis District USACE | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Region 7 Southeast Mines Superfund Site | ENDIST St Louis | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity